Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

CONTINUOUS TUNNEL KILNS AT THE PLANT OF MOUNT CLEMENS POTTERY COMPANY 1, 2

View through CrossRef
ABSTRACT These two direct‐fired kilns (bisque and glost) are placed end to end in a specially constructed kiln building 825 feet long. Both kilns are fired with soft coal, hand stoked. Three motors are required, aggregating 8/14 horsepower on each kiln. Hydraulic car pushers are employed. A pressure of 8100 lbs. is required to move the 44 cars thru the bisque kiln. The bisque kiln cars hold 278 dozen ware each and at a 55‐minute car schedule, deliver over 7200 dozen ware per 24 hours at a fuel saving of more than 85% over the former periodic kiln operating at this plant. This bisque capacity is equivalent to that of thirteen 16/12 ft. diameter periodic kilns which would cost more to build than the bisque tunnel kiln.
Title: CONTINUOUS TUNNEL KILNS AT THE PLANT OF MOUNT CLEMENS POTTERY COMPANY 1, 2
Description:
ABSTRACT These two direct‐fired kilns (bisque and glost) are placed end to end in a specially constructed kiln building 825 feet long.
Both kilns are fired with soft coal, hand stoked.
Three motors are required, aggregating 8/14 horsepower on each kiln.
Hydraulic car pushers are employed.
A pressure of 8100 lbs.
is required to move the 44 cars thru the bisque kiln.
The bisque kiln cars hold 278 dozen ware each and at a 55‐minute car schedule, deliver over 7200 dozen ware per 24 hours at a fuel saving of more than 85% over the former periodic kiln operating at this plant.
This bisque capacity is equivalent to that of thirteen 16/12 ft.
diameter periodic kilns which would cost more to build than the bisque tunnel kiln.

Related Results

Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Abstract Due to the unique spatial structure, stress transfer mechanism, and construction disturbance characteristics of ultra-small spacing parallel overlapping tu...
Safety assessment of the construction of double track tunnels underneah exsiting railway tunnels
Safety assessment of the construction of double track tunnels underneah exsiting railway tunnels
The ground disturbance caused by the tunnel construction will inevitably have an impact on the upper part of the constructed tunnel structure, and the railroad tunnel requires a ve...
Comparison of prevalence of symptoms of carpal tunnel syndrome between dental students and dental practitioners - A cross-sectional study
Comparison of prevalence of symptoms of carpal tunnel syndrome between dental students and dental practitioners - A cross-sectional study
Background: carpal tunnel syndrome (CTS) arises from compression of the median nerve when it passes through the carpal tunnel in the wrist. Dental professionals use vibratory instr...
Daegaya Earthenware Kilns in Goryeong Region: Centering on the Remains of Goryeong Songnim-ri Earthenware Kilns
Daegaya Earthenware Kilns in Goryeong Region: Centering on the Remains of Goryeong Songnim-ri Earthenware Kilns
This study is to introduce the current condition and characteristics of ‘the remains of Songnim-ri earthenware Kilns’ recently excavated and to present the known places of earthenw...
Reconstruction of Emissions from Pottery Kilns in the Roman Period
Reconstruction of Emissions from Pottery Kilns in the Roman Period
 Reconstruction of Emissions from Pottery Kilns in the Roman Period Clemens Drüe (1), Michael Herdick (2) and Holger Schaaff (2)  1) Universität...
JARINGAN SOSIAL PERAJIN GERABAH DALAM MEMPERTAHANKAN USAHA di GAMPONG ME MATANG PANYANG ACEH UTARA
JARINGAN SOSIAL PERAJIN GERABAH DALAM MEMPERTAHANKAN USAHA di GAMPONG ME MATANG PANYANG ACEH UTARA
This study examines the Social Network of Pottery Craftsmen in Maintaining Their Business (Study in Gampong Me Matang Panyang, Tanah Pasir District, North Aceh Regency). This study...

Back to Top