Javascript must be enabled to continue!
Recent Activities and New Challenges for the EUR Organization
View through CrossRef
Abstract
Since 1991, the European Utility Requirements (EUR) organization has been developing and promoting harmonized technical specifications for the new mid- and large-size LWR designs to be proposed by the vendors in Europe. The EUR Organization issues and, from time to time, modifies and updates a report entitled “the EUR Document”. It consists of a comprehensive set of requirements covering the whole Nuclear Power Plant (NPP) and encompasses all aspects (safety, performance, competitiveness) and all parts of a NPP (nuclear island and conventional island). The main EUR Organization’s results obtained during the last years are in the three following fields: (1) The latest revision, Revision E, of the EUR Document was issued in December 2016. It includes revised safety requirements taking into account the most recent European and international standards issued by WENRA, IAEA and IEC after the Fukushima-Daishi accident. (2) The assessment of new designs. The presentation briefly recalls the EUR design assessment objectives and process and the status of the different EUR assessment projects. (3) Preparation of evolution of the EUR Document towards integration of requirements for Small Modular Light Water Reactors (SMLWR). The paper concludes by an overview of the future activities of the EUR Organization.
Title: Recent Activities and New Challenges for the EUR Organization
Description:
Abstract
Since 1991, the European Utility Requirements (EUR) organization has been developing and promoting harmonized technical specifications for the new mid- and large-size LWR designs to be proposed by the vendors in Europe.
The EUR Organization issues and, from time to time, modifies and updates a report entitled “the EUR Document”.
It consists of a comprehensive set of requirements covering the whole Nuclear Power Plant (NPP) and encompasses all aspects (safety, performance, competitiveness) and all parts of a NPP (nuclear island and conventional island).
The main EUR Organization’s results obtained during the last years are in the three following fields: (1) The latest revision, Revision E, of the EUR Document was issued in December 2016.
It includes revised safety requirements taking into account the most recent European and international standards issued by WENRA, IAEA and IEC after the Fukushima-Daishi accident.
(2) The assessment of new designs.
The presentation briefly recalls the EUR design assessment objectives and process and the status of the different EUR assessment projects.
(3) Preparation of evolution of the EUR Document towards integration of requirements for Small Modular Light Water Reactors (SMLWR).
The paper concludes by an overview of the future activities of the EUR Organization.
Related Results
Woningcorporaties en Vastgoedontwikkeling
Woningcorporaties en Vastgoedontwikkeling
This summary highlights the findings of the PhD-thesis ‘Woningcorporaties en Vastgoedontwikkeling: Fit for Use’ (‘Housing associations and Real Estate Development: Fit for Use?’). ...
Analysis of the Profitability of Heating a Retrofitted Building with an Air Heat Pump in Polish Climatic Conditions
Analysis of the Profitability of Heating a Retrofitted Building with an Air Heat Pump in Polish Climatic Conditions
The transformation of energy systems towards low emission is one of the key assumptions of the climate and energy policy of the European Union and many countries around the world. ...
Greece: ATE Bank Restructuring, 2012
Greece: ATE Bank Restructuring, 2012
The Agricultural Bank of Greece (ATE Bank) faced serious difficulties throughout 2008, 2009, and 2010. In 2011 and 2012, ATE Bank’s capital situation deteriorated further because o...
Floating Solar Energy Systems: A Review of Economic Feasibility and Cross-Sector Integration with Marine Renewable Energy, Aquaculture and Hydrogen
Floating Solar Energy Systems: A Review of Economic Feasibility and Cross-Sector Integration with Marine Renewable Energy, Aquaculture and Hydrogen
Excessive reliance on traditional energy sources such as coal, petroleum, and gas leads to a decrease in natural resources and contributes to global warming. Consequently, the adop...
Rezensionen/Reviews
Rezensionen/Reviews
Abstract
Reading in Christian Communities. Essays on Interpretation in the Early Church, ed. by Charles A. Bobertz and David Brakke, Christianity ...
Austria and Germany: Hypo Alpe Adria Capital Injection, 2008
Austria and Germany: Hypo Alpe Adria Capital Injection, 2008
<p>Hypo Alpe Adria (HAA) was Austria’s sixth-largest bank at the time of the Global Financial Crisis of 2007–2009 (GFC), with EUR 41.2 billion (USD 29.2 billion) in total ass...
Prediction of Uncertainty in Exploration of Unconventional Gas Reservoirs
Prediction of Uncertainty in Exploration of Unconventional Gas Reservoirs
Abstract
Once a new unconventional play is identified, companies would start acquiring sizable land holdings within the same play. Before acquiring, the companies wo...
Conditioning the Estimating Ultimate Recovery of Shale Wells to Reservoir and Completion Parameters
Conditioning the Estimating Ultimate Recovery of Shale Wells to Reservoir and Completion Parameters
Abstract
Oil and gas production from shale has increased significantly in the United States. Forecasting production and estimating ultimate recovery (EUR) using Decl...

