Javascript must be enabled to continue!
THE NEGOTIATION OF KEY ACTORS TOWARDS PETE-PETE (MINIBUS PUBLIC TRANSPORT) INTEGRATION IN MAMMINASATA BRT
View through CrossRef
Trans Mamminasata BRT in South Sulawesi is one of the national priority transportation program to solve traffic congestion in the region. The BRT operation will have a challenge since it is impacted the existing minibus public transport (Pete-pete). Many drivers have done several demonstrations against the BRT operation. Therefore, the negotiation strategy is need to be designed and implemented to realize this BRT program as all stakeholder’s goals. The objective of this study that used literature review method is to find out the most appropriate scheme options for Pete-pete’s actors (drivers and owners) to be integrated with Trans Mamminasata BRT system based on lessons learned from previous cases that occurred in DKI Jakarta Province and Semarang City through a negotiation process between dispute parties. For further studies, we suggest doing research to gain an existing players perspective on the BRT transition and testing the transition package as part of the negotiation.
Key words: BRT, negotiation, transportation, bus reform, Mamminasata
Title: THE NEGOTIATION OF KEY ACTORS TOWARDS PETE-PETE (MINIBUS PUBLIC TRANSPORT) INTEGRATION IN MAMMINASATA BRT
Description:
Trans Mamminasata BRT in South Sulawesi is one of the national priority transportation program to solve traffic congestion in the region.
The BRT operation will have a challenge since it is impacted the existing minibus public transport (Pete-pete).
Many drivers have done several demonstrations against the BRT operation.
Therefore, the negotiation strategy is need to be designed and implemented to realize this BRT program as all stakeholder’s goals.
The objective of this study that used literature review method is to find out the most appropriate scheme options for Pete-pete’s actors (drivers and owners) to be integrated with Trans Mamminasata BRT system based on lessons learned from previous cases that occurred in DKI Jakarta Province and Semarang City through a negotiation process between dispute parties.
For further studies, we suggest doing research to gain an existing players perspective on the BRT transition and testing the transition package as part of the negotiation.
Key words: BRT, negotiation, transportation, bus reform, Mamminasata.
Related Results
EVALUASI PERSEBARAN LOKASI HALTE BRT KORIDOR MANGKANG-PENGGARON KOTA SEMARANG
EVALUASI PERSEBARAN LOKASI HALTE BRT KORIDOR MANGKANG-PENGGARON KOTA SEMARANG
Permasalahan kemacetan di Kota Semarang sebagian besar diakibatkan oleh banyaknya kendaraan pribadi yang turun ke jalan. Hal tersebut dikarenakan pertumbuhan jumlah kendaraan priba...
Manusia Pete-Pete dan Perayaan Makassarisme
Manusia Pete-Pete dan Perayaan Makassarisme
Panggung sosial yang pete`-pete` hadirkan bersifat stategis karena perjumpaan antar warga kota yang difasilitasinya, diarahkannya, didevaluasinya dan ditundanya berlangsung massif,...
Performance Evaluation of BRT Standard in Decision Support System for Integrated Transportation Policy
Performance Evaluation of BRT Standard in Decision Support System for Integrated Transportation Policy
Increased urbanization implicated in the form of increased vehicles on roads which burdened limited resources and caused environmental deterioration. To reduce these effects, a Bus...
Determination of the most appropriate bus rapid transit system for the eThekwini Municipal Area
Determination of the most appropriate bus rapid transit system for the eThekwini Municipal Area
Invariably, a high percentage of the population of South Africa depends on public transport. In order to continue to satisfy commuters in terms of comfort, travel time, reliability...
Experimental Evaluation of Brake Response Time on Motorcycle Brake Lamp
Experimental Evaluation of Brake Response Time on Motorcycle Brake Lamp
Rear-end collisions are one of the highest contributors to road accidents fatalities, especially motorcycles which made up to 60% of the total of accidents that occur. The reasons ...
Outcomes of transplant-eligible patients with myelodysplastic syndrome with excess blasts registered in a prospective observational study: The JALSG-CS11-MDS-SCT
Outcomes of transplant-eligible patients with myelodysplastic syndrome with excess blasts registered in a prospective observational study: The JALSG-CS11-MDS-SCT
Abstract
Allogeneic hematopoietic stem cell transplantation (allo-SCT) is the sole curative therapy for myelodysplastic syndromes (MDS). However, whether bridging therapy (...
Bus rapid transit projects involving the South African government and small operators (as SMMEs): is bus rapid transit a blue or red ocean strategy?
Bus rapid transit projects involving the South African government and small operators (as SMMEs): is bus rapid transit a blue or red ocean strategy?
Transport forms the heartbeat of the economy, not only in South Africa but also globally. Over time the South African government has invested a great deal of resources in transport...
PENGARUH EKSISTENSI TRANSPORTASI UMUM BUS RAPID TRANSIT MAMMINASATA TERHADAP DAYA TARIK ANGKOT DI KOTA MAKASSAR
PENGARUH EKSISTENSI TRANSPORTASI UMUM BUS RAPID TRANSIT MAMMINASATA TERHADAP DAYA TARIK ANGKOT DI KOTA MAKASSAR
This research was conducted to find out: 1) Description of the existence of the mamminasata bus rapid transit public transportation, 2) Description of the attractiveness of public ...

