Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Applying just‐in‐time principles in the delivery and management of airport terminal buildings

View through CrossRef
PurposeThis study aims to examine how the just‐in‐time (JIT) principles can be adopted for the air travel industry with specific emphasis on the management and operations of terminal buildings in airports.Design/methodology/approachThree methods were adopted for the empirical part of this study. These included the observational walk‐through, interviews and survey questionnaires conducted in the Changi International Airport in Singapore. The evaluation for JIT application, as part of a larger study, includes the points of arrival and departure, the check‐in hall, immigration area, transit mall, gate lounges, food and beverage outlets, retail shops as well as other management initiatives that strive for continuous improvement. This paper focuses only on the check‐in hall.FindingsJapanese businesses have been able to compete successfully in the world market in recent decades because of their total dedication to quality and productivity issues. This has been made possible in part by the guiding principles of the JIT concept which many Japanese businesses subscribed to. The JIT principles include waste elimination, pull production system, uninterrupted work flow, total quality control, top management commitment, employee involvement, long term working relationships with suppliers and continuous improvement. The JIT concept was specifically examined in this study in the context of the Changi International Airport through its planning processes and existing operations. The study was able to highlight the strengths as well as areas for potential improvements in the airport through the application of the seven JIT principles.Practical implicationsBeyond Japanese businesses, the JIT concept was also found to have benefited organizations in a wide range of industries including those relating to the built environment. The study covers major processes and procedures typical of the spatial management and operations of major airport terminal buildings which holds promising lessons for airport management worldwide.Originality/valueThe analysis shows significant potential in applying JIT principles for managing airport operations within the confines of the physical airport terminal buildings. It recommends that designers, project managers and asset managers should progress beyond the traditional “design follows functions” approach to adopt the more integrative “design follows JIT‐driven functions” approach.
Title: Applying just‐in‐time principles in the delivery and management of airport terminal buildings
Description:
PurposeThis study aims to examine how the just‐in‐time (JIT) principles can be adopted for the air travel industry with specific emphasis on the management and operations of terminal buildings in airports.
Design/methodology/approachThree methods were adopted for the empirical part of this study.
These included the observational walk‐through, interviews and survey questionnaires conducted in the Changi International Airport in Singapore.
The evaluation for JIT application, as part of a larger study, includes the points of arrival and departure, the check‐in hall, immigration area, transit mall, gate lounges, food and beverage outlets, retail shops as well as other management initiatives that strive for continuous improvement.
This paper focuses only on the check‐in hall.
FindingsJapanese businesses have been able to compete successfully in the world market in recent decades because of their total dedication to quality and productivity issues.
This has been made possible in part by the guiding principles of the JIT concept which many Japanese businesses subscribed to.
The JIT principles include waste elimination, pull production system, uninterrupted work flow, total quality control, top management commitment, employee involvement, long term working relationships with suppliers and continuous improvement.
The JIT concept was specifically examined in this study in the context of the Changi International Airport through its planning processes and existing operations.
The study was able to highlight the strengths as well as areas for potential improvements in the airport through the application of the seven JIT principles.
Practical implicationsBeyond Japanese businesses, the JIT concept was also found to have benefited organizations in a wide range of industries including those relating to the built environment.
The study covers major processes and procedures typical of the spatial management and operations of major airport terminal buildings which holds promising lessons for airport management worldwide.
Originality/valueThe analysis shows significant potential in applying JIT principles for managing airport operations within the confines of the physical airport terminal buildings.
It recommends that designers, project managers and asset managers should progress beyond the traditional “design follows functions” approach to adopt the more integrative “design follows JIT‐driven functions” approach.

Related Results

KARAKTER FASAD BANGUNAN TERMINAL PENUMPANG BANDAR UDARA INTERNASIONAL SOEKARNO HATTA
KARAKTER FASAD BANGUNAN TERMINAL PENUMPANG BANDAR UDARA INTERNASIONAL SOEKARNO HATTA
ABSTRAK.   Bandar Udara Internasional Soekarno-Hatta merupakan pintu gerbang ke berbagai negara/daerah maka bentuk bangunan terminal penumpang dapat  memberikan ciri khas atau iden...
Multi-Airport System Development Model: Case Study of Airports in Indonesia
Multi-Airport System Development Model: Case Study of Airports in Indonesia
Indonesia's air transportation business has grown substantially to suit the community's transportation needs. An increasing number of people travel by airline each year. By way of ...
SEJARAH BANDARA MATAHORA DI PULAU WANGI-WANGI KABUPATEN WAKATOBI (2007-2017)
SEJARAH BANDARA MATAHORA DI PULAU WANGI-WANGI KABUPATEN WAKATOBI (2007-2017)
ABSTRAK: Permasalahan pokok dalam penelitian ini adalah: (1) Apa latar belakang pembangunan Bandara Matahora di Pulau Wangi-Wangi Kabupaten Wakatobi, (2) Apa kendala yang dihadapi ...
Optimalisasi Pemanfaatan Dan Pengelolaan Terminal Angkutan Umum Sawerigading Kota Sengkang Kabupaten Wajo
Optimalisasi Pemanfaatan Dan Pengelolaan Terminal Angkutan Umum Sawerigading Kota Sengkang Kabupaten Wajo
Tujuan dari penelitian ini yaitu Menganalisis faktor-faktor teridentifikasi yang mempengaruhi ketidakoptimalan pemanfaatan dan pengelolaan terminal angkutan umum Sawerigading Kota ...
Kajian Kondisi Fisik Terminal Leuwipanjang Berdasarkan Persepsi Penumpang
Kajian Kondisi Fisik Terminal Leuwipanjang Berdasarkan Persepsi Penumpang
Leuwipanjang terminal is a passenger terminal serving AKDP and AKAP. UPTD Terminal is required to provide convenient facilities for passengers during activities within the Terminal...
EVALUATION OF AIRPORT RAIL SERVICES BASED ON MINIMUM SERVICE STANDARDS (SPM)
EVALUATION OF AIRPORT RAIL SERVICES BASED ON MINIMUM SERVICE STANDARDS (SPM)
One of the factors the Yogyakarta government built Yogyakarta International Airport was because the capacity of the Adisutjipto airport was only able to accommodate 1.2 million pas...

Back to Top