Application of earned value method and earned schedule method for a residential apartment

View through CrossRef
Abstract Earned Schedule Management (ESM) gives an estimate of schedule and milestone achievement dates. Earned Value Management (EVM) assists to follow the project performance by giving the schedule variance, cost variance and their performance index. EVM &ESM helps the project manager to foresee cost and schedule for the real project. The objective of this study is to apply EVM & ESM to the real time residential apartment project which is upcoming in Bengaluru, Karnataka, India and then to compare the results of two deterministic forecasting methods EVM and ESM. The EVM and ESM parameters are generated by using the data procured from the planning department. It shows much fluctuation in the project performance but the last months (M10) results reveal that the project is behind schedule, unfavorable budget and needs more amelioration. The project has an unfavorable Cost Variance of -0.91(budget in crores of INR, 1 crore = 10millions)) and schedule variance of -6.71months. It is also observed from the results and actual project situations that Earned Value and Earned Schedule methods in conjunction gives more accurate interpretation than using each of them detachedly.
Title: Application of earned value method and earned schedule method for a residential apartment
Description:
Abstract Earned Schedule Management (ESM) gives an estimate of schedule and milestone achievement dates.
Earned Value Management (EVM) assists to follow the project performance by giving the schedule variance, cost variance and their performance index.
EVM &ESM helps the project manager to foresee cost and schedule for the real project.
The objective of this study is to apply EVM & ESM to the real time residential apartment project which is upcoming in Bengaluru, Karnataka, India and then to compare the results of two deterministic forecasting methods EVM and ESM.
The EVM and ESM parameters are generated by using the data procured from the planning department.
It shows much fluctuation in the project performance but the last months (M10) results reveal that the project is behind schedule, unfavorable budget and needs more amelioration.
The project has an unfavorable Cost Variance of -0.
91(budget in crores of INR, 1 crore = 10millions)) and schedule variance of -6.
71months.
It is also observed from the results and actual project situations that Earned Value and Earned Schedule methods in conjunction gives more accurate interpretation than using each of them detachedly.

Related Results

PERHITUNGAN DURASI PROYEK JALAN TOL DENGAN METODE EARNED SCHEDULE
PERHITUNGAN DURASI PROYEK JALAN TOL DENGAN METODE EARNED SCHEDULE
The slower-than-anticipated progress of construction projects is a common complaint in Indonesia. Several methods have been developed to address this issue, and the Earned Schedule...
De gevel – een intermediair element tussen buiten en binnen
De gevel – een intermediair element tussen buiten en binnen
This study is based on the fact that all people have a basic need for protection from other people (and animals) as well as from the elements (the exterior climate). People need a ...
Apartment Layouts of Social Housing for Tomsk Architecture
Apartment Layouts of Social Housing for Tomsk Architecture
Apartment layouts define the types of residential cells and their correlation with a multiapartment residential building or residential development. It is one of the main parameter...
Problems and Solutions of Multi-apartment Housing Management in Latvia
Problems and Solutions of Multi-apartment Housing Management in Latvia
Housing policy is closely related to the well-being and social integration of the population of each country, and has a great impact on the development of various sectors and the e...
Apartments
Apartments
The apartment (as housing type) is a set of rooms, including a kitchen, designed as a complete dwelling for occupation by a single household within a larger structure or complex, t...
Influences on Apartment Design: A History of the Spatial Layout of Apartment Buildings in Sydney and Implications for the Future
Influences on Apartment Design: A History of the Spatial Layout of Apartment Buildings in Sydney and Implications for the Future
This paper traces the history of apartment design with an emphasis on spatial layout. It charts the events that have influenced apartment design in Sydney, Australia and provides a...
Analysis survey for Some risk factors Related with Autism patients in Iraq
Analysis survey for Some risk factors Related with Autism patients in Iraq
Autism spectrum disorder (ASD) is a group of neurodevelopmental disorders characterized by persistent impairment in social communication and interaction and restricted and repetiti...
Analysis survey for Some risk factors Related with Autism patients in Iraq
Analysis survey for Some risk factors Related with Autism patients in Iraq
ASD is a collection of neurodevelopmental conditions defined by limited and recurrent variations in conduct, hobbies, and interests, as well as a chronic difficulty in socially int...

Back to Top