The calculation of work volume and construction costs is a fundamental aspect of project management, as errors in the estimation process can directly affect the preparation of the project budget. Many projects still use conventional methods for estimation, which are based on 2D working drawings with the assistance of Microsoft Excel, as seen in the Sungai Raya Religious Court Building project. This method is considered prone to calculation errors and less efficient due to the considerable amount of time required. With the advancement of technology, Building Information Modeling (BIM) has emerged, enabling automatic and integrated calculation of work volumes and construction costs through a three-dimensional digital model. This study aims to examine the implementation of BIM in the Sungai Raya Religious Court Building project and to compare the results of work volume and construction cost calculations between the BIM method using Autodesk Revit and the conventional method based on the project’s Bill of Quantity (BoQ). The research method was conducted by modeling the structural elements of the building, including pile caps, tie beams, columns, beams, floor slabs, and reinforcements. The results of work volume and construction cost calculations obtained from Autodesk Revit were then compared with the project’s BoQ as the conventional method. Based on the analysis, an average difference of 6.3% in work volume and 5.6% in construction cost was found, with the Autodesk Revit calculations showing slightly lower values compared to the project’s BoQ.
Politeknik Pratama Purwokerto
Title: Penerapan BIM dalam Perhitungan Volume Pekerjaan dan Biaya Konstruksi Menggunakan Software Autodesk Revit pada Proyek Gedung Pengadilan Agama Sungai Raya
Description:
The calculation of work volume and construction costs is a fundamental aspect of project management, as errors in the estimation process can directly affect the preparation of the project budget.
Many projects still use conventional methods for estimation, which are based on 2D working drawings with the assistance of Microsoft Excel, as seen in the Sungai Raya Religious Court Building project.
This method is considered prone to calculation errors and less efficient due to the considerable amount of time required.
With the advancement of technology, Building Information Modeling (BIM) has emerged, enabling automatic and integrated calculation of work volumes and construction costs through a three-dimensional digital model.
This study aims to examine the implementation of BIM in the Sungai Raya Religious Court Building project and to compare the results of work volume and construction cost calculations between the BIM method using Autodesk Revit and the conventional method based on the project’s Bill of Quantity (BoQ).
The research method was conducted by modeling the structural elements of the building, including pile caps, tie beams, columns, beams, floor slabs, and reinforcements.
The results of work volume and construction cost calculations obtained from Autodesk Revit were then compared with the project’s BoQ as the conventional method.
Based on the analysis, an average difference of 6.
3% in work volume and 5.
6% in construction cost was found, with the Autodesk Revit calculations showing slightly lower values compared to the project’s BoQ.
Related Results
BIM implementation in architectural practices : towards advanced collaborative approaches based on digital technologies
BIM implementation in architectural practices : towards advanced collaborative approaches based on digital technologies
We are at a stage where Building Information Modelling (BIM) has reached a maturity level to be widely adopted by the professionals and organizations within the Architectural, Engi...
Implementasi BIM dengan Autodesk Revit 2025 pada quantity take-off material struktur Gedung Plaza Airlangga (Unair) tahap 1 terhadap volume
Implementasi BIM dengan Autodesk Revit 2025 pada quantity take-off material struktur Gedung Plaza Airlangga (Unair) tahap 1 terhadap volume
Perkembangan pesat dalam sektor konstruksi sangat dipengaruhi oleh fungsinya yang krusial dan efisien. Hal ini mendorong sektor konstruksi menuju integrasi yang lebih baik. Saat in...
BIM implementation: an empirical validation for a four-wheel model
BIM implementation: an empirical validation for a four-wheel model
Purpose Because BIM adoption is still afflicted by various types of hurdles, a complete BIM implementation model is required to provide the necessary methods for driving BIM adopti...
ANALISIS PERBANDINGAN VOLUME PEKERJAAN STRUKTUR ANTARA PERHITUNGAN MANUAL DENGAN BIM AUTODESK REVIT PADA PROYEK GEDUNG OLAHRAGA TAMBAKREJO KABUPATEN BOJONEGORO
ANALISIS PERBANDINGAN VOLUME PEKERJAAN STRUKTUR ANTARA PERHITUNGAN MANUAL DENGAN BIM AUTODESK REVIT PADA PROYEK GEDUNG OLAHRAGA TAMBAKREJO KABUPATEN BOJONEGORO
Penelitian ini membahas tentang perbandingan hasil perhitungan volume pekerjaan struktur pada proyek pembangunan Gedung Olahraga tambakrejo, Kabupaten Bojonegoro, dengan menggunaan...
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Analisis Estimasi Penyelesaian Proyek Konstruksi terhadap Waktu dan Biaya
Proyek konstruksi merupakan kegiatan yang memiliki tingkat kompleksitas tinggi, sehingga sering terjadi keterlambatan penyelesaian proyek maupun pembengkakan biaya akibat sistem ma...
ESTIMASI BIAYA STRUKTUR BANGUNAN MENGGUNAKAN BIM (BUILDING INFORMATION MODELLING)
ESTIMASI BIAYA STRUKTUR BANGUNAN MENGGUNAKAN BIM (BUILDING INFORMATION MODELLING)
Penggunaan BIM sebagai bagian dari inovasi pada proses pelaksanaan proyek diharapakan dapat membantu meminimalisir terjadinya penyebab cost overrun dalam pelaksanaan proyek konstru...
pariwisata
pariwisata
Secara khusus, keunikan kota banjarmasin yakni kota yang puitis dengan sebutan kota seribu sungai. Posisi kota banjarmasin di kelilingi sungai-sungai besar yang sangat vital fungsi...
ANALISIS PERHITUNGAN QUANTITY TAKE-OFF MENGGUNAKAN BUILDING INFORMATION MODELING (BIM) PADA PROYEK JALAN TOL INDRALAYA-PRABUMULIH
ANALISIS PERHITUNGAN QUANTITY TAKE-OFF MENGGUNAKAN BUILDING INFORMATION MODELING (BIM) PADA PROYEK JALAN TOL INDRALAYA-PRABUMULIH
Penerapan BIM pada proyek Pembangunan Jalan Tol merupakan upaya Kementrian PUPR dalam peningkatan daya produktifitas dan daya guna perencanaan dan pembangunan proyek konstruksi jal...