Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

An Approach to Turn–Key Communications Suites for New Construction Ships

View through CrossRef
ABSTRACT“Turn‐Key” is an innovative approach for the design, acquisition, integration, and installation of Radio Communications Systems for new construction ships. It has been developed by the Space and Naval Warfare Systems Command (SpaWar) to cope with the growing problem of ships being delivered to the fleet with outdated or obsolete communications technology. The Turn‐Key approach provides both performance and affordability benefits.Under the traditional ship design process, the baseline configuration of the communications suite is effectively frozen 5–7 years before delivery of the ship. In the current fixed price shipbuilding environment, the costs of engineering change proposals (ECPs) to implement communications suite design changes have become prohibitive. The design inflexibility created by these schedule and cost constraints affects the Navy's ability to implement communications technology advancements in new construction ships. At the point of delivery, most new construction ships already have an inherent “bow‐wave” of required communications subsystem/equipment upgrades which must be accomplished under the Fleet Modernization Program.Under the turn‐key approach, the Navy assumes full responsibility for design, acquisition, land‐based system integration, and (in some cases) shipboard installation and test of the communications suite. The shipbuilder provides necessary electrical power, ventilation, and cooling services, based on established allocations. This approach greatly reduces the Navy's GFI requirements and ECP costs to the shipbuilder and thereby gains the design flexibility necessary for incorporation of up‐to‐date communications technology prior to ship delivery. Since the shipbuilding ECP cost penalties associated with implementing communications technology upgrades are reduced, the turn‐key approach enables performance improvements while providing affordability benefits.The turn‐key approach already has been used successfully for installation of the communications suites on a number of auxiliary and special mission ship classes, and the results have been praised by InSurv. Now proposed for application to surface combatants and amphibious ships, the turn‐key approach is also the subject of an ongoing NavSea Total Quality Leadership (TQL) Process Action Team addressing improvements to the ship design, acquisition, and construction process. By attaining design flexibility and affordable performance benefits, the turn‐key approach serves as a prototype process improvement for integration of the entire range of command, control, communications, computers, and intelligence (C4I) systems.
Title: An Approach to Turn–Key Communications Suites for New Construction Ships
Description:
ABSTRACT“Turn‐Key” is an innovative approach for the design, acquisition, integration, and installation of Radio Communications Systems for new construction ships.
It has been developed by the Space and Naval Warfare Systems Command (SpaWar) to cope with the growing problem of ships being delivered to the fleet with outdated or obsolete communications technology.
The Turn‐Key approach provides both performance and affordability benefits.
Under the traditional ship design process, the baseline configuration of the communications suite is effectively frozen 5–7 years before delivery of the ship.
In the current fixed price shipbuilding environment, the costs of engineering change proposals (ECPs) to implement communications suite design changes have become prohibitive.
The design inflexibility created by these schedule and cost constraints affects the Navy's ability to implement communications technology advancements in new construction ships.
At the point of delivery, most new construction ships already have an inherent “bow‐wave” of required communications subsystem/equipment upgrades which must be accomplished under the Fleet Modernization Program.
Under the turn‐key approach, the Navy assumes full responsibility for design, acquisition, land‐based system integration, and (in some cases) shipboard installation and test of the communications suite.
The shipbuilder provides necessary electrical power, ventilation, and cooling services, based on established allocations.
This approach greatly reduces the Navy's GFI requirements and ECP costs to the shipbuilder and thereby gains the design flexibility necessary for incorporation of up‐to‐date communications technology prior to ship delivery.
Since the shipbuilding ECP cost penalties associated with implementing communications technology upgrades are reduced, the turn‐key approach enables performance improvements while providing affordability benefits.
The turn‐key approach already has been used successfully for installation of the communications suites on a number of auxiliary and special mission ship classes, and the results have been praised by InSurv.
Now proposed for application to surface combatants and amphibious ships, the turn‐key approach is also the subject of an ongoing NavSea Total Quality Leadership (TQL) Process Action Team addressing improvements to the ship design, acquisition, and construction process.
By attaining design flexibility and affordable performance benefits, the turn‐key approach serves as a prototype process improvement for integration of the entire range of command, control, communications, computers, and intelligence (C4I) systems.

Related Results

Broadband
Broadband
Connecting I’ve moved house on the weekend, closer to the centre of an Australian capital city. I had recently signed up for broadband, with a major Australian Internet c...
Funkcije komunikacijski relevantne šutnje u njemačkome
Funkcije komunikacijski relevantne šutnje u njemačkome
Additionally, this chapter presents research of silence with review of main aspects of papers in the field of conversational analysis, ethnography of communication and metaphor of ...
Design of an integrated e-Telecom system for improving telecom systems on ships
Design of an integrated e-Telecom system for improving telecom systems on ships
Abstract The advancement of communication technologies including satellites has been conducive to the ever-evolving ship management. The increasing needs for the accident p...
Holocene sediment storage in the Humber Estuary
Holocene sediment storage in the Humber Estuary
Abstract In order to determine the processes that have governed the accumulation and erosion of sediments in the Humber Estuary (English North Sea coast) thr...
Random interpolation and related properties in spaces of holomorphic functions
Random interpolation and related properties in spaces of holomorphic functions
Interpolation aléatoire et propriétés associées dans les espaces de fonctions holomorphes Cette thèse explore l’interaction entre l’analyse complexe et la théorie d...
The Influence of Passing Ships on Ships moored in Restricted Waters
The Influence of Passing Ships on Ships moored in Restricted Waters
Abstract Ships moored in harbours are subjected to hydrodynamic forces due to other ships passing nearby. Such forces induce motions of the moored ship which may ...
The Ontology of Lean Construction 4.0 in the Construction Industry
The Ontology of Lean Construction 4.0 in the Construction Industry
L'ontologie du Lean Construction 4.0 dans l'industrie de la construction Cette recherche se concentre sur l'amélioration de l'industrie de la construction; avec un ...
EVALUASI PENERAPAN SISTEM INFORMASI AKUNTANSI TERHADAP SIKLUS PENJUALAN OLE SUITES HOTEL
EVALUASI PENERAPAN SISTEM INFORMASI AKUNTANSI TERHADAP SIKLUS PENJUALAN OLE SUITES HOTEL
This study plans to evaluate the application of accounting information systems to the sales cycle at the Ole Suites Hotel. This research is a type of descriptive research with a qu...

Back to Top