Analisis Kinerja Waktu Dan Biaya Pada Proyek Peningkatan Jalan Muhammad Sujai Panglayungan Cipedes Kota Tasikmalaya
View through CrossRef
The problem with the Muhammad Sujani Panglayungan Cipedes Road Improvement Project, Tasikmalaya City, is the occurrence of a Contract Change Order (CCO) with an increase in the volume of work. This problem affects the time and cost performance of the project. Many methods are used to measure time and cost performance.. Based on the problems mentioned above, the research objectives to be achieved are: Knowing the time and cost performance of the Muhammad Sujai Panglayungan Cipedes Road Improvement Project, Tasikmalaya City.Know the estimated fastest time and lowest cost for the Muhammad Sujai Panglayungan Cipedes Tasikmalaya City.The method used in this research is descriptive quantitative, research that describes the condition of a particular project by analyzing existing data. Data analysis used analytical and descriptive methods. Analytical means that existing data is processed in such a way as to produce conclusive final results. While descriptive means to describe problems that already exist or appear. Earned Value Analysis examines the tendency of schedule variances and cost variances over a period of time during a project.The results showed that the time performance on the Muhammad Sujani Panglayungan Cipedes Road Improvement Project, Tasikmalaya City, was not good, the average time performance index was 0.551<1, so it was unable to achieve the planned work targets. The cost performance of the Muhammad Sujani Panglayungan Cipedes Road Improvement Project in Tasikmalaya City is very good, the average cost performance index is 1.002>1, so the costs incurred are smaller when compared to the value obtained or in other words there are cost savings. The time needed to complete the Muhammad Sujani Panglayungan Cipedes Road Improvement Project, Tasikmalaya City based on a performance index of 60 calendar days and the costs required based on a cost performance index of IDR 1,213,681,818.18.
Title: Analisis Kinerja Waktu Dan Biaya Pada Proyek Peningkatan Jalan Muhammad Sujai Panglayungan Cipedes Kota Tasikmalaya
Description:
The problem with the Muhammad Sujani Panglayungan Cipedes Road Improvement Project, Tasikmalaya City, is the occurrence of a Contract Change Order (CCO) with an increase in the volume of work.
This problem affects the time and cost performance of the project.
Many methods are used to measure time and cost performance.
Based on the problems mentioned above, the research objectives to be achieved are: Knowing the time and cost performance of the Muhammad Sujai Panglayungan Cipedes Road Improvement Project, Tasikmalaya City.
Know the estimated fastest time and lowest cost for the Muhammad Sujai Panglayungan Cipedes Tasikmalaya City.
The method used in this research is descriptive quantitative, research that describes the condition of a particular project by analyzing existing data.
Data analysis used analytical and descriptive methods.
Analytical means that existing data is processed in such a way as to produce conclusive final results.
While descriptive means to describe problems that already exist or appear.
Earned Value Analysis examines the tendency of schedule variances and cost variances over a period of time during a project.
The results showed that the time performance on the Muhammad Sujani Panglayungan Cipedes Road Improvement Project, Tasikmalaya City, was not good, the average time performance index was 0.
551<1, so it was unable to achieve the planned work targets.
The cost performance of the Muhammad Sujani Panglayungan Cipedes Road Improvement Project in Tasikmalaya City is very good, the average cost performance index is 1.
002>1, so the costs incurred are smaller when compared to the value obtained or in other words there are cost savings.
The time needed to complete the Muhammad Sujani Panglayungan Cipedes Road Improvement Project, Tasikmalaya City based on a performance index of 60 calendar days and the costs required based on a cost performance index of IDR 1,213,681,818.
18.
.
Related Results
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
Analisis waktu standar produksi merupakan salah satu analisis metoda kuantitatif yang dilakukan untuk mengukur waktu produksi dan bertujuan agar dapat memiliki waktu standar sebaga...
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Proyek konstruksi merupakan kegiatan yang memiliki tingkat kompleksitas tinggi, sehingga sering terjadi keterlambatan penyelesaian proyek maupun pembengkakan biaya akibat sistem ma...
EVALUASI KINERJA WAKTU DAN BIAYA PADA PROYEK GEDUNG X MENGGUNAKAN METODE EARNED VALUE ANALYSIS - MRK
EVALUASI KINERJA WAKTU DAN BIAYA PADA PROYEK GEDUNG X MENGGUNAKAN METODE EARNED VALUE ANALYSIS - MRK
Pembangunan Proyek Gedung X dijadwalkan selesai dalam waktu 16 bulan atau 70 minggu. Namun proyek ini mengalami penambahan waktu pelaksanaan menjadi 27 bulan atau 118 minggu dengan...
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review Anna Tri Wahyuni1), Masfuri2), Liya Arista3)1,2,3 Fakultas Ilmu Keperawatan Univers...
PERAN TATA KELOLA PERUSAHAAN DALAM MEMODERASI PENGARUH IMPLEMANTASI GREEN ACCOUNTING, CORPORATE SOCIAL RESPONSIBILITY DAN FIRM SIZE TERHADAP KINERJA KEUANGAN
PERAN TATA KELOLA PERUSAHAAN DALAM MEMODERASI PENGARUH IMPLEMANTASI GREEN ACCOUNTING, CORPORATE SOCIAL RESPONSIBILITY DAN FIRM SIZE TERHADAP KINERJA KEUANGAN
This study examines the role of corporate governance in moderating the influence of green accounting disclosure, corporate social responsibility (CSR), and firm size on the financi...
EVALUASI TATA HIJAU JALUR HIJAU JALAN KOTA PEKANBARU
EVALUASI TATA HIJAU JALUR HIJAU JALAN KOTA PEKANBARU
Jalur hijau kota Pekanbaru didominasi penanaman pohon dengan berbagai macam bentuk tajuk dan juga penanaman perdu dan penutup tanah dengan berbagai macam pola. Evaluasi terhadap ta...
PENGARUH TEKNIK RELAKSASI NAPAS DALAM TERHADAP PENURUNAN SAKIT HAID PADA REMAJA PUTRI DI WILAYAH KERJA UPTD PUSKESMAS PANGLAYUNGAN KOTA TASIKMALAYA
PENGARUH TEKNIK RELAKSASI NAPAS DALAM TERHADAP PENURUNAN SAKIT HAID PADA REMAJA PUTRI DI WILAYAH KERJA UPTD PUSKESMAS PANGLAYUNGAN KOTA TASIKMALAYA
Sakit haid (dismenorhea) atau Sakit menstruasi adalah karakteristik Sakit yang terjadi sebelum atau selama menstruasi. Hari pertama sampai beberapa hari kedepan selama menstruasi, ...
KEPUASAN PENGGUNA JALAN TERHADAP PELAYANAN JALAN PROVINSI DI KALIMANTAN BARAT
KEPUASAN PENGGUNA JALAN TERHADAP PELAYANAN JALAN PROVINSI DI KALIMANTAN BARAT
Abstract
The quality of road services includes the performance of road infrastructure components, which include road pavement structures, road geometry, road complementary buil...