Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Decommissioning of Offshore Oil and Gas Facilities: A Comparative Study Between Malaysia Practices and International Standards

View through CrossRef
Abstract Regulations for decommissioning are bound by international and domestic regulations. There are numerous decommissioning concepts to choose from, such as complete or partial removal, structure severance options which leave behind shell mounds and drill cuttings. However, in several international regulations there appears to be little clarity and/or opposing ideologies. Malaysia and Thailand have accessible resources for decommissioning legislation or guidelines in South East Asia. Nevertheless, they are differences in the regulations of these countries regarding the legal framework, the technical, financial and environmental framework. In this study, the feasibility of existing framework in decommissioning process of offshore installations or structures in Malaysia was studied and compared with international practices. Decision matrix analysis was used to systematically identify, analyse, and rate the performance of relationships between sets of values and information. Moreover, the scale of decommissioning activities over the next years, the data and information obtained were analysed using descriptive statistics approach. The results indicated that Thailand had the best decommissioning regulations because they have strict regulation in decommissioning. Most of the regulations covering the technical section are similar within all countries studied. Finally, recommendations given are from the aspects of frameworks on in-situ full or partial decommissioning, clarity on liabilities and residual risk management, financial security, residual risk funds, workflow optimisation, information management system, and waste management.
Title: Decommissioning of Offshore Oil and Gas Facilities: A Comparative Study Between Malaysia Practices and International Standards
Description:
Abstract Regulations for decommissioning are bound by international and domestic regulations.
There are numerous decommissioning concepts to choose from, such as complete or partial removal, structure severance options which leave behind shell mounds and drill cuttings.
However, in several international regulations there appears to be little clarity and/or opposing ideologies.
Malaysia and Thailand have accessible resources for decommissioning legislation or guidelines in South East Asia.
Nevertheless, they are differences in the regulations of these countries regarding the legal framework, the technical, financial and environmental framework.
In this study, the feasibility of existing framework in decommissioning process of offshore installations or structures in Malaysia was studied and compared with international practices.
Decision matrix analysis was used to systematically identify, analyse, and rate the performance of relationships between sets of values and information.
Moreover, the scale of decommissioning activities over the next years, the data and information obtained were analysed using descriptive statistics approach.
The results indicated that Thailand had the best decommissioning regulations because they have strict regulation in decommissioning.
Most of the regulations covering the technical section are similar within all countries studied.
Finally, recommendations given are from the aspects of frameworks on in-situ full or partial decommissioning, clarity on liabilities and residual risk management, financial security, residual risk funds, workflow optimisation, information management system, and waste management.

Related Results

Converted Barge for Wellhead Platform Decommissioning
Converted Barge for Wellhead Platform Decommissioning
Abstract This paper presents an alternative method for decommissioning offshore wellhead platform using converted flat top barge as decommissioning barge. The barge ...
Lena Guyed Tower Decommissioning Engineering
Lena Guyed Tower Decommissioning Engineering
Abstract The Mississippi Canyon 280-A platform, also known as Lena Guyed Tower located in 1,000 ft water depth in the Gulf of Mexico (GoM), was successfully decommis...
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Abstract This paper aims to share the collaboration efforts of Malaysia's governing body for Upstream oil & gas industry with various stakeholders to enhance dec...
Subsea Pipelines and Flowlines Decommissioning: What We Should Know for a Rational Approach
Subsea Pipelines and Flowlines Decommissioning: What We Should Know for a Rational Approach
Offshore and subsea decommissioning will increase in the next five years or so as many producing fields are matured and cease production while the oil price continues to remain low...
Primerjalna književnost na prelomu tisočletja
Primerjalna književnost na prelomu tisočletja
In a comprehensive and at times critical manner, this volume seeks to shed light on the development of events in Western (i.e., European and North American) comparative literature ...
Design of an Integrated Sustainable Energy System
Design of an Integrated Sustainable Energy System
Abstract One of the greatest industrial challenges for the oil & gas sector to address is the decommissioning of offshore assets along mature basins. The O&G...
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
Abstract The decommissioning of offshore oil and gas (O&G) facilities poses significant challenges due to high costs, operational risks, social impacts, and envi...

Back to Top