Expandable Liner Hanger Resolves Sealing Problems and Improves Integrity in Liner Completion Scenarios
View through CrossRef
Abstract
Conventional liner-hanger systems typically rely upon the primary cement job as the main method of sealing the liner/casing overlap, and liner-top packers are run either integrally with the liner hanger or separately in a second trip. In certain applications, however, cementing the complete liner may not be feasible or obtaining a primary cement seal at the liner top may not be achievable; in these situations, a liner-top packer must be used as the primary seal. In cases where the top of cement is above the overlap but below the hanger, the liner top packer is used as a back-up seal for the overlap.
Almost all liner-top packers that are run integrally to the liner hanger are set through the application of weight applied through the drill-pipe or landing string. The capability of the liner-top packer to seal with a single element at the maximum pressure rating requires that a sufficient setting force of up to 100,000 lbf be applied through the drill pipe to the packer mechanism. Work performed in Latin America recently showed the limitations of this process and how shallow liner-top installations might not have the string weight to apply a sufficient setting force to the liner-top packer.
A conventional alternative to an integral packer design is a secondary tie-back packer, but this alternative requires at least two extra trips into the wellbore and picking up of a string of large drill collars to supply the significant force required.
A solution was found that was capable of resolving this problem, and the innovative technology applied will be the focus of this paper. An expandable liner hanger that allows a hydraulic setting force to be applied locally to the hanger was used. The setting force for the packer was measurable and consistent. With the success experienced on the first well, the expandable liner hanger was used in subsequent jobs, and in all of them, the operator saved several days of rig time in addition to experiencing a successful completion.
Title: Expandable Liner Hanger Resolves Sealing Problems and Improves Integrity in Liner Completion Scenarios
Description:
Abstract
Conventional liner-hanger systems typically rely upon the primary cement job as the main method of sealing the liner/casing overlap, and liner-top packers are run either integrally with the liner hanger or separately in a second trip.
In certain applications, however, cementing the complete liner may not be feasible or obtaining a primary cement seal at the liner top may not be achievable; in these situations, a liner-top packer must be used as the primary seal.
In cases where the top of cement is above the overlap but below the hanger, the liner top packer is used as a back-up seal for the overlap.
Almost all liner-top packers that are run integrally to the liner hanger are set through the application of weight applied through the drill-pipe or landing string.
The capability of the liner-top packer to seal with a single element at the maximum pressure rating requires that a sufficient setting force of up to 100,000 lbf be applied through the drill pipe to the packer mechanism.
Work performed in Latin America recently showed the limitations of this process and how shallow liner-top installations might not have the string weight to apply a sufficient setting force to the liner-top packer.
A conventional alternative to an integral packer design is a secondary tie-back packer, but this alternative requires at least two extra trips into the wellbore and picking up of a string of large drill collars to supply the significant force required.
A solution was found that was capable of resolving this problem, and the innovative technology applied will be the focus of this paper.
An expandable liner hanger that allows a hydraulic setting force to be applied locally to the hanger was used.
The setting force for the packer was measurable and consistent.
With the success experienced on the first well, the expandable liner hanger was used in subsequent jobs, and in all of them, the operator saved several days of rig time in addition to experiencing a successful completion.
Related Results
Development of an Expandable Liner-Hanger System To Improve Reliability of Liner Installations
Development of an Expandable Liner-Hanger System To Improve Reliability of Liner Installations
Abstract
Liner hangers and liner-top packers are commonly used in the oil field in various liner applications. Unfortunately, in the traditional systems that empl...
Liner Completion Difficulties Resolved With Expandable Liner Top Technology
Liner Completion Difficulties Resolved With Expandable Liner Top Technology
Abstract
Liner top packers, which are run as a standalone unit or integrally with conventional liner hangers, are set through the application of weight applied th...
Case Histories: Liner-Completion Difficulties Resolved With Expandable Liner-Top Technology
Case Histories: Liner-Completion Difficulties Resolved With Expandable Liner-Top Technology
Abstract
Typically, Liner-hanger systems have relied upon the primary cement job to provide sealing of the liner/casing overlap. Liner top packers have been run e...
Deployment of Liner Systems in Extreme High Mud Weight Environments in Gas Wells
Deployment of Liner Systems in Extreme High Mud Weight Environments in Gas Wells
Abstract
During the development phase of a gas field, the abnormal pressure in a dolomitic limestone formation demanded an extremely high mud weight to control the w...
Optimal Configuration of a Double Liner System Including a Geomembrane Liner and a Composite Liner
Optimal Configuration of a Double Liner System Including a Geomembrane Liner and a Composite Liner
A number of landfills are designed with a double liner system that includes a geomembrane liner and a composite liner. The design engineer must select which of these two liners sho...
Expandable Cased-hole Liner Remediates Prolific Gas Well and Minimizes Loss of Production
Expandable Cased-hole Liner Remediates Prolific Gas Well and Minimizes Loss of Production
Abstract
As the petroleum industry ages, remediation of mature wells using cost-effective solutions is critical. Restoration of a well's production or mechanical ...
Expandable Tubulars Enable Multi-Zone Frac-Packing in the Open Hole
Expandable Tubulars Enable Multi-Zone Frac-Packing in the Open Hole
Abstract
Investigation is underway to enhance potential production rates by actualizing a method of frac-packing multi-zone slim holes and sidetracks using solid and...
Pengembangan Sistem Pendukung Keputusan Menggunakan Metode Tsukamoto
Pengembangan Sistem Pendukung Keputusan Menggunakan Metode Tsukamoto
Hanger maintenance process this time based on the circulation from hanger give to the production side. No standard calculation, looking for risk percentage for hanger go into maint...