Javascript must be enabled to continue!
A study on Multi-objective Flexible Job-shop Dynamic Scheduling Based on Control Window
View through CrossRef
Abstract
It is of great practical significance to study the dynamic scheduling of production in flexible job-shop. In the flexible job-shop scheduling, process, cost, machine tool and processing environment constitute the constraint set of scheduling. In this paper, starting from the multi constraints of scheduling system, the multi-objective linear synthesis of cost, time, quality and resource utilization is carried out. The scheduling intelligent algorithm is improved by using the polychromatic sets contour matrix to improve the operational efficiency. On the basis of the multi-objective flexible job-shop scheduling model under this multi constraints condition, from the actual situation of production scheduling, this paper constructs a scheduling control window according to the dynamic influence domain formed by the dynamic factors in the scheduling process. Dynamic scheduling control is carried out through control window to realize flexible scheduling and intelligent production. The effectiveness and feasibility of the model are verified by dynamic scheduling analysis of a simulation example.
Title: A study on Multi-objective Flexible Job-shop Dynamic Scheduling Based on Control Window
Description:
Abstract
It is of great practical significance to study the dynamic scheduling of production in flexible job-shop.
In the flexible job-shop scheduling, process, cost, machine tool and processing environment constitute the constraint set of scheduling.
In this paper, starting from the multi constraints of scheduling system, the multi-objective linear synthesis of cost, time, quality and resource utilization is carried out.
The scheduling intelligent algorithm is improved by using the polychromatic sets contour matrix to improve the operational efficiency.
On the basis of the multi-objective flexible job-shop scheduling model under this multi constraints condition, from the actual situation of production scheduling, this paper constructs a scheduling control window according to the dynamic influence domain formed by the dynamic factors in the scheduling process.
Dynamic scheduling control is carried out through control window to realize flexible scheduling and intelligent production.
The effectiveness and feasibility of the model are verified by dynamic scheduling analysis of a simulation example.
Related Results
Work Values
Work Values
Research has identified TV series and, also more recently social media, as different actors in vocational socialization, providing individuals with career-related information (Levi...
Real time scheduling system (RTSS)
Real time scheduling system (RTSS)
Traditional research in Job Shop Scheduling (JSS) is largely based on combinatorial analysis. Unfortunately, the NP-complete nature of the problem forces many assumptions into exis...
JOB DEMANDS DAN JOB RESOURCES (JD-R) PENGARUHNYA TERHADAP PRODUKTIVITAS KARYAWAN
JOB DEMANDS DAN JOB RESOURCES (JD-R) PENGARUHNYA TERHADAP PRODUKTIVITAS KARYAWAN
Produktivitas karyawan yang stabil dan sesuai target adalah merupakan faktor yang sangat penting untuk menjaga kelangsungan hidup perusahaan tetapi untuk menciptakan ...
Nonlinear optimal control for robotic exoskeletons with electropneumatic actuators
Nonlinear optimal control for robotic exoskeletons with electropneumatic actuators
Purpose
To provide high torques needed to move a robot’s links, electric actuators are followed by a transmission system with a high transmission rate. For instance, gear ratios of...
Job Standardization and Employee Voice
Job Standardization and Employee Voice
An organization expects its employees to comply with job standardization to improve its production efficiency, while also expecting them to make suggestions to improve their job pe...
Anteseden Kinerja Karyawan PT. Bank Mandiri Persero Tbk Area Jakarta Cikini
Anteseden Kinerja Karyawan PT. Bank Mandiri Persero Tbk Area Jakarta Cikini
AbstractThe problem of this research comes from a phenomenon that occurred to employees in PT. Bank Mandiri (Persero) Tbk Area Jakarta Cikini. The objectives of the research are to...
DPTM: An Adaptive Scheduler Design Utilizing Timeslot Matching and Release Methods for Concurrent and Multi-task Interleaved Pipelining-oriented CGRA
DPTM: An Adaptive Scheduler Design Utilizing Timeslot Matching and Release Methods for Concurrent and Multi-task Interleaved Pipelining-oriented CGRA
Coarse-grained reconfigurable architectures (CGRAs) are increasingly employed as domain-specific accelerators due to their efficiency and flexibility. However, the existing CGRA ar...
Job Analysis for Industrial Training
Job Analysis for Industrial Training
Job analysis is the common basis for designing a training course or
programme, preparing performance tests, writing position (job)
descriptions, identifying performance appraisal c...

