Javascript must be enabled to continue!
Determination of the most appropriate bus rapid transit system for the eThekwini Municipal Area
View through CrossRef
Invariably, a high percentage of the population of South Africa depends on public transport. In order to continue to satisfy commuters in terms of comfort, travel time, reliability of service and traffic congestion, there is a need to improve the efficiency of moving passengers to reduce travel time, delay time and number of stops. In the quest for advancement and improvement in public transport, many countries now embark on Bus Rapid Transit (BRT) systems based on the successful implementation of the system by cities like Curitiba (Brazil) and Bogota (Columbia). Government departments/transport authorities are often faced with the challenge of selecting the most suitable BRT system relative to the unique features of its transport demands and urban layout. Hence, this study proposes the determination of the most appropriate BRT system for the eThekwini Municipal Area (EMA). An in-depth literature review was conducted in order to determine the most adoptable BRT system amongst median, kerb side and segregated BRT systems, taking into consideration cost implications, safety of the passengers, pedestrian crossing, physically challenged commuters, vehicle option and manoeuvres. Physical assessment and critical review of the current operating BRT systems in Johannesburg, Cape Town and Port Elizabeth in South Africa was employed in this study as well as a critical comparison among these systems. The pros and cons of the three functional BRT systems in South Africa were stated and a way forward for EMA was recommended. Lastly, an assessment of the proposed BRT system in EMA was conducted on the existing Phase 1 and the remaining three phases. The review conducted was based on route inspection, access to property, factors considered in the selection of a BRT system, demand analyses of the routes and the evaluation of Johannesburg, Cape Town and Port Elizabeth BRT systems. Guidelines were also provided for the remaining proposed BRT routes which could be adopted by the eThekwini Transport Authority (ETA) in order to enhance a better performance in EMA over the three functional BRT systems in South Africa using the aforementioned criteria.
Title: Determination of the most appropriate bus rapid transit system for the eThekwini Municipal Area
Description:
Invariably, a high percentage of the population of South Africa depends on public transport.
In order to continue to satisfy commuters in terms of comfort, travel time, reliability of service and traffic congestion, there is a need to improve the efficiency of moving passengers to reduce travel time, delay time and number of stops.
In the quest for advancement and improvement in public transport, many countries now embark on Bus Rapid Transit (BRT) systems based on the successful implementation of the system by cities like Curitiba (Brazil) and Bogota (Columbia).
Government departments/transport authorities are often faced with the challenge of selecting the most suitable BRT system relative to the unique features of its transport demands and urban layout.
Hence, this study proposes the determination of the most appropriate BRT system for the eThekwini Municipal Area (EMA).
An in-depth literature review was conducted in order to determine the most adoptable BRT system amongst median, kerb side and segregated BRT systems, taking into consideration cost implications, safety of the passengers, pedestrian crossing, physically challenged commuters, vehicle option and manoeuvres.
Physical assessment and critical review of the current operating BRT systems in Johannesburg, Cape Town and Port Elizabeth in South Africa was employed in this study as well as a critical comparison among these systems.
The pros and cons of the three functional BRT systems in South Africa were stated and a way forward for EMA was recommended.
Lastly, an assessment of the proposed BRT system in EMA was conducted on the existing Phase 1 and the remaining three phases.
The review conducted was based on route inspection, access to property, factors considered in the selection of a BRT system, demand analyses of the routes and the evaluation of Johannesburg, Cape Town and Port Elizabeth BRT systems.
Guidelines were also provided for the remaining proposed BRT routes which could be adopted by the eThekwini Transport Authority (ETA) in order to enhance a better performance in EMA over the three functional BRT systems in South Africa using the aforementioned criteria.
Related Results
The impact of the local government support on the sustainability of co-operatives and its role on poverty alleviation in the eThekwini Municipal region
The impact of the local government support on the sustainability of co-operatives and its role on poverty alleviation in the eThekwini Municipal region
It has been accepted that sustainable co-operatives create job opportunities and have become a source of income for many people worldwide. The concept and philosophy of co-operativ...
Toronto's Future Rapid Transit Network: Evaluating Existing and Proposed Rapid Transit Services to a 2041 Forecast of Transit Needs and Transit Demands
Toronto's Future Rapid Transit Network: Evaluating Existing and Proposed Rapid Transit Services to a 2041 Forecast of Transit Needs and Transit Demands
<p>The Toronto Transit Commission (TTC), Toronto’s transit service provider, currently has 3 lines of rapid transit service intended for continued operation, and 4 new rapid ...
Toronto's Future Rapid Transit Network: Evaluating Existing and Proposed Rapid Transit Services to a 2041 Forecast of Transit Needs and Transit Demands
Toronto's Future Rapid Transit Network: Evaluating Existing and Proposed Rapid Transit Services to a 2041 Forecast of Transit Needs and Transit Demands
<p>The Toronto Transit Commission (TTC), Toronto’s transit service provider, currently has 3 lines of rapid transit service intended for continued operation, and 4 new rapid ...
Effective monitoring of vehicle utilization : a case study of eThekwini Municipality FMSs
Effective monitoring of vehicle utilization : a case study of eThekwini Municipality FMSs
The effective monitoring of vehicle utilisation in real time in the eThekwini Municipality pose a challenge in service delivery. There is no linkage between the service that is bei...
Analisis Kapasitor Bank Untuk Memperbaiki Tegangan
Analisis Kapasitor Bank Untuk Memperbaiki Tegangan
Tenaga Listrik disalurkan kekonsumen melalui sistem tenaga listrik yang terdiri dari beberapa sub sistem yaitu pembangkit, transmisi, dan distribusi. Penyulang Gurami Gardu Induk ...
Kualitas Pelayanan Bus Rapid Transit Trans Semarang
Kualitas Pelayanan Bus Rapid Transit Trans Semarang
Writing articles in this journal aims to describe the service quality of the Trans Semarang Bus Rapid Transit and its sub parameters which include descriptions tangibles, reliabili...
The influence of emerging technologies on small and medium manufacturing enterprises in eThekwini District Municipality of KwaZulu-Natal
The influence of emerging technologies on small and medium manufacturing enterprises in eThekwini District Municipality of KwaZulu-Natal
Manufacturing Small and Medium Enterprises (SMEs) in South Africa (SA) contribute meaningfully to economic growth, poverty reduction, social stability and job creation. Research on...
OS SERVIDORES PÚBLICOS MUNICIPAIS
OS SERVIDORES PÚBLICOS MUNICIPAIS
I. Organização do funcionalismo municipal1. A Autonomia dos Municípios e a organização de seu funcionalismo — A Constituição Federal assegura, aos Municípios, a autonomia de autogo...

