RESEARCH TRENDS IN EVM LIMITATIONS AND PROPOSED IMPROVEMENTS
View through CrossRef
The earned value method (EVM) is a recognized management technique that is used for monitoring, evaluating, and controlling the progress of projects. The method’s employability challenges have consistently been addressed in the literature along with proposed enhancements that aim at improving its application. The overall objective of this paper is to synthesize those limitations reported to be encumbering EVM employability and to examine the main enhancements proposed for the EVM traditional set of metrics. To this effect, this paper initially validates the importance of project controls, as the top factor cited as being critical to the success of projects. Secondly, it presents a classification of the shortcomings reported to be impeding EVM employability, along with their corresponding improvement studies. As such, the paper looks at the temporal distribution of these limitation and improvement research studies, while shedding light on the trend of such interconnected research efforts over the last three decades. As such, the paper presents a synthesis of the improvements found to be affecting the representation, usage and measurements of the EVM set of metrics, with the aim of gaining perceptiveness on how the reported EVM shortcomings may probably be overcome. The findings revealed that the highest frequency of reported improvements (138 in total) was found to be pertaining to the method’s set of key parameters.
Title: RESEARCH TRENDS IN EVM LIMITATIONS AND PROPOSED IMPROVEMENTS
Description:
The earned value method (EVM) is a recognized management technique that is used for monitoring, evaluating, and controlling the progress of projects.
The method’s employability challenges have consistently been addressed in the literature along with proposed enhancements that aim at improving its application.
The overall objective of this paper is to synthesize those limitations reported to be encumbering EVM employability and to examine the main enhancements proposed for the EVM traditional set of metrics.
To this effect, this paper initially validates the importance of project controls, as the top factor cited as being critical to the success of projects.
Secondly, it presents a classification of the shortcomings reported to be impeding EVM employability, along with their corresponding improvement studies.
As such, the paper looks at the temporal distribution of these limitation and improvement research studies, while shedding light on the trend of such interconnected research efforts over the last three decades.
As such, the paper presents a synthesis of the improvements found to be affecting the representation, usage and measurements of the EVM set of metrics, with the aim of gaining perceptiveness on how the reported EVM shortcomings may probably be overcome.
The findings revealed that the highest frequency of reported improvements (138 in total) was found to be pertaining to the method’s set of key parameters.
Related Results
Study on the damping of EVM based blends
Study on the damping of EVM based blends
AbstractThe mechanical and damping properties of blends of ethylene‐vinyl acetate rubber(VA content >40 wt %) (EVM)/nitrile butadiene rubber (NBR) and EVM/ethylene‐propylene‐die...
Earned value‐based performance monitoring of facility construction projects
Earned value‐based performance monitoring of facility construction projects
Purpose
The purpose of this paper is to contribute to the diffusion of earned value management (EVM) as a practicable methodology to monitor facility constructi...
619. Pharmacokinetic-Pharmacodynamic (PK-PD) Target Attainment Analyses to Support Epetraborole Dose Selection for the Treatment of Patients with Mycobacterium avium Complex (MAC) Lung Disease
619. Pharmacokinetic-Pharmacodynamic (PK-PD) Target Attainment Analyses to Support Epetraborole Dose Selection for the Treatment of Patients with Mycobacterium avium Complex (MAC) Lung Disease
Abstract
Background
Epetraborole (EBO) is an orally available, bacterial leucyl transfer RNA synthetase inhibitor that concentra...
LB2306. Population Pharmacokinetic (PPK), Pharmacokinetic/Pharmacodynamic attainment (PTA), and Clinical Pharmacokinetic/Pharmacodynamic (PK/PD) Analyses for Sulbactam-Durlobactam (SUL-DUR) to Support Dose Selection for the Treatment of Acinetobacter baum
LB2306. Population Pharmacokinetic (PPK), Pharmacokinetic/Pharmacodynamic attainment (PTA), and Clinical Pharmacokinetic/Pharmacodynamic (PK/PD) Analyses for Sulbactam-Durlobactam (SUL-DUR) to Support Dose Selection for the Treatment of Acinetobacter baum
Abstract
Background
SUL-DUR is a β-lactam/β-lactamase inhibitor combination in development for the treatment of ABC infections, ...
Improving the effectiveness of project scheduling by using Earned Value Management and Artificial Neural Network
Improving the effectiveness of project scheduling by using Earned Value Management and Artificial Neural Network
During construction, uncontrolled resources impact project performance. Earned Value Management (EVM) is a widespread method used for project management based on time and cost cont...
Housing Improvements for Health and Associated Socio‐Economic Outcomes: A Systematic Review
Housing Improvements for Health and Associated Socio‐Economic Outcomes: A Systematic Review
Poor housing is associated with poor health. This suggests that improving housing conditions might lead to improved health for residents. This review searched widely for studies fr...
593. Population Pharmacokinetic Model Development for Epetraborole and Mycobacterium avium Complex (MAC) Lung Disease Patients Using Data from Phase 1 and 2 Studies
593. Population Pharmacokinetic Model Development for Epetraborole and Mycobacterium avium Complex (MAC) Lung Disease Patients Using Data from Phase 1 and 2 Studies
Abstract
Background
Epetraborole (EBO), an orally available bacterial leucyl transfer RNA synthetase inhibitor with potent activ...
KONTROL KINERJA PEKERJAAN PEMASANGAN TANGGA BAJA DENGAN METODE EVM
KONTROL KINERJA PEKERJAAN PEMASANGAN TANGGA BAJA DENGAN METODE EVM
Abstract. Construction project control is essential to achieve efficient results and meet established targets. One of the methods used in project control is Earned Value Management...