COMPARATIVE ANALYSIS OF COLUMN AND BEAMS VOLUMES OF CONVENTIONAL STRUCTURES WITH OUTPUT FROM AUTODESK REVIT AND PLAN TIME WITH WORK REALIZATION USING NAVISWORK
View through CrossRef
The government issued regulations related to BIM (Building Information Modeling) in July 2021. The PUPR Ministry issued circular no. 11/SE/Db/2021 which requires the implementation of BIM. There are BIM supporting applications, namely Autodesk Revit andAutodesk Naviswork. This research takes a case study of the construction of the Prof. Mother and Child Hospital Building. Dr. I.G.N.G Ngoerah Denpasar, whose BoQ calculations still use conventional or manual methods. Therefore, this research was carried out to find out the comparison of the Building Information Modeling and conventional concepts. Secondary data includes work drawings, BoQ, schedule and AHSP. Based on the research that has been carried out, the results of the comparison of the volume of columns and beams of the Autodesk Revit output structure are the total volume of 852,921.74 kg of steel and 2,456.72 m3 of concrete with a comparison of the volume of concrete between conventional and output from Autodesk Revit 1:0.946 and the volume ratio of 1:0.976 with a total cost of conventional RAB of IDR 19,313,295,875.58 and RAB from Autodesk Revit of IDR 18,760,742,153.46 with a ratio ofconventional RAB to output from Autodesk Revit of 1:0.971. deviation of -2.95% where the RAB from Autodesk Revit is IDR 552,553,722.12 less. The results of the plan time display with realization produce 12 work items that are being worked on and 30% work realization is achieved on day 119.
Title: COMPARATIVE ANALYSIS OF COLUMN AND BEAMS VOLUMES OF CONVENTIONAL STRUCTURES WITH OUTPUT FROM AUTODESK REVIT AND PLAN TIME WITH WORK REALIZATION USING NAVISWORK
Description:
The government issued regulations related to BIM (Building Information Modeling) in July 2021.
The PUPR Ministry issued circular no.
11/SE/Db/2021 which requires the implementation of BIM.
There are BIM supporting applications, namely Autodesk Revit andAutodesk Naviswork.
This research takes a case study of the construction of the Prof.
Mother and Child Hospital Building.
Dr.
I.
G.
N.
G Ngoerah Denpasar, whose BoQ calculations still use conventional or manual methods.
Therefore, this research was carried out to find out the comparison of the Building Information Modeling and conventional concepts.
Secondary data includes work drawings, BoQ, schedule and AHSP.
Based on the research that has been carried out, the results of the comparison of the volume of columns and beams of the Autodesk Revit output structure are the total volume of 852,921.
74 kg of steel and 2,456.
72 m3 of concrete with a comparison of the volume of concrete between conventional and output from Autodesk Revit 1:0.
946 and the volume ratio of 1:0.
976 with a total cost of conventional RAB of IDR 19,313,295,875.
58 and RAB from Autodesk Revit of IDR 18,760,742,153.
46 with a ratio ofconventional RAB to output from Autodesk Revit of 1:0.
971.
deviation of -2.
95% where the RAB from Autodesk Revit is IDR 552,553,722.
12 less.
The results of the plan time display with realization produce 12 work items that are being worked on and 30% work realization is achieved on day 119.
Related Results
Primerjalna književnost na prelomu tisočletja
Primerjalna književnost na prelomu tisočletja
In a comprehensive and at times critical manner, this volume seeks to shed light on the development of events in Western (i.e., European and North American) comparative literature ...
Penerapan Bulding Information Modelling (BIM) Autodesk Revit dalam Pembuatan Bar Bending Schedule (BBS) Pondasi Pile Cap Proyek Apartemen Jkt Living Star - Jakarta Timur
Penerapan Bulding Information Modelling (BIM) Autodesk Revit dalam Pembuatan Bar Bending Schedule (BBS) Pondasi Pile Cap Proyek Apartemen Jkt Living Star - Jakarta Timur
Bar bending schedule is a systeem of bending patterns of reinforcement that includes data on diameter, shape, length and number of reinforcement. The purpose of this study is to ob...
Environmental Surveillance Protocols for Highly Pathogenic Avian Influenza (HPAI) v2
Environmental Surveillance Protocols for Highly Pathogenic Avian Influenza (HPAI) v2
EnvironmentalSurveillance Protocols for Highly Pathogenic Avian Influenza (HPAI) This comprehensive protocol suite enables systematic environmental surveillance for avian influenza...
Lectin C gene analysis v1
Lectin C gene analysis v1
Mammalian Tissue Total RNA Purification Protocol by GeneJET RNA Purification Kit (Thermo Scientific, USA) Before starting: • Supplement the required amount of Lysis Buffer with β-...
Ensino de Revit® em disciplinas do curso noturno de engenharia civil em uma instituição de ensino privada
Ensino de Revit® em disciplinas do curso noturno de engenharia civil em uma instituição de ensino privada
O ensino de BIM na instituição começou em 2019, em uma disciplina do 9º período denominada Computação Gráfica Aplicada para Engenharia Civil (carga horária: 44 horas), com o ensino...
Penerapan BIM dalam Perhitungan Volume Pekerjaan dan Biaya Konstruksi Menggunakan Software Autodesk Revit pada Proyek Gedung Pengadilan Agama Sungai Raya
Penerapan BIM dalam Perhitungan Volume Pekerjaan dan Biaya Konstruksi Menggunakan Software Autodesk Revit pada Proyek Gedung Pengadilan Agama Sungai Raya
The calculation of work volume and construction costs is a fundamental aspect of project management, as errors in the estimation process can directly affect the preparation of the ...
Odd version Mathieu-Gaussian beam based on Green function
Odd version Mathieu-Gaussian beam based on Green function
Like the theoretical pattern of non-diffracting Bessel beams, ideal non-diffracting Mathieu beams also carry infinite energy, but cannot be generated as a physically realizable ent...
ANALISIS PERBANDINGAN VOLUME PEKERJAAN STRUKTUR ANTARA PERHITUNGAN MANUAL DENGAN BIM AUTODESK REVIT PADA PROYEK GEDUNG OLAHRAGA TAMBAKREJO KABUPATEN BOJONEGORO
ANALISIS PERBANDINGAN VOLUME PEKERJAAN STRUKTUR ANTARA PERHITUNGAN MANUAL DENGAN BIM AUTODESK REVIT PADA PROYEK GEDUNG OLAHRAGA TAMBAKREJO KABUPATEN BOJONEGORO
Penelitian ini membahas tentang perbandingan hasil perhitungan volume pekerjaan struktur pada proyek pembangunan Gedung Olahraga tambakrejo, Kabupaten Bojonegoro, dengan menggunaan...