Evaluasi Optimalisasi Cash Flow Pada Proyek Multiyears Dengan Penyesuaian Perubahan Waktu Pelaksanaan (Studi Kasus Proyek Pembangunan Jalur Kereta Api Lintas Makassar-Pare pare)

View through CrossRef
The construction of the Trans-Sulawesi railway line is a railway network built to reach important areas on the island of Sulawesi. In general, the implementation of construction projects is limited by a certain time with limited resources to complete a given job, but due to the unavailability of land when the Work Start Order is issued, it causes a time addendum twice without any cost escalation. The purpose of this research is to get the optimal cash flow that can be obtained by contractors based on changes in implementation time and get the right strategy that can be applied in the future so that no more Addendum changes in implementation time can harm the implementing contractor. Data collection includes primary data by interviewing 25 respondents representing 155 populations consisting of 15 work units, 10 supervisory consultants, 25 implementing contractors and 105 land owners. Secondary data collection was carried out by requesting the necessary data from the implementing contractor. Cash Flow optimization evaluation is carried out by calculating 2 cash flow simulations, namely: Simulation 1 (823 days based on addendum 1), simulation 2 (1063 days / based on addendum 2). Determination of the right strategy to avoid addendum changes in implementation time is done using SWOT Analysis. Calculation of both simulations obtained results: In Simulation 1 (823 days) the acceleration of the implementer  
Title: Evaluasi Optimalisasi Cash Flow Pada Proyek Multiyears Dengan Penyesuaian Perubahan Waktu Pelaksanaan (Studi Kasus Proyek Pembangunan Jalur Kereta Api Lintas Makassar-Pare pare)
Description:
The construction of the Trans-Sulawesi railway line is a railway network built to reach important areas on the island of Sulawesi.
In general, the implementation of construction projects is limited by a certain time with limited resources to complete a given job, but due to the unavailability of land when the Work Start Order is issued, it causes a time addendum twice without any cost escalation.
The purpose of this research is to get the optimal cash flow that can be obtained by contractors based on changes in implementation time and get the right strategy that can be applied in the future so that no more Addendum changes in implementation time can harm the implementing contractor.
Data collection includes primary data by interviewing 25 respondents representing 155 populations consisting of 15 work units, 10 supervisory consultants, 25 implementing contractors and 105 land owners.
Secondary data collection was carried out by requesting the necessary data from the implementing contractor.
Cash Flow optimization evaluation is carried out by calculating 2 cash flow simulations, namely: Simulation 1 (823 days based on addendum 1), simulation 2 (1063 days / based on addendum 2).
Determination of the right strategy to avoid addendum changes in implementation time is done using SWOT Analysis.
Calculation of both simulations obtained results: In Simulation 1 (823 days) the acceleration of the implementer  .

Related Results

Cash‐based approaches in humanitarian emergencies: a systematic review
Cash‐based approaches in humanitarian emergencies: a systematic review
This Campbell systematic review examines the effectiveness, efficiency and implementation of cash transfers in humanitarian settings. The review summarises evidence from five studi...
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
Analisis waktu standar produksi merupakan salah satu analisis metoda kuantitatif yang dilakukan untuk mengukur waktu produksi dan bertujuan agar dapat memiliki waktu standar sebaga...
PERENCANAAN JALUR GANDA (DOUBLE TRACK) LINTASAN KERETA API PADA EMPLASEMEN STASIUN BOHARAN – STASIUN (KM 33+867 - KM 24+167)
PERENCANAAN JALUR GANDA (DOUBLE TRACK) LINTASAN KERETA API PADA EMPLASEMEN STASIUN BOHARAN – STASIUN (KM 33+867 - KM 24+167)
Kereta api merupakan moda transportasi rangkaian dengan tenaga gerak yang digunakan untuk mengangkut barang maupun orang. Peningkatan permintaan dalam penggunakan moda transportasi...
Analisis Tingkat Risiko Banjir dan Tanah Longsor di Jalur Kereta Api Makassar-Parepare
Analisis Tingkat Risiko Banjir dan Tanah Longsor di Jalur Kereta Api Makassar-Parepare
Transportasi umum merupakan kebutuhan utama bagi masyarakat di kota-kota dan kabupaten besar di Sulawesi Selatan, seperti Kota Makassar, Kabupaten Maros, Kabupaten Pangkajene dan K...
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature  Review Anna Tri Wahyuni1), Masfuri2),  Liya Arista3)1,2,3 Fakultas Ilmu Keperawatan Univers...
OPTIMALISASI WAKTU PERCEPATAN DAN BIAYA KEGIATAN DI DALAM METODE JALUR KRITIS DENGAN PEMROGRAMAN LINIER
OPTIMALISASI WAKTU PERCEPATAN DAN BIAYA KEGIATAN DI DALAM METODE JALUR KRITIS DENGAN PEMROGRAMAN LINIER
Waktu percepatan proyek di dalam metode jalur kritis memerlukan perhitungan yang teliti karena unsur waktu dan biaya yang berubah pada saat proyek dipercepat. Perhitungan perubahan...
Penelitian ini bertujuan: 1) menentukkan lokasi rawan kecelakaan (black site) dan angka kecelakaan kereta api di Kota Padang. 2) mengetahui karakteritik lokasi rawan kecelakaan (bl...
KECEMASAN SAAT PANDEMI COVID 19: LITERATUR REVIEW Hardiyati, Efri Widianti, Taty Hernawaty Departemen Keperawatan Jiwa Poltekkes Kemenkes Mamuju Sulbar, Universitas Pad...