Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

ETH-PiP 2.0 Experience from Fenja EPCI

View through CrossRef
Abstract This paper presents the foundations as well as the main outcomes of the development, industrialization, fabrication and installation of the TechnipFMC's Electrically Trace Heated Pipe-in-Pipe (ETH-PiP) 2.0 for application on the Fenja field development. The Fenja Field is located offshore mid-Norway at a water depth of approximately 324m, and consists of two separate hydrocarbon accumulations, the Pil and Bue reservoirs, with fluid properties leading to flow assurance challenges such as hydrates and wax formation. Following successful deployment of a first generation of Electrically Trace Heated Pipe-in-Pipe on the TotalEnergies (then Total) Islay Field in 2011, TechnipFMC have conducted the development and industrialization of a completely new generation of ETH-PiP 2.0. The new ETH-PiP 2.0 has higher electrical rating of 3.8/6.6kV to overcome the specificities of the Fenja field development including the long tie-back distance of 36.8km which makes Fenja the longest (and largest) ETH-PiP in the world. Subsequent to successful qualification of the ETH-PiP system, TechnipFMC has completed the manufacturing of 36.8km of ETH-PiP stalks at the Evanton spoolbase. These were then loaded out onto the Deep Energy pipelay vessel for subsea installation by reel lay. The installation was finalized in summer 2021 with the complete system being connected and tested from the Njord A platform after it returned from refurbishment in spring 2022. This paper presents the qualification, industrialization, assembly and installation of the new generation ETH-PiP 2.0 which forms part of the Fenja field development.
Title: ETH-PiP 2.0 Experience from Fenja EPCI
Description:
Abstract This paper presents the foundations as well as the main outcomes of the development, industrialization, fabrication and installation of the TechnipFMC's Electrically Trace Heated Pipe-in-Pipe (ETH-PiP) 2.
0 for application on the Fenja field development.
The Fenja Field is located offshore mid-Norway at a water depth of approximately 324m, and consists of two separate hydrocarbon accumulations, the Pil and Bue reservoirs, with fluid properties leading to flow assurance challenges such as hydrates and wax formation.
Following successful deployment of a first generation of Electrically Trace Heated Pipe-in-Pipe on the TotalEnergies (then Total) Islay Field in 2011, TechnipFMC have conducted the development and industrialization of a completely new generation of ETH-PiP 2.
The new ETH-PiP 2.
0 has higher electrical rating of 3.
8/6.
6kV to overcome the specificities of the Fenja field development including the long tie-back distance of 36.
8km which makes Fenja the longest (and largest) ETH-PiP in the world.
Subsequent to successful qualification of the ETH-PiP system, TechnipFMC has completed the manufacturing of 36.
8km of ETH-PiP stalks at the Evanton spoolbase.
These were then loaded out onto the Deep Energy pipelay vessel for subsea installation by reel lay.
The installation was finalized in summer 2021 with the complete system being connected and tested from the Njord A platform after it returned from refurbishment in spring 2022.
This paper presents the qualification, industrialization, assembly and installation of the new generation ETH-PiP 2.
0 which forms part of the Fenja field development.

Related Results

Fenja Digital Twin with Automated Advisory: A Solution for Operational Excellence
Fenja Digital Twin with Automated Advisory: A Solution for Operational Excellence
Abstract In this paper we describe the Fenja Digital-Twin solution, its automated advisory workflow, and how it enhances operational excellence and further strengthe...
PERFORMANCE ANALYSIS OF AN EFFICIENT NEW-DESIGN SOLAR AIR HEATER BY CFD METHOD
PERFORMANCE ANALYSIS OF AN EFFICIENT NEW-DESIGN SOLAR AIR HEATER BY CFD METHOD
<p>The main contribution of this study is to present a modified V-corrugated grooved absorber plate in the construction of plane solar air heaters for higher performa...
Program Indonesia Pintar: Implementasi Kebijakan Jaminan Sosial Bidang Pendidikan
Program Indonesia Pintar: Implementasi Kebijakan Jaminan Sosial Bidang Pendidikan
Smart Indonesia Program (PIP) is one of social security policies in education with a purpose to provide assistance for students from underprivileged families. What raise as a probl...
Electrical & Optical Double Barrier Qualification and Implementation on FENJA Electrically Trace Heated Pipe-in-Pipe Project
Electrical & Optical Double Barrier Qualification and Implementation on FENJA Electrically Trace Heated Pipe-in-Pipe Project
Abstract This paper provides an overview of the work completed to design, qualify, manufacture and integrate electrical and optical double barrier penetrators with t...
General Practitioners’ Perspectives and Barriers to Deprescribing Inappropriate Medications in Primary Care
General Practitioners’ Perspectives and Barriers to Deprescribing Inappropriate Medications in Primary Care
Introduction and objective: Potentially inappropriate prescribing (PIP) is associated with adverse drug reactions and negative outcomes in older adults. The objective of the study ...

Back to Top