Javascript must be enabled to continue!
Multi-stage hybrid flow shop scheduling problem with lag, unloading, and transportation times
View through CrossRef
This study aims to address a variant of the hybrid flow shop problem by simultaneously integrating lag times, unloading times, and transportation times, with the goal of minimizing the maximum completion time, or makespan. With applications in image processing, manufacturing, and industrial environments, this problem presents significant theoretical challenges, being classified as NP-hard. Notably, the problem demonstrates a notable symmetry property, resulting in a symmetric problem formulation where both the scheduling problem and its symmetric counterpart share the same optimal solution. To improve solution quality, all proposed procedures are extended to the symmetric problem. This research pioneers the consideration of the hybrid flow shop scheduling problem with simultaneous attention to lag, unloading, and transportation times, building upon a comprehensive review of existing literature. A two-phase heuristic is introduced as a solution to this complex problem, involving iterative solving of parallel machine scheduling problems. This approach decomposes the problem into manageable sub-problems, facilitating focused and efficient resolution. The efficient solving of sub-problems using the developed heuristic yields satisfactory near-optimal solutions. Additionally, two new lower bounds are proposed, derived from estimating minimum idle time within each stage via solving a polynomial parallel machine problem aimed at minimizing total flow time. These lower bounds serve to evaluate the performance of the developed two-phase heuristic, over measuring the relative gap. Extensive experimental studies on benchmark test problems of varying sizes demonstrate the effectiveness of the proposed approaches. All test problems are efficiently solved within reasonable timeframes, indicating practicality and efficiency. The proposed methods exhibit an average computational time of 8.93 seconds and an average gap of 2.75%. These computational results underscore the efficacy and potential applicability of the proposed approaches in real-world scenarios, providing valuable insights and paving the way for further research and practical implementations in hybrid flow shop scheduling.
Title: Multi-stage hybrid flow shop scheduling problem with lag, unloading, and transportation times
Description:
This study aims to address a variant of the hybrid flow shop problem by simultaneously integrating lag times, unloading times, and transportation times, with the goal of minimizing the maximum completion time, or makespan.
With applications in image processing, manufacturing, and industrial environments, this problem presents significant theoretical challenges, being classified as NP-hard.
Notably, the problem demonstrates a notable symmetry property, resulting in a symmetric problem formulation where both the scheduling problem and its symmetric counterpart share the same optimal solution.
To improve solution quality, all proposed procedures are extended to the symmetric problem.
This research pioneers the consideration of the hybrid flow shop scheduling problem with simultaneous attention to lag, unloading, and transportation times, building upon a comprehensive review of existing literature.
A two-phase heuristic is introduced as a solution to this complex problem, involving iterative solving of parallel machine scheduling problems.
This approach decomposes the problem into manageable sub-problems, facilitating focused and efficient resolution.
The efficient solving of sub-problems using the developed heuristic yields satisfactory near-optimal solutions.
Additionally, two new lower bounds are proposed, derived from estimating minimum idle time within each stage via solving a polynomial parallel machine problem aimed at minimizing total flow time.
These lower bounds serve to evaluate the performance of the developed two-phase heuristic, over measuring the relative gap.
Extensive experimental studies on benchmark test problems of varying sizes demonstrate the effectiveness of the proposed approaches.
All test problems are efficiently solved within reasonable timeframes, indicating practicality and efficiency.
The proposed methods exhibit an average computational time of 8.
93 seconds and an average gap of 2.
75%.
These computational results underscore the efficacy and potential applicability of the proposed approaches in real-world scenarios, providing valuable insights and paving the way for further research and practical implementations in hybrid flow shop scheduling.
Related Results
Hubungan Perilaku Pola Makan dengan Kejadian Anak Obesitas
Hubungan Perilaku Pola Makan dengan Kejadian Anak Obesitas
<p><em><span style="font-size: 11.0pt; font-family: 'Times New Roman',serif; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-US; mso-fareast-langua...
Study on the Influence of Excavation Unloading on Pile Depth in Sandy Soil
Study on the Influence of Excavation Unloading on Pile Depth in Sandy Soil
With the development of urban construction, uplift pile has been widely used in underground structure bearing buoyancy. The pile is buried deep underground, and the foundation pit ...
Faktor Terjadinya Keterlambatan Waktu bongkar muat Kontainer MV. Oriental Jade di Pelabuhan Manokwari
Faktor Terjadinya Keterlambatan Waktu bongkar muat Kontainer MV. Oriental Jade di Pelabuhan Manokwari
The purpose of this study is to determine the factors causing delays in loading and unloading time of MV Oriental Jade at Manokwari Port, the impact of delays in loading and unload...
Osoby niejednokrotnie przebywające w izbie wytrzeźwień
Osoby niejednokrotnie przebywające w izbie wytrzeźwień
In Poland we have at present in towns 29 detoxication centres with 1,226 beds; people found by the police in public places in a state of intoxication are more and more often taken ...
Log Unloading at Logging Enterprise Berths
Log Unloading at Logging Enterprise Berths
In the development of market economy in Russia, the main trend in the log processing industry is the implementation of the cutting edge technology and effective innovation in order...
A study on Multi-objective Flexible Job-shop Dynamic Scheduling Based on Control Window
A study on Multi-objective Flexible Job-shop Dynamic Scheduling Based on Control Window
Abstract
It is of great practical significance to study the dynamic scheduling of production in flexible job-shop. In the flexible job-shop scheduling, process, cost...
Experimental study on acoustic emission frequency characteristics of granite under different cyclic loading and unloading
Experimental study on acoustic emission frequency characteristics of granite under different cyclic loading and unloading
Abstract
In Granite acoustic emission tests were performed during three different cyclic loading and unloading processes. The relationship between the acoustic emiss...
Analisis Kinerja Layanan Bongkar Muat General Cargo Di Pelabuhan Cappa Ujung Parepare
Analisis Kinerja Layanan Bongkar Muat General Cargo Di Pelabuhan Cappa Ujung Parepare
The purpose of this research is to (1) determine the percentage of loading and unloading productivity at the Port of Cappa Ujung Parepare (2) to find out the criteria that have goo...

