Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Analysis of construction delay for delivering quality project in Bangladesh

View through CrossRef
Purpose Construction delay is the most common issue and creates many adverse effects in any construction industry. This study has investigated the views of engineers, project managers and contractors on the causes of delay during a construction phase to identify potential delay factors, negative effects on project delivery and prioritize the delay factors. Design/methodology/approach An extensive literature review and interview with construction stakeholders have been conducted to identify potential causes of construction delays and design a questionnaire survey. The final questionnaire was designed with 40 potential delay factors, and a total of 102 valid Bangladeshi construction stakeholders responded to it. The result was analyzed by the relative importance index. Findings Among the 40 delay factors, the top five most influencing delay factors are “delay in progress payments,” “rework due to mistakes during construction,” “lack of skilled labor,” “poor monitoring and control of activities” and “delays in the making of a decision.” The top five most damaging effects of delay are “time overrun,” “cost overrun,” “disputes,” “arbitration” and “litigation,” among ten negative effects of construction delay. All construction stakeholders believe that the owner-related, consultant-related and contractor-related groups are the first, second and third most important groups of delay factors. Originality/value The outcome of this study would enable the Bangladeshi construction industry to develop strategies to overcome delay factors and their harmful effects. By focusing on the outcome of this research and prioritizing the critical factors, the construction industry of Bangladesh will be able to minimize construction delay significantly and propagate the progress of the construction industry by delivering quality projects timely.
Title: Analysis of construction delay for delivering quality project in Bangladesh
Description:
Purpose Construction delay is the most common issue and creates many adverse effects in any construction industry.
This study has investigated the views of engineers, project managers and contractors on the causes of delay during a construction phase to identify potential delay factors, negative effects on project delivery and prioritize the delay factors.
Design/methodology/approach An extensive literature review and interview with construction stakeholders have been conducted to identify potential causes of construction delays and design a questionnaire survey.
The final questionnaire was designed with 40 potential delay factors, and a total of 102 valid Bangladeshi construction stakeholders responded to it.
The result was analyzed by the relative importance index.
Findings Among the 40 delay factors, the top five most influencing delay factors are “delay in progress payments,” “rework due to mistakes during construction,” “lack of skilled labor,” “poor monitoring and control of activities” and “delays in the making of a decision.
” The top five most damaging effects of delay are “time overrun,” “cost overrun,” “disputes,” “arbitration” and “litigation,” among ten negative effects of construction delay.
All construction stakeholders believe that the owner-related, consultant-related and contractor-related groups are the first, second and third most important groups of delay factors.
Originality/value The outcome of this study would enable the Bangladeshi construction industry to develop strategies to overcome delay factors and their harmful effects.
By focusing on the outcome of this research and prioritizing the critical factors, the construction industry of Bangladesh will be able to minimize construction delay significantly and propagate the progress of the construction industry by delivering quality projects timely.

Related Results

Crowdfunding dilemmas: understanding the roadblocks in Bangladesh’s SME’s financial landscape
Crowdfunding dilemmas: understanding the roadblocks in Bangladesh’s SME’s financial landscape
Purpose The purpose of this paper is to examine the complexities of crowdfunding for small and medium-sized enterprises (SMEs) in Bangladesh, with a focus on its global significanc...
GAMBARAN DIAGNOSTIC DELAY DAN TREATMENT DELAY PASIEN KANKER PAYUDARA DI KOTA PADANG
GAMBARAN DIAGNOSTIC DELAY DAN TREATMENT DELAY PASIEN KANKER PAYUDARA DI KOTA PADANG
Pendahuluan: Tingginya angka mortalitas dan morbiditas kanker payudara disebabkan oleh diagnostic delay dan treatment delay. Diagnostic delay dan treatment delay dikaitkan dengan u...
Pola Komunikasi Interpersonal Terapis Wicara pada Anak Telambat Bicara (Speech Delay)
Pola Komunikasi Interpersonal Terapis Wicara pada Anak Telambat Bicara (Speech Delay)
Abstract. The tittle of this study is Interpersonal Communication Patterns of Speech Therapists in Children with Speech Delay. Children with speech delay disorders are also social ...
Time and Architecture
Time and Architecture
In the Italian language, the term “tempo” (literally time) is a word of daily use to which we attribute many meanings. It can signify a chronological dimension between past, prese...
EFFECTIVE CRITERIA FOR SELECTING DELAY ANALYSIS METHODOLOGIES FOR CONSTRUCTION PROJECT IN ABU DHABI
EFFECTIVE CRITERIA FOR SELECTING DELAY ANALYSIS METHODOLOGIES FOR CONSTRUCTION PROJECT IN ABU DHABI
This paper examines the effective criteria to determine the capable delay analysis methodologies by the contractors for the construction’s claim in Abu Dhabi. The previous research...
The Ontology of Lean Construction 4.0 in the Construction Industry
The Ontology of Lean Construction 4.0 in the Construction Industry
L'ontologie du Lean Construction 4.0 dans l'industrie de la construction Cette recherche se concentre sur l'amélioration de l'industrie de la construction; avec un ...
Mitigation Approach for Significant Causes of Contractor’s Delays in Construction Projects in Sri Lanka
Mitigation Approach for Significant Causes of Contractor’s Delays in Construction Projects in Sri Lanka
The construction industry has a dynamic and complex environment. The successful completion of a construction project depends on various factors. Accordingly, construction delay is ...
Promoting Sustainable Development through the One Health Approach: Insights from Bangladesh
Promoting Sustainable Development through the One Health Approach: Insights from Bangladesh
Introduction: The One Health approach offers a promising framework for addressing the intertwined challenges of human health, animal health, and the environment, essential for achi...

Back to Top