Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Pengukuran Kinerja Mesin Sewage Treatment Plant (STP) menggunakan Metode Overall Equipment Efeectiveness

View through CrossRef
One of the important things in supporting the operational management of the building which is part of the building's mechanical and electrical aspects is the building's domestic liquid waste management system. The availability of liquid waste production cannot be separated from the performance of the Sewage Treatment Plan (STP) machine as a work tool that produces domestic liquid waste production in HDI Hive Menteng Building. STP machine maintenance is one of the important factors in ensuring the quality of liquid waste production in accordance with the Environmental Service (DLH) quality standards. The machine maintenance system can be used as a benchmark for measuring the effectiveness of STP machines. Machine performance with a high rhythm without stopping 24 hours which continues to increase and is comparable to the tenant accoupancy level, of course requires anticipatory action for machine breakdown problems. Overall Equipment Effectiveness (OEE) is a method used to measure and maximize machine effectiveness based on three categories, namely Availability rate, Performance rate, Quality rate. From the results of calculating the OEE value for the STP machine at PT. Gaia Care International) of 82.96%, in general the OEE value is still below the JIPM standard value, namely greater than 85%. For this reason, in this research, an analysis was carried out using a fishbone diagram, which is used to determine the causes and effects of not achieving the effectiveness of the STP machine. Based on the results of the Fish Bone Diagram analysis with several factors including; Machines, methods, people and materials can be concluded as factors that cause a decrease in the OEE value of STP machines, namely rework losses which are quite high so that they affect the Quality OEE value in STP machine measurements. The proposal given to increase the effectiveness of the STP Machine for controlling Rework Losses is to improve the general cleaning routine and increase the Backwash Pump Capacity in the aeration tank and Inlet.
Title: Pengukuran Kinerja Mesin Sewage Treatment Plant (STP) menggunakan Metode Overall Equipment Efeectiveness
Description:
One of the important things in supporting the operational management of the building which is part of the building's mechanical and electrical aspects is the building's domestic liquid waste management system.
The availability of liquid waste production cannot be separated from the performance of the Sewage Treatment Plan (STP) machine as a work tool that produces domestic liquid waste production in HDI Hive Menteng Building.
STP machine maintenance is one of the important factors in ensuring the quality of liquid waste production in accordance with the Environmental Service (DLH) quality standards.
The machine maintenance system can be used as a benchmark for measuring the effectiveness of STP machines.
Machine performance with a high rhythm without stopping 24 hours which continues to increase and is comparable to the tenant accoupancy level, of course requires anticipatory action for machine breakdown problems.
Overall Equipment Effectiveness (OEE) is a method used to measure and maximize machine effectiveness based on three categories, namely Availability rate, Performance rate, Quality rate.
From the results of calculating the OEE value for the STP machine at PT.
Gaia Care International) of 82.
96%, in general the OEE value is still below the JIPM standard value, namely greater than 85%.
For this reason, in this research, an analysis was carried out using a fishbone diagram, which is used to determine the causes and effects of not achieving the effectiveness of the STP machine.
Based on the results of the Fish Bone Diagram analysis with several factors including; Machines, methods, people and materials can be concluded as factors that cause a decrease in the OEE value of STP machines, namely rework losses which are quite high so that they affect the Quality OEE value in STP machine measurements.
The proposal given to increase the effectiveness of the STP Machine for controlling Rework Losses is to improve the general cleaning routine and increase the Backwash Pump Capacity in the aeration tank and Inlet.

Related Results

THE EVOLVING TREND OF MOBILE INTEGRATED DOMESTIC SEWAGE TREATMENT EQUIPMENT
THE EVOLVING TREND OF MOBILE INTEGRATED DOMESTIC SEWAGE TREATMENT EQUIPMENT
With the rapid development of science and technology in our country, domestic sewage treatment equipment is also gradually upgraded, and underground or semi-underground integrated ...
mesin bubut
mesin bubut
Perkembangan teknologi komputer saat ini telah mengalami kemajuan yang amat pesat. Dalam hal ini komputer telah diaplikasikan ke dalam alat-alat mesin perkakas di antaranya mesin b...
RANCANG BANGUN MESIN STIRLING TIPE GAMA BERKAPASITAS 157 ML MENGGUNAKAN SISTEM PENDINGIN FLUIDA CAIR
RANCANG BANGUN MESIN STIRLING TIPE GAMA BERKAPASITAS 157 ML MENGGUNAKAN SISTEM PENDINGIN FLUIDA CAIR
Penelitian tentang pengembangan mesin stirling saat ini sedang berkembang terkusus diakibatkan oleh karakteristik mesin stirling yang dapat mengunakan banyak jenis bahan bakar. Per...
EFEKTIVITAS DAN EFISIENSI MESIN-MESIN DALAM SATU RANGKAIAN PADA PROSES PRODUKSI KAYU LAPIS (STUDI KASUS DI PT SURYA SATRYA TIMUR)
EFEKTIVITAS DAN EFISIENSI MESIN-MESIN DALAM SATU RANGKAIAN PADA PROSES PRODUKSI KAYU LAPIS (STUDI KASUS DI PT SURYA SATRYA TIMUR)
This research aims to analyze the effectiveness and efficiency value of plywood production machines. This research was conducted by observing and recording the production flow or w...
Pengukuran Kinerja SDM Layanan Publik
Pengukuran Kinerja SDM Layanan Publik
Pengukuran kinerja pelayanan publik sering dikaitkan dengan pengukuran kinerja pemerintah, karena pelayanan publik merupakan bagian dari tanggung jawab pemerintah, sehingga ukuran ...
PERANCANGAN MEDIA VIDEO ANIMASI PADA INSTALASI MESIN LISTRIK PADA SEKOLAH TINGGI TEKNOLOGI BONTANG
PERANCANGAN MEDIA VIDEO ANIMASI PADA INSTALASI MESIN LISTRIK PADA SEKOLAH TINGGI TEKNOLOGI BONTANG
Aktivitas pembelajaran dimasa pandemi covid-19 dilaksanakan secara daring/online.  Penggunaan media dua dimensi dinilai tidak cukup bersinergi dengan media realita khususnya mesin-...
ANALISA PERFORMANCE MESIN PENGUPAS KAYU (ROTARY) PT. HENRISON IRIANA SORONG MENGGUNAKAN METODE INDEKS KAPABILITAS
ANALISA PERFORMANCE MESIN PENGUPAS KAYU (ROTARY) PT. HENRISON IRIANA SORONG MENGGUNAKAN METODE INDEKS KAPABILITAS
Artikel ini telah diterbitkan pada Prosiding Ini telah diterbitkan pada kegiatan Simposium Nasional Teknologi Terapan (SNTT) 5 2017 dengan No. ISSN2339-028XABSTRAK Penggunaan mes...

Back to Top