Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Optimization of the joint start-up mode of the hoisting and slewing mechanisms of a boom

View through CrossRef
To increase the productivity of boom cranes, joint movement of mechanisms is performed. The simultaneous start-up of mechanisms significantly increases dynamic loads and intensifies oscillations of structural elements and loads on a flexible suspension reducing the reliability of crane operation and increasing energy losses. Therefore, the optimization problem of the joint start-up of the slewing and load hoisting mechanisms of a boom crane is stated and solved in the article. To optimize the joint start-up of the mechanisms, the boom system is represented by a 5-DOF dynamic model. For such a dynamic model of a boom crane, a mathematical model is developed in the form of a system of nonlinear differential equations of the second order. The optimization problem includes an optimization criterion and constraints on the driving torques and boundary conditions. An approximate modified metaheuristic PSO method was used to solve the nonlinear optimization problem. Based on the calculation, the optimal modes of joint start-up of the mechanisms for load slewing and hoisting of a boom crane were determined, making it possible to minimize dynamic loads and, as a result, reduce oscillations of the system links and energy consumption of the drives.
Title: Optimization of the joint start-up mode of the hoisting and slewing mechanisms of a boom
Description:
To increase the productivity of boom cranes, joint movement of mechanisms is performed.
The simultaneous start-up of mechanisms significantly increases dynamic loads and intensifies oscillations of structural elements and loads on a flexible suspension reducing the reliability of crane operation and increasing energy losses.
Therefore, the optimization problem of the joint start-up of the slewing and load hoisting mechanisms of a boom crane is stated and solved in the article.
To optimize the joint start-up of the mechanisms, the boom system is represented by a 5-DOF dynamic model.
For such a dynamic model of a boom crane, a mathematical model is developed in the form of a system of nonlinear differential equations of the second order.
The optimization problem includes an optimization criterion and constraints on the driving torques and boundary conditions.
An approximate modified metaheuristic PSO method was used to solve the nonlinear optimization problem.
Based on the calculation, the optimal modes of joint start-up of the mechanisms for load slewing and hoisting of a boom crane were determined, making it possible to minimize dynamic loads and, as a result, reduce oscillations of the system links and energy consumption of the drives.

Related Results

Optimization of the joint startup of the boom and load hoisting mechanisms of a jib crane
Optimization of the joint startup of the boom and load hoisting mechanisms of a jib crane
During the joint motion of the boom and load hoisting mechanisms, dynamic loads increase, leading to additional energy consumption, which subsequently contributes to the deteriorat...
Analysis of derrikingand slewing of the tower crane with consideration to driving mechanisms characteristics
Analysis of derrikingand slewing of the tower crane with consideration to driving mechanisms characteristics
The variational problem of the movement mode selection for the load outreach change mechanism during a steady-state tower crane slewing was formulated and solved in the paper, that...
Use of artificial neural networks for solving the problem of residual resource estimation of hoisting cranes
Use of artificial neural networks for solving the problem of residual resource estimation of hoisting cranes
The work is devoted to the problems of practical application of artificial neural networks (ANN) for estimation of residual resource of hoisting machines on the example of estimati...
Comparison of Three Commercial Automatic Boom Height Systems for Agricultural Sprayers
Comparison of Three Commercial Automatic Boom Height Systems for Agricultural Sprayers
HighlightsThree automatic boom height systems were compared: BoomTrac Pro (A), AutoBoom XRT (B), and UC5 Passive Roll (C).Boom leveling performance was quantified for three runs on...
Co-simulation model coupling of flexible rope hoisting system and hydraulic braking system for a mine hoist
Co-simulation model coupling of flexible rope hoisting system and hydraulic braking system for a mine hoist
The hoist is an important equipment in the mine pit. Since the containers are lifted or lowered with flexible steel wire ropes, there are shocks and vibrations during operation, es...
Optimisation of tower crane rotation mechanism force acceleration mode at steady payload hoisting
Optimisation of tower crane rotation mechanism force acceleration mode at steady payload hoisting
The process of optimisation of the force acceleration mode of the rotation mechanism of the tower crane with the beam jib at steady payload hoisting was examined in the presented p...
Lifting and Hoisting Safety—Raising the Bar
Lifting and Hoisting Safety—Raising the Bar
Abstract One of the major causes of incidents and fatalities associated with E&P activities is in the category of Lifting and Hoisting operations. Within this ca...
ANALISIS INFORMASI ANATOMI PENGGUNAAN PROYEKSI SKYLINE PADA PEMERIKSAAN KNEE JOINT POST ARTHROSCOPY
ANALISIS INFORMASI ANATOMI PENGGUNAAN PROYEKSI SKYLINE PADA PEMERIKSAAN KNEE JOINT POST ARTHROSCOPY
Latar belakang: knee Joint atau sendi lutut merupakan salah satu sendi terbesar dalam tubuh, sendi ini merupakan sendi yang kompleks. Osteoarthritis merupakan kelainan sendi degene...

Back to Top