EFFECTIVE CRITERIA FOR SELECTING DELAY ANALYSIS METHODOLOGIES FOR CONSTRUCTION PROJECT IN ABU DHABI
View through CrossRef
This paper examines the effective criteria to determine the capable delay analysis methodologies by the contractors for the construction’s claim in Abu Dhabi. The previous research was argued that 50% of the construction projects in UAE encounter delays and are not completed on time. Selecting the delay analysis methodology is a significant part of the claim process. Numerous delay analysis techniques used in the UAE, and constitute several factors. Thus, the selection practice is more significant to identify the delays. Contractor’s analyst consumed exaggerated time and effort to show their right using delay analysis methodologies (DAMs) and submit this as an extension of time claim, demanding to make the most of their benefits. The aim of this study contains exploring the selection of the delay analysis methodologies by the contractors for the construction’s claim in Abu Dhabi. In this regard, five case studies were selected on the basis that they represent examples for application of the delay analysis methods and techniques for the residential building. The respondents were selected from five projects and the interviews were held with the Contractor of each project. The collected Qualitative Data was analysed manually by using Thematic Analysis. The study found that the effective criteria for determining the delay analysis methodologies lie in its acceptance in court and as per contractual requirements. Furthermore, the factors influence the selection of the effective criteria for determining the delay analysis methodologies are the acceptance of the selected delay analysis method /technique, realistic results and accuracy of the delay analysis method /technique. However, the findings from this study become more important, if more studies are conducted to extend the exploring of the different delay analysis methodologies used by the contractors for the construction’s claim for wide range of projects in Abu Dhabi.
Title: EFFECTIVE CRITERIA FOR SELECTING DELAY ANALYSIS METHODOLOGIES FOR CONSTRUCTION PROJECT IN ABU DHABI
Description:
This paper examines the effective criteria to determine the capable delay analysis methodologies by the contractors for the construction’s claim in Abu Dhabi.
The previous research was argued that 50% of the construction projects in UAE encounter delays and are not completed on time.
Selecting the delay analysis methodology is a significant part of the claim process.
Numerous delay analysis techniques used in the UAE, and constitute several factors.
Thus, the selection practice is more significant to identify the delays.
Contractor’s analyst consumed exaggerated time and effort to show their right using delay analysis methodologies (DAMs) and submit this as an extension of time claim, demanding to make the most of their benefits.
The aim of this study contains exploring the selection of the delay analysis methodologies by the contractors for the construction’s claim in Abu Dhabi.
In this regard, five case studies were selected on the basis that they represent examples for application of the delay analysis methods and techniques for the residential building.
The respondents were selected from five projects and the interviews were held with the Contractor of each project.
The collected Qualitative Data was analysed manually by using Thematic Analysis.
The study found that the effective criteria for determining the delay analysis methodologies lie in its acceptance in court and as per contractual requirements.
Furthermore, the factors influence the selection of the effective criteria for determining the delay analysis methodologies are the acceptance of the selected delay analysis method /technique, realistic results and accuracy of the delay analysis method /technique.
However, the findings from this study become more important, if more studies are conducted to extend the exploring of the different delay analysis methodologies used by the contractors for the construction’s claim for wide range of projects in Abu Dhabi.
Related Results
Prediction of High Pressure Formation Salt Water Flow in Deep Drilling in Abu Dhabi Area
Prediction of High Pressure Formation Salt Water Flow in Deep Drilling in Abu Dhabi Area
ABSTRACT
Deep drilling of Permo-Triassic / Palaeozoic section in Abu Dhabi area is, generally, costly and risky: Many unforeseen problems were encountered while d...
Source Rocks of the Thamama Hydrocarbon in Abu Dhabi
Source Rocks of the Thamama Hydrocarbon in Abu Dhabi
Abstract
More than 80% of Abu Dhabi oil reserves are accumulated in the Thamama reservoirs. However, its source rock locations, thickness and richness distributions ...
Transpressional and Transtensional Structural Patterns in Abu Dhabi Fields, UAE
Transpressional and Transtensional Structural Patterns in Abu Dhabi Fields, UAE
Abstract
Abu Dhabi fields profitable development starts with understanding structural framework and styles kinematically and dynamically in the context of regional a...
Tectonic Map of Abu Dhabi, UAE
Tectonic Map of Abu Dhabi, UAE
Abstract
The study of tectonics deals with the broad architecture of the outer part of the Earth, the age, relationship, evolution of regional structural, deformatio...
Bedding Corridors as Migration Pathways in Abu Dhabi Fields
Bedding Corridors as Migration Pathways in Abu Dhabi Fields
Abstract
Hydrocarbon migration pathways control the distribution of oil and gas in Abu Dhabi sedimentary basins and therefore it is one of the most important and con...
Assessing ecosystems collapse risks in hyper arid landscape of Abu Dhabi: Integrating Red list assessment outcomes in identifying conservation priorities
Assessing ecosystems collapse risks in hyper arid landscape of Abu Dhabi: Integrating Red list assessment outcomes in identifying conservation priorities
Understanding ecosystem condition and trends is fundamental to biodiversity conservation, particularly in regions where arid climates and rapid development intensify ecological pre...
Analysis of construction delay for delivering quality project in Bangladesh
Analysis of construction delay for delivering quality project in Bangladesh
Purpose
Construction delay is the most common issue and creates many adverse effects in any construction industry. This study has investigated the views of engi...
TECHNOLOGICAL FEATURES OF ABU DHABI
TECHNOLOGICAL FEATURES OF ABU DHABI
Information and communication technologies ICT is a key driver of globalization, facilitating flows of money, capital, and infomation. It has reshaped industries, including telecom...