Frigg Decommissioning Offshore Work
View through CrossRef
Abstract
The Frigg Field was a natural gas reservoir that extends across the border between the Norwegian and the British sectors of the North Sea Continental Shelf. The Frigg Field was developed in accordance with the provisions of one agreement, known as Frigg Treaty, signed by the governments of Norway. Development of the Frigg Field took place between 1973 and 1977 and consisted of five plarforms with export of the gas to the St Fergus gas terminal in Scotland through two 32?? pipelines and one intermediate riser/compression platform located midway of the export lines. Three of the platforms were located in the UK water, the two others in the Norwegian sector and the United Kingdom. Under the provisions of the Frigg Treaty, Elf Norge now Total E&P Norge was defined as the Operator of the Frigg Field while Total Oil Marine now Total E&P UK was defined as the Operator of the gas export system.
The Frigg cessation offshore operation lasted from 2004 to 2009 resulting in the removal of all the platform topsides, all the jackets, all the infield and interfield sealines within the 500 m zone around the Frigg complex, all the external steel from de concrete substructures that were allowed to be left in place.
In line with the Frigg treaty, TOTAL E&P Norge was in charge of removing of the platforms located on the Norwegian sector (DP2, TCP2) but as well as the platforms located on the UK sector (QP, TP1, CDP1) of the Frigg field. The intermediate riser/compression platform (MCP01) was added by Total E&P UK to the scope of the Frigg decommissioning to be performed by Total E&P Norge.
In total 87000 tons of steel were brought back onshore for disposal either at Stord (72000t) in Norway and at Lervick (15000t) in Shetland.
Title: Frigg Decommissioning Offshore Work
Description:
Abstract
The Frigg Field was a natural gas reservoir that extends across the border between the Norwegian and the British sectors of the North Sea Continental Shelf.
The Frigg Field was developed in accordance with the provisions of one agreement, known as Frigg Treaty, signed by the governments of Norway.
Development of the Frigg Field took place between 1973 and 1977 and consisted of five plarforms with export of the gas to the St Fergus gas terminal in Scotland through two 32?? pipelines and one intermediate riser/compression platform located midway of the export lines.
Three of the platforms were located in the UK water, the two others in the Norwegian sector and the United Kingdom.
Under the provisions of the Frigg Treaty, Elf Norge now Total E&P Norge was defined as the Operator of the Frigg Field while Total Oil Marine now Total E&P UK was defined as the Operator of the gas export system.
The Frigg cessation offshore operation lasted from 2004 to 2009 resulting in the removal of all the platform topsides, all the jackets, all the infield and interfield sealines within the 500 m zone around the Frigg complex, all the external steel from de concrete substructures that were allowed to be left in place.
In line with the Frigg treaty, TOTAL E&P Norge was in charge of removing of the platforms located on the Norwegian sector (DP2, TCP2) but as well as the platforms located on the UK sector (QP, TP1, CDP1) of the Frigg field.
The intermediate riser/compression platform (MCP01) was added by Total E&P UK to the scope of the Frigg decommissioning to be performed by Total E&P Norge.
In total 87000 tons of steel were brought back onshore for disposal either at Stord (72000t) in Norway and at Lervick (15000t) in Shetland.
Related Results
Design, Installation, And Connection Of Subsea Lines On East Frigg Field
Design, Installation, And Connection Of Subsea Lines On East Frigg Field
ABSTRACT
This paper describes the subsea network which interconnects the three subsea templates at EAST FRIGG field, and connects this field to the FRIGG field, 1...
Converted Barge for Wellhead Platform Decommissioning
Converted Barge for Wellhead Platform Decommissioning
Abstract
This paper presents an alternative method for decommissioning offshore wellhead platform using converted flat top barge as decommissioning barge. The barge ...
Lena Guyed Tower Decommissioning Engineering
Lena Guyed Tower Decommissioning Engineering
Abstract
The Mississippi Canyon 280-A platform, also known as Lena Guyed Tower located in 1,000 ft water depth in the Gulf of Mexico (GoM), was successfully decommis...
North East Frigg Development and Experience
North East Frigg Development and Experience
Summary
The North East Frigg (NEF) gas field is a small satellite of the Frigg field; in terms of recoverable reserves as estimated at the beginning of the projec...
Environmental Impact From Removal of Installations: The North East Frigg Field Installations
Environmental Impact From Removal of Installations: The North East Frigg Field Installations
1.0 Abstract
The removal of the Field Control Station (FCS) from the North East Frigg Field was successfully performed in 1996. The preparation started in 1990 an...
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Abstract
This paper aims to share the collaboration efforts of Malaysia's governing body for Upstream oil & gas industry with various stakeholders to enhance dec...
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Abstract
The complete life of a nuclear power plant consists of three stages: construction, operation and decommissioning. In the last stage of the operation life of...
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
A New Multi-Criteria Decision-Making Tool for Subsea Oil and Gas Asset Decommissioning
Abstract
The decommissioning of offshore oil and gas (O&G) facilities poses significant challenges due to high costs, operational risks, social impacts, and envi...