Improving the effectiveness of project scheduling by using Earned Value Management and Artificial Neural Network
View through CrossRef
During construction, uncontrolled resources impact project performance. Earned Value Management (EVM) is a widespread method used for project management based on time and cost control. Advances in Information Technology (IT) provide options to improve the EVM method. The EVM is a project-level method that excludes detailing the behavior of project parameters at the level of construction operations, they are handled in aggregated economic terms over time. Thus, this work studies the improvement of EVM using IT to express the handling of operational variables. This article uses a road construction project as a case study, to evaluate three approaches (i.e., Bayesian Network (BN), Artificial Neural Network (ANN), and Hybrid EVM-ANN) as improvement options for the EVM method. It was found that the ANN provides the best improvement of EVM results. The use of ANN and project parameters improves the handling of EVM. By mayor forecast effectiveness, is expected to improve the quality and availability of data for decision making, a condition which in turn may improve agility and adaptability of the project as-built outcomes. The model EVM-ANN uses parameters that influence project implementation completion, making it easier to assess project time performance based on various conditions in the field so that the project can obtain the best strategy to ensure project completion on time.
Title: Improving the effectiveness of project scheduling by using Earned Value Management and Artificial Neural Network
Description:
During construction, uncontrolled resources impact project performance.
Earned Value Management (EVM) is a widespread method used for project management based on time and cost control.
Advances in Information Technology (IT) provide options to improve the EVM method.
The EVM is a project-level method that excludes detailing the behavior of project parameters at the level of construction operations, they are handled in aggregated economic terms over time.
Thus, this work studies the improvement of EVM using IT to express the handling of operational variables.
This article uses a road construction project as a case study, to evaluate three approaches (i.
e.
, Bayesian Network (BN), Artificial Neural Network (ANN), and Hybrid EVM-ANN) as improvement options for the EVM method.
It was found that the ANN provides the best improvement of EVM results.
The use of ANN and project parameters improves the handling of EVM.
By mayor forecast effectiveness, is expected to improve the quality and availability of data for decision making, a condition which in turn may improve agility and adaptability of the project as-built outcomes.
The model EVM-ANN uses parameters that influence project implementation completion, making it easier to assess project time performance based on various conditions in the field so that the project can obtain the best strategy to ensure project completion on time.
Related Results
PERHITUNGAN DURASI PROYEK JALAN TOL DENGAN METODE EARNED SCHEDULE
PERHITUNGAN DURASI PROYEK JALAN TOL DENGAN METODE EARNED SCHEDULE
The slower-than-anticipated progress of construction projects is a common complaint in Indonesia. Several methods have been developed to address this issue, and the Earned Schedule...
La luz: de herramienta a lenguaje. Una nueva metodología de iluminación artificial en el proyecto arquitectónico.
La luz: de herramienta a lenguaje. Una nueva metodología de iluminación artificial en el proyecto arquitectónico.
The constant development of artificial lighting throughout the twentieth century helped to
develop architecture to the current situation in which a new methodology is needed for
...
Visual versus Tabular Scheduling Programs
Visual versus Tabular Scheduling Programs
Effective scheduling in construction is crucial for ensuring timely project completion and maintaining budget control. Scheduling programs play an important role in this process by...
DPTM: An Adaptive Scheduler Design Utilizing Timeslot Matching and Release Methods for Concurrent and Multi-task Interleaved Pipelining-oriented CGRA
DPTM: An Adaptive Scheduler Design Utilizing Timeslot Matching and Release Methods for Concurrent and Multi-task Interleaved Pipelining-oriented CGRA
Coarse-grained reconfigurable architectures (CGRAs) are increasingly employed as domain-specific accelerators due to their efficiency and flexibility. However, the existing CGRA ar...
Learning Approaches to Dynamic Workflow Scheduling based on Genetic Programming and Deep Reinforcement Learning
Learning Approaches to Dynamic Workflow Scheduling based on Genetic Programming and Deep Reinforcement Learning
<p><strong>Dynamic workflow scheduling (DWS) in cloud computing is a critical yet challenging problem, involving assigning numerous workflow tasks to heterogeneous virt...
PARAMETRIC STUDY OF WARREN STEEL TRUSS BRIDGE USING ARTIFICIAL NEURAL NETWORKS
PARAMETRIC STUDY OF WARREN STEEL TRUSS BRIDGE USING ARTIFICIAL NEURAL NETWORKS
Abstract
Steel truss bridges are a popular type of amongst several other standard bridges in Indonesia due to their lightweight yet robust and strong structure. In this study A...
Dynamic Scheduling of Multi-Agent in Agent-Based Distributed Network Management
Dynamic Scheduling of Multi-Agent in Agent-Based Distributed Network Management
Agent technology has played an important role in distributed network management, and agent scheduling is an inevitable problem in a multi-agent system. This chapter introduces a ne...
Modified neural networks for rapid recovery of tokamak plasma parameters for real time control
Modified neural networks for rapid recovery of tokamak plasma parameters for real time control
Two modified neural network techniques are used for the identification of the equilibrium plasma parameters of the Superconducting Steady State Tokamak I from external magnetic mea...