Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

The Effect of Adding Generation Bus to the Short Circuit Current Level in Electrical Power System

View through CrossRef
The need for electrical energy is changing and increasing, requiring system flexibility always to be changed and developed. On the other hand, changes in the configuration of the electric power system due to the addition of components or sub-systems also change system parameters such as impedance or level of fault current (short circuit current). This paper presents a study of changes in the fault current caused by adding a new generating bus to an electric power system. This paper aims to determine the change in short-circuit current due to the addition of generators on new buses connected to existing buses to identify the most suitable location for adding these generators based on short-circuit current levels. Three-phase short circuit faults are simulated and analyzed on the IEEE 14 bus standard system using ETAP software with a base MVA 615 MVA. The addition of generators was carried out at five locations with varying generating capacities. The research results show that the short circuit current will change significantly when adding a generator bus to bus 13, with an average percentage change of 5,656%. The smallest change occurs when adding a generator to bus 2, with an average percentage change of 2,417%. The research results conclude that connecting a generator to a new bus linked to an existing generator bus (PV bus) is more effective than connecting it to a new bus associated with a load bus (PQ bus).
Title: The Effect of Adding Generation Bus to the Short Circuit Current Level in Electrical Power System
Description:
The need for electrical energy is changing and increasing, requiring system flexibility always to be changed and developed.
On the other hand, changes in the configuration of the electric power system due to the addition of components or sub-systems also change system parameters such as impedance or level of fault current (short circuit current).
This paper presents a study of changes in the fault current caused by adding a new generating bus to an electric power system.
This paper aims to determine the change in short-circuit current due to the addition of generators on new buses connected to existing buses to identify the most suitable location for adding these generators based on short-circuit current levels.
Three-phase short circuit faults are simulated and analyzed on the IEEE 14 bus standard system using ETAP software with a base MVA 615 MVA.
The addition of generators was carried out at five locations with varying generating capacities.
The research results show that the short circuit current will change significantly when adding a generator bus to bus 13, with an average percentage change of 5,656%.
The smallest change occurs when adding a generator to bus 2, with an average percentage change of 2,417%.
The research results conclude that connecting a generator to a new bus linked to an existing generator bus (PV bus) is more effective than connecting it to a new bus associated with a load bus (PQ bus).

Related Results

EPD Electronic Pathogen Detection v1
EPD Electronic Pathogen Detection v1
Electronic pathogen detection (EPD) is a non - invasive, rapid, affordable, point- of- care test, for Covid 19 resulting from infection with SARS-CoV-2 virus. EPD scanning techno...
Approaching the Processes in the Generator Circuit Breaker at Disconnection through Sustainability Concepts
Approaching the Processes in the Generator Circuit Breaker at Disconnection through Sustainability Concepts
Nowadays, the electric connection circuits of power plants (based on fossil fuels as well as renewable sources) entail generator circuit-breakers (GCBs) at the generator terminals,...
Analisis Kapasitor Bank Untuk Memperbaiki Tegangan
Analisis Kapasitor Bank Untuk Memperbaiki Tegangan
Tenaga Listrik disalurkan kekonsumen melalui sistem tenaga listrik yang terdiri dari beberapa sub sistem yaitu  pembangkit, transmisi, dan distribusi. Penyulang Gurami Gardu Induk ...
Simulation modeling study on short circuit ability of distribution transformer
Simulation modeling study on short circuit ability of distribution transformer
Abstract Under short circuit condition, the oil immersed distribution transformer will endure combined electro-thermal stress, eventually lead to the mechanical dama...
Pelayanan Bus Patas dan Ekonomi Pada Trayek Antar Kota
Pelayanan Bus Patas dan Ekonomi Pada Trayek Antar Kota
Penelitian ini bertujuan untuk melakukan kajian kinerja pelayanan bus antar kota cepat terbatas (patas) dan ekonomi. Dalam pengambilan data, digunakan skala likert (numerik) untuk ...
Optimizing Dallas-Fort Worth Bus Transportation System Using Any Logic
Optimizing Dallas-Fort Worth Bus Transportation System Using Any Logic
The bus transportation system, modeled using the AnyLogic simulation software, aims to optimize the flow of buses and manage key operational challenges such as bus bunching and del...
Komparasi Biaya Operasional Kendaraan (BOK) Bus Diesel dengan Bus Listrik (Studi Kasus : Koridor Lapangan Merdeka-Tembung)
Komparasi Biaya Operasional Kendaraan (BOK) Bus Diesel dengan Bus Listrik (Studi Kasus : Koridor Lapangan Merdeka-Tembung)
Perbandingan biaya operasional antara bus diesel dan bus listrik dalam sistem transportasi umum perkotaan menjadi penting untuk evaluasi keberlanjutan ekonomi dan lingkungan. Korid...
A Real-Time Control Strategy for Bus Operation to Alleviate Bus Bunching
A Real-Time Control Strategy for Bus Operation to Alleviate Bus Bunching
In order to alleviate bus bunching and improve the balance and punctuality rate of bus operation, a single-line real-time control strategy based on Intelligent Transportation Syste...

Back to Top