Cost of Preliminaries of Construction Projects for Civil Infrastructure Works in Malaysia
View through CrossRef
The preliminaries bill for quantities of a construction project provides general information, mandatory instructions, and setup running costs for a construction contract period. The bill is crucial and arbitrary in nature. The aim of this study is to verify the percentage difference between preliminaries of building and civil infrastructure works. The objective is to assist players in the construction industry to differentiate the preliminaries percentage between both types of civil works. As such, the decision maker would be able to make a more reliable budget allocation, particularly for the civil infrastructure project. 25 tender evaluation documents from six civil infrastructure tender evaluation exercises were analysed. The average preliminaries were derived based on the qualitative method using content analysis. The preliminaries for building works established by previous researchers and civil infrastructure derived from this study were compared to verify any significant deviation. The statistical analyses using Boussabaine's and standard deviation were compared to establish the most reliable result. The study concludes that the preliminaries of civil infrastructure works are between 3.26% and 6.38% as compared to that of building works between 3.60% and 7.94%. Consequently, the preliminaries of civil infrastructure work are lower up to 16.5% as compared to the building work. Despite the differences, average preliminaries are higher than 3% but not exceeding 10% of the tender sum for both types of construction works. Thus, the findings provided significant updates for the Malaysian construction industry.
Penerbit UTM Press
Title: Cost of Preliminaries of Construction Projects for Civil Infrastructure Works in Malaysia
Description:
The preliminaries bill for quantities of a construction project provides general information, mandatory instructions, and setup running costs for a construction contract period.
The bill is crucial and arbitrary in nature.
The aim of this study is to verify the percentage difference between preliminaries of building and civil infrastructure works.
The objective is to assist players in the construction industry to differentiate the preliminaries percentage between both types of civil works.
As such, the decision maker would be able to make a more reliable budget allocation, particularly for the civil infrastructure project.
25 tender evaluation documents from six civil infrastructure tender evaluation exercises were analysed.
The average preliminaries were derived based on the qualitative method using content analysis.
The preliminaries for building works established by previous researchers and civil infrastructure derived from this study were compared to verify any significant deviation.
The statistical analyses using Boussabaine's and standard deviation were compared to establish the most reliable result.
The study concludes that the preliminaries of civil infrastructure works are between 3.
26% and 6.
38% as compared to that of building works between 3.
60% and 7.
94%.
Consequently, the preliminaries of civil infrastructure work are lower up to 16.
5% as compared to the building work.
Despite the differences, average preliminaries are higher than 3% but not exceeding 10% of the tender sum for both types of construction works.
Thus, the findings provided significant updates for the Malaysian construction industry.
.
Related Results
Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia
Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia
Today, several developing countries struggle to improve the cost and time performances of major infrastructure works due to various reasons. Cost overrun and delay are one of the m...
Decreasing Costs Over Time in Construction Projects: Effective Cost Management
Decreasing Costs Over Time in Construction Projects: Effective Cost Management
Cost management effectiveness is a critical aspect of construction project management, with cost overruns posing significant challenges to project success. This research article in...
Potable Water Sources, Household Hygiene, and Sanitation Practices in Ikpoba Okha LGA, Edo State: Implications for Public Health and Sustainable Water Management
Omoregie, Andrew Edosa.1 Omoregie Abieyuwa Peace2 Okoro, Enyinnaya Okoro.3
1 College of Medi
Potable Water Sources, Household Hygiene, and Sanitation Practices in Ikpoba Okha LGA, Edo State: Implications for Public Health and Sustainable Water Management
Omoregie, Andrew Edosa.1 Omoregie Abieyuwa Peace2 Okoro, Enyinnaya Okoro.3
1 College of Medi
BACKGROUND
Access to potable drinking water and sufficient sanitation continues to be an urgent global concern, particularly in developing regions where con...
SUMBER SEJARAH SEBAGAI “SUPPORTIVE EVIDENCE” DALAM PEMILIKAN MALAYSIA DI GUGUSAN SEMARANG PENINJAU (GSP), LAUT CHINA SELATAN (LCS)
SUMBER SEJARAH SEBAGAI “SUPPORTIVE EVIDENCE” DALAM PEMILIKAN MALAYSIA DI GUGUSAN SEMARANG PENINJAU (GSP), LAUT CHINA SELATAN (LCS)
Abstrak Malaysia secara rasminya telah menduduki beberapa fitur di Kepulauan Spratly selepas terbitnya Peta Baharu Malaysia 1979 berikutan daripada kedudukan Gugusan Semarang Penin...
The Ontology of Lean Construction 4.0 in the Construction Industry
The Ontology of Lean Construction 4.0 in the Construction Industry
L'ontologie du Lean Construction 4.0 dans l'industrie de la construction
Cette recherche se concentre sur l'amélioration de l'industrie de la construction; avec un ...