Liner Completion Difficulties Resolved With Expandable Liner Top Technology
View through CrossRef
Abstract
Liner top packers, which are run as a standalone unit or integrally with conventional liner hangers, are set through the application of weight applied through the drill pipe or landing string. The capability of the liner top packer to seal at the stated pressures rated for which they are designed requires that a sufficient setting force of up to 355857.7 N (80,000 lbf) be applied through the drill pipe to the packer mechanism. Recently, work performed by an operator in Latin America showed the limitations of this process when used in shallow liner top installations where the available string weight alone to apply a sufficient setting force to the liner top packer is not available. Picking up a string of large drill collars in order to have the capability to supply the significant setting force required was an alternative. However, it was not a preferred option, safety being the main concern, followed by handling time, as was seen on the first well utilizing conventional liner hanger and liner hanger packer technology.
The expandable liner hanger (ELH) was developed as a solution to resolve the problem of weight down required to set the liner top and allowing a setting force to be applied to the packer elements locally through the hanger body with the use of hydraulic pressure. The setting force for the packer is measurable and consistent, ensuring that a liner top seal and hang weight is obtainable without requiring weight down. This system contains no moving parts, which makes it possible to function with a drill string. Once deployed in the well, the liner hanger body expands radially through the pressurization of its elastomeric elements, thus, creating a gas-tight seal and achieving zonal isolation. The operator chose to deploy the expandable liner hanger system on two subsequent wells following the initial attempt to utilize a conventional system approach. The ELH installations were successful, saving the operator several days of rig time on each well.
The case study discussion and system description presented in this paper will explain the flexibility and integrity of the expandable liner hanger in providing a liner top seal upon setting in a shallow liner top installation.
Introduction
Historically, problems obtaining a good primary cement job at the top of the liner have been associated with the installation of liners in oil and gas wells. Conventional liner hanger systems have relied upon the primary cement job to provide liner top pressure sealing integrity within the liner/casing overlap. In many wells however, cementing the complete liner and liner lap is often not achievable due to various problems, which include loss of circulation, fluid loss or other wellbore/formation conditions. In cases like these, obtaining a primary cement seal across the liner lap is not obtainable, and a liner top packer must be deployed on a second run to make the primary liner the top seal.
Society of Petroleum Engineers (SPE)
Title: Liner Completion Difficulties Resolved With Expandable Liner Top Technology
Description:
Abstract
Liner top packers, which are run as a standalone unit or integrally with conventional liner hangers, are set through the application of weight applied through the drill pipe or landing string.
The capability of the liner top packer to seal at the stated pressures rated for which they are designed requires that a sufficient setting force of up to 355857.
7 N (80,000 lbf) be applied through the drill pipe to the packer mechanism.
Recently, work performed by an operator in Latin America showed the limitations of this process when used in shallow liner top installations where the available string weight alone to apply a sufficient setting force to the liner top packer is not available.
Picking up a string of large drill collars in order to have the capability to supply the significant setting force required was an alternative.
However, it was not a preferred option, safety being the main concern, followed by handling time, as was seen on the first well utilizing conventional liner hanger and liner hanger packer technology.
The expandable liner hanger (ELH) was developed as a solution to resolve the problem of weight down required to set the liner top and allowing a setting force to be applied to the packer elements locally through the hanger body with the use of hydraulic pressure.
The setting force for the packer is measurable and consistent, ensuring that a liner top seal and hang weight is obtainable without requiring weight down.
This system contains no moving parts, which makes it possible to function with a drill string.
Once deployed in the well, the liner hanger body expands radially through the pressurization of its elastomeric elements, thus, creating a gas-tight seal and achieving zonal isolation.
The operator chose to deploy the expandable liner hanger system on two subsequent wells following the initial attempt to utilize a conventional system approach.
The ELH installations were successful, saving the operator several days of rig time on each well.
The case study discussion and system description presented in this paper will explain the flexibility and integrity of the expandable liner hanger in providing a liner top seal upon setting in a shallow liner top installation.
Introduction
Historically, problems obtaining a good primary cement job at the top of the liner have been associated with the installation of liners in oil and gas wells.
Conventional liner hanger systems have relied upon the primary cement job to provide liner top pressure sealing integrity within the liner/casing overlap.
In many wells however, cementing the complete liner and liner lap is often not achievable due to various problems, which include loss of circulation, fluid loss or other wellbore/formation conditions.
In cases like these, obtaining a primary cement seal across the liner lap is not obtainable, and a liner top packer must be deployed on a second run to make the primary liner the top seal.
Related Results
Development of an Expandable Liner-Hanger System To Improve Reliability of Liner Installations
Development of an Expandable Liner-Hanger System To Improve Reliability of Liner Installations
Abstract
Liner hangers and liner-top packers are commonly used in the oil field in various liner applications. Unfortunately, in the traditional systems that empl...
Case Histories: Liner-Completion Difficulties Resolved With Expandable Liner-Top Technology
Case Histories: Liner-Completion Difficulties Resolved With Expandable Liner-Top Technology
Abstract
Typically, Liner-hanger systems have relied upon the primary cement job to provide sealing of the liner/casing overlap. Liner top packers have been run e...
Optimal Configuration of a Double Liner System Including a Geomembrane Liner and a Composite Liner
Optimal Configuration of a Double Liner System Including a Geomembrane Liner and a Composite Liner
A number of landfills are designed with a double liner system that includes a geomembrane liner and a composite liner. The design engineer must select which of these two liners sho...
Expandable Liner Hanger Resolves Sealing Problems and Improves Integrity in Liner Completion Scenarios
Expandable Liner Hanger Resolves Sealing Problems and Improves Integrity in Liner Completion Scenarios
Abstract
Conventional liner-hanger systems typically rely upon the primary cement job as the main method of sealing the liner/casing overlap, and liner-top packers a...
Expandable Cased-hole Liner Remediates Prolific Gas Well and Minimizes Loss of Production
Expandable Cased-hole Liner Remediates Prolific Gas Well and Minimizes Loss of Production
Abstract
As the petroleum industry ages, remediation of mature wells using cost-effective solutions is critical. Restoration of a well's production or mechanical ...
Expandable Tubulars Enable Multi-Zone Frac-Packing in the Open Hole
Expandable Tubulars Enable Multi-Zone Frac-Packing in the Open Hole
Abstract
Investigation is underway to enhance potential production rates by actualizing a method of frac-packing multi-zone slim holes and sidetracks using solid and...
Deployment of Liner Systems in Extreme High Mud Weight Environments in Gas Wells
Deployment of Liner Systems in Extreme High Mud Weight Environments in Gas Wells
Abstract
During the development phase of a gas field, the abnormal pressure in a dolomitic limestone formation demanded an extremely high mud weight to control the w...
Dynamic model of closure the liner
Dynamic model of closure the liner
Annotation
Purpose. Develop analytical dependences for modeling the speed and dynamics of deformation of liner depending on its design parameters and physical and mechanical charac...