SAVING RESOURCES IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS

View through CrossRef
The article describes run-of-the-river hydroelectric power plants. The authors specify the importance of performing technical and economic calculations in justifying the large-sized units of the water-supplying channel of a run-of-the-river hydroelectric power plant: turbine pits and suction (discharge) pipes. The study shows that the amount of construction work and the total cost of building a hydroelectric power plant depend on the size of these water supply units. The research objective is to analyze the validity of establishing the main dimensions of the suction pipes for modern technical and economic conditions. The researchers use the discounted income method. The calculations are performed for a hydroelectric power plant with an elbow suction pipe. The analysis of how the operating conditions of a hydroelectric power plant influence the savings of construction resources is carried out. The analysis shows that saving construction resources by reducing the length of the suction pipe is justified if the hydroelectric power plamt is designed to work only at peak power loads. For hydroelectric power plants operating at semi-peak or base power loads, the additional construction costs would be appropriate if leading to the decrease in pressure loss and to the increase in electricity generation.
Title: SAVING RESOURCES IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS
Description:
The article describes run-of-the-river hydroelectric power plants.
The authors specify the importance of performing technical and economic calculations in justifying the large-sized units of the water-supplying channel of a run-of-the-river hydroelectric power plant: turbine pits and suction (discharge) pipes.
The study shows that the amount of construction work and the total cost of building a hydroelectric power plant depend on the size of these water supply units.
The research objective is to analyze the validity of establishing the main dimensions of the suction pipes for modern technical and economic conditions.
The researchers use the discounted income method.
The calculations are performed for a hydroelectric power plant with an elbow suction pipe.
The analysis of how the operating conditions of a hydroelectric power plant influence the savings of construction resources is carried out.
The analysis shows that saving construction resources by reducing the length of the suction pipe is justified if the hydroelectric power plamt is designed to work only at peak power loads.
For hydroelectric power plants operating at semi-peak or base power loads, the additional construction costs would be appropriate if leading to the decrease in pressure loss and to the increase in electricity generation.

Related Results

ENVIRONMENTAL MANAGEMENT IN JOINT STREAMS REGULATION BY TWO HYDROELECTRIC COMPLEXES
ENVIRONMENTAL MANAGEMENT IN JOINT STREAMS REGULATION BY TWO HYDROELECTRIC COMPLEXES
Lowland river water power developments are usually built to solve complex tasks on the basis of the requirements of rational use of water resources. First of all, operating conditi...
Hydroelectric Power: Balancing Renewable Energy Production with Aquatic Ecosystem Health
Hydroelectric Power: Balancing Renewable Energy Production with Aquatic Ecosystem Health
Hydroelectric power stands as a significant pillar in the global pursuit of renewable energy sources, yet its development and operation necessitate a delicate balance between energ...
Implementation of energy-saving projects within the framework of the energy mana-gement strategy at budget facilities
Implementation of energy-saving projects within the framework of the energy mana-gement strategy at budget facilities
The article is devoted to the issues of implementing energy-saving projects within the framework of the energy management strategy at the objects of the budget sphere. Based on the...
Household Determinants of Multi-Saving Behaviour in East Africa: Evidence from Uganda, Kenya, and Tanzania
Household Determinants of Multi-Saving Behaviour in East Africa: Evidence from Uganda, Kenya, and Tanzania
Abstract Household saving is central to financial resilience and long-term development, yet most empirical work treats saving as a binary outcome whether a househol...
Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant
Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant
A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion) energy to an electrical energy. In this research, it is desired to ...
The Role of the Theory of Planned Behavior in Explaining the Energy-Saving Behaviors of High School Students with Physical Impairments
The Role of the Theory of Planned Behavior in Explaining the Energy-Saving Behaviors of High School Students with Physical Impairments
People with physical impairments can help solve energy problems by participating in diverse energy-saving behaviors, such as switching off lights or turning off an air conditioner ...
Caragana High-Quality Development
Caragana High-Quality Development
As economic develop and population increase, there is an increasing demand for plant goods and ecological service. Because plant goods and service producing by original forest cann...

Back to Top