Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Assessing the feasibility of suspended BOP transportation and its impact on fatigue life

View through CrossRef
The sailing of the drilling rig along with its subsea equipment, such as, the drilling riser and the blowout preventer (BOP), from one well to another using traditional methods is a time-consuming operation. Typically, this process involves lowering and retrieving the BOP after drilling, followed by moving the rig to another well to be drilled, and again lowering the BOP and subsequently retrieving it. This method becomes even more time-consuming in ultra-deep waters, where recent oil field discoveries have taken place, as the deeper the water depths, the more time is required for such operations. Considering the high costs associated with renting and operating drilling rigs, operators are looking for ways to make these processes more efficient. One promising alternative is the method of navigation with the BOP suspended at a certain distance from the seabed, eliminating the need to retrieve the entire drilling riser and BOP, resulting in significant optimization of the process of transferring the drilling rig and its subsea equipment between wells.During the navigation of the BOP, hydrodynamic and inertial forces are exerted on the suspended riser column and the subsea BOP. In this present work, analyses of fatigue resulting from the effects of waves and vortex-induced vibration resulting from current speed and navigation, will be conducted for different lengths of the riser column. The results of these analyses will be presented, and the software used to obtain these results will be Orcaflex and Shear7.
Title: Assessing the feasibility of suspended BOP transportation and its impact on fatigue life
Description:
The sailing of the drilling rig along with its subsea equipment, such as, the drilling riser and the blowout preventer (BOP), from one well to another using traditional methods is a time-consuming operation.
Typically, this process involves lowering and retrieving the BOP after drilling, followed by moving the rig to another well to be drilled, and again lowering the BOP and subsequently retrieving it.
This method becomes even more time-consuming in ultra-deep waters, where recent oil field discoveries have taken place, as the deeper the water depths, the more time is required for such operations.
Considering the high costs associated with renting and operating drilling rigs, operators are looking for ways to make these processes more efficient.
One promising alternative is the method of navigation with the BOP suspended at a certain distance from the seabed, eliminating the need to retrieve the entire drilling riser and BOP, resulting in significant optimization of the process of transferring the drilling rig and its subsea equipment between wells.
During the navigation of the BOP, hydrodynamic and inertial forces are exerted on the suspended riser column and the subsea BOP.
In this present work, analyses of fatigue resulting from the effects of waves and vortex-induced vibration resulting from current speed and navigation, will be conducted for different lengths of the riser column.
The results of these analyses will be presented, and the software used to obtain these results will be Orcaflex and Shear7.

Related Results

EFEKTIVITAS YOGA UNTUK MENGURANGI FATIGUE PADA PASIEN KANKER YANG MENJALANI KEMOTERAPI
EFEKTIVITAS YOGA UNTUK MENGURANGI FATIGUE PADA PASIEN KANKER YANG MENJALANI KEMOTERAPI
ABSTRAKLatar Belakang : Cancer Related Fatigue (CRF) adalah manifestasi klinis yang serius dan gejala umum yang dialami oleh pasien kanker. Fatigue adalah salah satu yang paling se...
ROV: Improving Remotely Operated(ROV) Intervention Capabilities for Blowout Preventer Override Systems
ROV: Improving Remotely Operated(ROV) Intervention Capabilities for Blowout Preventer Override Systems
Abstract Events during 2010 have focused attention on increased ROV/BOP Intervention capabilities and standardization of BOP/ROV interfaces in the oil and gas off...
BOP Reliability monitored Real Time
BOP Reliability monitored Real Time
Abstract The BOP is a complex construction with multiple parts and systems integrated. Any single failure will affect the overall functionality of the BOP. A key que...
A Computational Study on Adaptive Multiobjective Optimization of Blowout Preventer Valve System
A Computational Study on Adaptive Multiobjective Optimization of Blowout Preventer Valve System
Abstract A blowout preventer (BOP) is a large valve that acts as a critical well control unit against oil, gas, and water overflow and well blowout. The BOP valve bo...
Assessment of Objective and Subjective Fatigubility in Obese
Assessment of Objective and Subjective Fatigubility in Obese
Aim: This study aimed to quantify objective fatigue using the Long Distance Corridor Walk (2-Minute Walk Test and 400-Meter Walk Test) and evaluate subjective fatigue using the Fat...
Mitigating Wellhead Fatigue While Reducing HSE Risk, Deck Spread, Deployment Time, and Crew Size
Mitigating Wellhead Fatigue While Reducing HSE Risk, Deck Spread, Deployment Time, and Crew Size
Abstract Subsea wellhead systems have a design fatigue life that is expected to withstand the damage incurred from stress caused by cyclic loading during its operati...
The Effect of Student Fatigue on Teaching Quality: A Prospective Cohort Study Based on One University
The Effect of Student Fatigue on Teaching Quality: A Prospective Cohort Study Based on One University
Abstract Students' fatigue is a serious problem which affects the quality of teaching and the physical and mental health of students and must be paid attention to by the wh...

Back to Top