Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Analisis Beban Kerja dengan Metode Workload Analysis (WLA) pada Stasiun Kerja Packing

View through CrossRef
Abstract. Workers are an important part of the production process. One of the things that company need to pay attention to is employee’s workload. PT Kraft Ultrajaya Indonesia is a manufacturing company that produces cheese. All of the process is using automated machine, except the packaging process. They has 6 unit lines (Line A, B, C, D, E, and F) in packaging process, and there are 2 workers in each unit lines. The packing process has not set a standard time. This couses the speed of workers in doing their work inconsistently because there is no standard time. Meanwhile the company implementing overtime hours in order to avoid reject product because they have zero tolerance policy for a reject product found in packaging process. This study aims to determine the level of work. The method used in in this study is a quantitative methode. While the measurement methode used is Stopwatch Time Study (STS) and Work Load Analysis (WLA). From the result showed that operators 1 in Line B have a high workload (101%), and the operators in Line C have a low level of workload (48%). Based on the data, proposed operator requirements number by moving 1 operator from Line C to Line B and redistributing work task to reduce the workload of overloaded Line B. After a simulation based on the proposed design, each line can meet the production targets set by the company. Abstrak. Pekerja membutuhkan perhatian dari perusahaan agar dapat bekerja secara optimal. Salah satu hal yang perlu diperhatikan oleh perusahaan yaitu beban kerja dari pekerja. PT. Kraft Ultrajaya Indonesia merupakan perusahaan yang memproduksi keju. Perusahaan sudah menggunakan mesin otomatis pada proses produksinya kecuali pada proses packing. Terdapat 6 line (A, B, C, D, E, F) pada proses packing dimana tiap line terdiri dari 2 operator. Proses packing saat ini belum dilakukan pengukuran waktu baku. Hal ini menyebabkan kecepatan operator dalam melakukan pekerjaannya tidak konsisten karena tidak adanya waktu standar yang ditetapkan. Perusahaan saat ini menerapkan jam kerja lembur agar tidak ada produk cacat yang terjadi pada proses packing karena perusahaan menerapkan zero tolerance terhadap cacat produk yang terjadi pada proses packing. Tujuan penelitian ini untuk mengetahui tingkat beban kerja operator pada proses packing. Metodologi penelitian yang digunakan pada penelitian adalah metode kuantitatif. Metode pengukuran yang digunakan yaitu metode Jam Henti dan Work Load Analysis (WLA). Hasil penelitian menunjukkan terdapat operator dengan nilai beban kerja diatas 100% (overload) yaitu operator 2 pada line B. Selain itu terdapat operator dengan nilai beban kerja dibawah 50% (underload) yaitu operator pada line C. Berdasarkan hasil perhitungan kebutuhan jumlah operator. Line B dilakukan penambahan 1 operator dan line C dilakukan pengurangan 1 operator. Usulan yang dilakukan yaitu memindahkan 1 operator line C ke line B serta dilakukan pembagian ulang aktivitas kerja. Setelah dilakukan simulasi berdasarkan usulan perancangan, setiap line dapat memenuhi target produksi yang telah ditetapkan perusahaan.
Title: Analisis Beban Kerja dengan Metode Workload Analysis (WLA) pada Stasiun Kerja Packing
Description:
Abstract.
Workers are an important part of the production process.
One of the things that company need to pay attention to is employee’s workload.
PT Kraft Ultrajaya Indonesia is a manufacturing company that produces cheese.
All of the process is using automated machine, except the packaging process.
They has 6 unit lines (Line A, B, C, D, E, and F) in packaging process, and there are 2 workers in each unit lines.
The packing process has not set a standard time.
This couses the speed of workers in doing their work inconsistently because there is no standard time.
Meanwhile the company implementing overtime hours in order to avoid reject product because they have zero tolerance policy for a reject product found in packaging process.
This study aims to determine the level of work.
The method used in in this study is a quantitative methode.
While the measurement methode used is Stopwatch Time Study (STS) and Work Load Analysis (WLA).
From the result showed that operators 1 in Line B have a high workload (101%), and the operators in Line C have a low level of workload (48%).
Based on the data, proposed operator requirements number by moving 1 operator from Line C to Line B and redistributing work task to reduce the workload of overloaded Line B.
After a simulation based on the proposed design, each line can meet the production targets set by the company.
Abstrak.
Pekerja membutuhkan perhatian dari perusahaan agar dapat bekerja secara optimal.
Salah satu hal yang perlu diperhatikan oleh perusahaan yaitu beban kerja dari pekerja.
PT.
Kraft Ultrajaya Indonesia merupakan perusahaan yang memproduksi keju.
Perusahaan sudah menggunakan mesin otomatis pada proses produksinya kecuali pada proses packing.
Terdapat 6 line (A, B, C, D, E, F) pada proses packing dimana tiap line terdiri dari 2 operator.
Proses packing saat ini belum dilakukan pengukuran waktu baku.
Hal ini menyebabkan kecepatan operator dalam melakukan pekerjaannya tidak konsisten karena tidak adanya waktu standar yang ditetapkan.
Perusahaan saat ini menerapkan jam kerja lembur agar tidak ada produk cacat yang terjadi pada proses packing karena perusahaan menerapkan zero tolerance terhadap cacat produk yang terjadi pada proses packing.
Tujuan penelitian ini untuk mengetahui tingkat beban kerja operator pada proses packing.
Metodologi penelitian yang digunakan pada penelitian adalah metode kuantitatif.
Metode pengukuran yang digunakan yaitu metode Jam Henti dan Work Load Analysis (WLA).
Hasil penelitian menunjukkan terdapat operator dengan nilai beban kerja diatas 100% (overload) yaitu operator 2 pada line B.
Selain itu terdapat operator dengan nilai beban kerja dibawah 50% (underload) yaitu operator pada line C.
Berdasarkan hasil perhitungan kebutuhan jumlah operator.
Line B dilakukan penambahan 1 operator dan line C dilakukan pengurangan 1 operator.
Usulan yang dilakukan yaitu memindahkan 1 operator line C ke line B serta dilakukan pembagian ulang aktivitas kerja.
Setelah dilakukan simulasi berdasarkan usulan perancangan, setiap line dapat memenuhi target produksi yang telah ditetapkan perusahaan.

Related Results

RASIONALISASI JARINGAN STASIUN CURAH HUJAN PADA DAERAH ALIRAN SUNGAI TUKAD MATI
RASIONALISASI JARINGAN STASIUN CURAH HUJAN PADA DAERAH ALIRAN SUNGAI TUKAD MATI
Komponen hidrologi merupakan komponen utama dalam perencanaan infrastruktur keairan. Kualitas maupun kuantitas pencatatan data hujan pada setiap pos hujan menjadi komponen terpenti...
Umjetničko djelo Brede Beban u kontekstu feminističke i postkolonijalne teorije
Umjetničko djelo Brede Beban u kontekstu feminističke i postkolonijalne teorije
I find the key reason in studying this artistic oeuvre in the fact that Breda Beban’s overall oeuvre is less known to the Croatian expert public, and that she has mostly been viewe...
Hubungan Beban Kerja Dan Lingkungan Kerja Dengan Stres Perawat Di Rsud Dr. Adnaan Wd Payakumbuh
Hubungan Beban Kerja Dan Lingkungan Kerja Dengan Stres Perawat Di Rsud Dr. Adnaan Wd Payakumbuh
Profesi sebagai perawat memberikan kontribusi sangat besar terhadap kejadian stres kerja. Hasil survey yang dilakukan oleh Persatuan Perawat Nasional Indonesia (2006) bahwa 50,9% p...
Optimisasi Penjadwalan Pembangkit pada Microgrid dengan Mempertimbangkan Respons Beban
Optimisasi Penjadwalan Pembangkit pada Microgrid dengan Mempertimbangkan Respons Beban
Abstract – In a smart grid, the adequacy of electricity supply is not only determined by generation, but the electrical demand can also be involved. Demand response is one way to m...
Pengaruh Komitmen, Disiplin Dan Beban Kerja Terhadap Kinerja Layanan Dimediasi Motivasi Berprestasi
Pengaruh Komitmen, Disiplin Dan Beban Kerja Terhadap Kinerja Layanan Dimediasi Motivasi Berprestasi
Abstract—This research aims to analysis and proven empirical according to direct influence at commitment, work discipline, andworkload to services performance and achievement motiv...
Hubungan Beban Kerja Dengan Stres Perawat Di Ruangan Baji Dakka Dan Baji Kamase
Hubungan Beban Kerja Dengan Stres Perawat Di Ruangan Baji Dakka Dan Baji Kamase
Beban kerja merupakan beban aktifitas fisik, mental, sosial yang diterima oleh individu yang harus diselesaikan dalam waktu tertentu, sesuai dengan kemampuan fisik maupun keterbata...
Perkembangan Kawasan Permukiman di Sekitar Titik Transit Kabupaten Bogor
Perkembangan Kawasan Permukiman di Sekitar Titik Transit Kabupaten Bogor
Kabupaten Bogor sebagai salah satu hinterland dalam KSN Jabodetabekpunjur, telah mengalami perkembangan wilayah yang pesat dan pertumbuhan penduduk yang tinggi. Wilayah ini memilik...

Back to Top