Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Peranan PBM PT Wahana Intradermaga Niaga pada Proses Bongkar Curah Kering di Pelabuhan Belawan

View through CrossRef
This paper is to determine the Role of PBM Wahana Intradermaga Niaga in the Dry Bulk Unloading Process at PT. Pelabuhan Belawan. Unloading activities are activities to unload goods from the ship's hold to the dock in the ship's hull or vice versa (stevedoring), activities to move goods from the dock using a conveyor to the warehouse/stacking yard or vice versa (cargodoring) and activities to pick up goods from the warehouse/yard carried onto a truck or vice versa (receiving/delivery). A dry bulk carrier is a ship specifically designed to be able to transport various dry bulk loads. In the distribution of dry bulk cargo there is an unloading process. Unloading aims to lower and raise goods from the ship to the port or vice versa. And in supporting this goal requires unloading equipment. The unloading equipment in question comes from the port. In carrying out the unloading process, MV. S Grace has obstacles in carrying out unloading. So that the purpose of unloading is not achieved optimally. Therefore, an analysis is needed to determine the factors that inhibit the productivity of dry bulk unloading so that unloading activities can run optimally. From the results of reading and observing this paper, the author states that the implementation of unloading has inhibiting factors, namely external factors. Crane breakdown and bad weather are inhibiting factors in the dry bulk unloading process. Based on these factors, it has an impact on unloading delays that are not according to schedule and increase ship queues. Therefore, the author suggests that port operators or ship crews carry out routine maintenance on the equipment used for loading and unloading so that dry bulk loading and unloading can run optimally. This paper uses the field research method and the library research method (data collection from the library).  
Title: Peranan PBM PT Wahana Intradermaga Niaga pada Proses Bongkar Curah Kering di Pelabuhan Belawan
Description:
This paper is to determine the Role of PBM Wahana Intradermaga Niaga in the Dry Bulk Unloading Process at PT.
Pelabuhan Belawan.
Unloading activities are activities to unload goods from the ship's hold to the dock in the ship's hull or vice versa (stevedoring), activities to move goods from the dock using a conveyor to the warehouse/stacking yard or vice versa (cargodoring) and activities to pick up goods from the warehouse/yard carried onto a truck or vice versa (receiving/delivery).
A dry bulk carrier is a ship specifically designed to be able to transport various dry bulk loads.
In the distribution of dry bulk cargo there is an unloading process.
Unloading aims to lower and raise goods from the ship to the port or vice versa.
And in supporting this goal requires unloading equipment.
The unloading equipment in question comes from the port.
In carrying out the unloading process, MV.
S Grace has obstacles in carrying out unloading.
So that the purpose of unloading is not achieved optimally.
Therefore, an analysis is needed to determine the factors that inhibit the productivity of dry bulk unloading so that unloading activities can run optimally.
From the results of reading and observing this paper, the author states that the implementation of unloading has inhibiting factors, namely external factors.
Crane breakdown and bad weather are inhibiting factors in the dry bulk unloading process.
Based on these factors, it has an impact on unloading delays that are not according to schedule and increase ship queues.
Therefore, the author suggests that port operators or ship crews carry out routine maintenance on the equipment used for loading and unloading so that dry bulk loading and unloading can run optimally.
This paper uses the field research method and the library research method (data collection from the library).
 .

Related Results

FAKTOR-FAKTOR PENYEBAB RENDAHNYA FUNGSI SHIP CRANE TERHADAP PROSES BONGKAR MUAT MV. MADISON
FAKTOR-FAKTOR PENYEBAB RENDAHNYA FUNGSI SHIP CRANE TERHADAP PROSES BONGKAR MUAT MV. MADISON
Dalam proses bongkar muat di sebuah kapal container sebuah alat bongkar muat sangatlah dibutuhkan dan juga kondis yang baik juga diperlukan dalam proses bongkar muatnya. Berdasarka...
Efektivitas Pelayanan Koperasi Tenaga Kerja Bongkar Muat (TKBM) Di Pelabuhan Teluk Nibung Kota Tanjung Balai
Efektivitas Pelayanan Koperasi Tenaga Kerja Bongkar Muat (TKBM) Di Pelabuhan Teluk Nibung Kota Tanjung Balai
Pelayanan jasa bongkar muat adalah kegiatan usaha yang bergerak dalam bidang bongkar muat barang dari dan ke kapal di pelabuhan.  Pekerjaan bongkar muat adalah pekerjaan yang mengg...
Peranan Daily Work Report dalam Bongkar Muatan Curah Kering pada PT. Wahana Intradermaga Niaga Belawan
Peranan Daily Work Report dalam Bongkar Muatan Curah Kering pada PT. Wahana Intradermaga Niaga Belawan
Belawan Port is a strategic port in North Sumatra with export-import activities reaching 5,000 tons per year, making it an important terminal in supporting international trade and ...
PROSES PENANGANAN BONGKAR MUAT EQUIPMENT DENGAN DOUBLE CRANE PADA PT SAMUDRA INDAH SEJAHTERA DI PELABUHAN TANJUNG EMAS SEMARANG
PROSES PENANGANAN BONGKAR MUAT EQUIPMENT DENGAN DOUBLE CRANE PADA PT SAMUDRA INDAH SEJAHTERA DI PELABUHAN TANJUNG EMAS SEMARANG
Kelancaran bongkar muat harus sesuai dengan kebutuhan dan penggunaan alat yang sedang beroperasi serta memerlukan perawatan yang baik untuk mendukung agar kapal bongkar muat equipm...
PROSEDUR BONGKAR MUAT CLINKER MV. ARLYN OLEH PT PELINDO MULTI TERMINAL DI PELABUHAN BELAWAN
PROSEDUR BONGKAR MUAT CLINKER MV. ARLYN OLEH PT PELINDO MULTI TERMINAL DI PELABUHAN BELAWAN
Penulisan makalah berikut menerapkan metode pengamatan lapangan (field study), metode wawancara (interview study) dan metode perpustakaan (library study) secara sederhana dengan me...
Keterlambatan Proses Bongkar Muat Gandum Pada Kapal MV SE Cardi di Pelabuhan Tanjung Intan Cilacap
Keterlambatan Proses Bongkar Muat Gandum Pada Kapal MV SE Cardi di Pelabuhan Tanjung Intan Cilacap
Abstrak: Proses bongkar muat gandum di Pelabuhan Tanjung Intan Cilacap mengalami inefisiensi yang signifikan. Faktor-faktor penyebab inefisiensi ini antara lain kondisi alam, kiner...
Analisis Karakteristik Curah Hujan di Wilayah Kabupaten Sinjai
Analisis Karakteristik Curah Hujan di Wilayah Kabupaten Sinjai
This study aims to determine: 1) The characteristics of rainfall in Sinjai district area; 2) Rainfall patterns and trends from each rainfall station in Sinjai district area; 3) Typ...

Back to Top