Evaluasi Tingkat Keandalan Sistem Distribusi 20 kV Menggunakan Indeks SAIDI SAIFI

View through CrossRef
Reliability describes the proportion of service level when power is delivered from the system to the customer. PT. PLN (Persero) UP3 Biak still experiences frequent power outages due to fallen trees, animal activities such as snakes, and disturbances due to blackouts due to bad weather, which affects the reliability value. By using SAIDI and SAIFI to determine the level of reliability at PT. PLN (Persero) UP3 Biak, then based on the standards that have been determined by the Main Unit for the Papua and West Papua Regions with a SAIDI value of 10.11 hours/customer/year and SAIFI = 9.72 times/customer/year. For this reason, periodic maintenance is carried out such as tree removal, installation of fibers, installation of insulators and repair of SUTM and SUTR constructions. After the maintenance, the results showed that there was a change in the value of SAIDI and SAIFI, namely ULP Biak City, the value of SAIDI = 5.9 hours/customer and SAIFI = 4.98 times/customer with a percentage decrease of 87.6% and 88.8%, respectively. ULP Yumdori value SAIDI = 11.48 hours/customer and SAIFI = 5.97 times/customer with a percentage decrease of 90.1% and 94.3%, respectively. ULP Serui value SAIDI = 6.48 hours/customer and SAIFI = 3.79 times/customer with a percentage decrease of 83.4% and 86.9%. ULP Waropen value SAIDI = 0.77 hours/customer and SAIFI = 0.95 times/customer with a percentage decrease of 92.2% and 86%, respectively.
Title: Evaluasi Tingkat Keandalan Sistem Distribusi 20 kV Menggunakan Indeks SAIDI SAIFI
Description:
Reliability describes the proportion of service level when power is delivered from the system to the customer.
PT.
PLN (Persero) UP3 Biak still experiences frequent power outages due to fallen trees, animal activities such as snakes, and disturbances due to blackouts due to bad weather, which affects the reliability value.
By using SAIDI and SAIFI to determine the level of reliability at PT.
PLN (Persero) UP3 Biak, then based on the standards that have been determined by the Main Unit for the Papua and West Papua Regions with a SAIDI value of 10.
11 hours/customer/year and SAIFI = 9.
72 times/customer/year.
For this reason, periodic maintenance is carried out such as tree removal, installation of fibers, installation of insulators and repair of SUTM and SUTR constructions.
After the maintenance, the results showed that there was a change in the value of SAIDI and SAIFI, namely ULP Biak City, the value of SAIDI = 5.
9 hours/customer and SAIFI = 4.
98 times/customer with a percentage decrease of 87.
6% and 88.
8%, respectively.
ULP Yumdori value SAIDI = 11.
48 hours/customer and SAIFI = 5.
97 times/customer with a percentage decrease of 90.
1% and 94.
3%, respectively.
ULP Serui value SAIDI = 6.
48 hours/customer and SAIFI = 3.
79 times/customer with a percentage decrease of 83.
4% and 86.
9%.
ULP Waropen value SAIDI = 0.
77 hours/customer and SAIFI = 0.
95 times/customer with a percentage decrease of 92.
2% and 86%, respectively.

Related Results

Analisis Keandalan Jaringan Distribusi 20kV Pada ULP Toili Berdasarkan SAIDI dan SAIFI
Analisis Keandalan Jaringan Distribusi 20kV Pada ULP Toili Berdasarkan SAIDI dan SAIFI
PT. PLN (Persero) ULP Toili berperan sebagai pelayanan pelanggan dan pemeliharaan jaringan distribusi dalam ruang lingkup kawasan yang lebih kecil di bawah UP3 Luwuk. ULP Toili mel...
Analisis Sistem Jaringan Tegangan Rendah di PT. PLN ULP Binjai Timur Dengan Metode Failure Mode and Effect
Analisis Sistem Jaringan Tegangan Rendah di PT. PLN ULP Binjai Timur Dengan Metode Failure Mode and Effect
Keandalan sistem jaringan tegangan rendah atau distribusi merupakan kemampuan sistem untuk memberikan suatu pasokan tenaga listrik yang cukup dengan kualitas memuaskan. Peningkatan...
Analisa Keandalan Distribusi 20 KV Menggunakan SAIDI dan SAIFI di ULP Caruban
Analisa Keandalan Distribusi 20 KV Menggunakan SAIDI dan SAIFI di ULP Caruban
<em>Sistem distribusi mempunyai peranan yang begitu banyak dalam memberi jaminan dan kualitas saat menyalurkan energi listrik,sehingga mampu terpenuhi standar baik dalam ling...
Analisis Penempatan Recloser Terhadap Keandalan Sistem Tenaga Listrik Di ULP Sungguminasa
Analisis Penempatan Recloser Terhadap Keandalan Sistem Tenaga Listrik Di ULP Sungguminasa
Pada skripsi Ini dilakukan analisis penempatan recloser terhadap keandalan sistem tenaga listrik di ulp sungguminasa khususnya di penyulang Tamarunang.Tujuan dari peneilitian ini y...
Analisis Ketersediaan Daya dan Keandalan Sistem Jaringan Distribusi di Universitas Borneo Tarakan
Analisis Ketersediaan Daya dan Keandalan Sistem Jaringan Distribusi di Universitas Borneo Tarakan
Tingkat keandalan merupakan salah satu hal yang vital dalam penyaluran tenaga listrik. Sistem distribusi yang andal akan menjamin tingkat kontinuitas pelayanan pada sistem distribu...
Analisis Dampak Operasional Pemasangan Recloser Smp 1 Terhadap Keandalan Jaringan Distribusi PT. PLN (Persero) ULP Mamasa
Analisis Dampak Operasional Pemasangan Recloser Smp 1 Terhadap Keandalan Jaringan Distribusi PT. PLN (Persero) ULP Mamasa
Keandalan sistem distribusi tenaga listrik berperan penting dalam menjaga kontinuitas pelayanan kepada pelanggan serta meminimalkan kerugian energi. Penyulang Mamasa yang menyuplai...
Recloser Placement Optimization In The PDP-03 Radial Network Distribution System Using Ant Colony Optimization (ACO)
Recloser Placement Optimization In The PDP-03 Radial Network Distribution System Using Ant Colony Optimization (ACO)
The increasing demand for electricity demanded that the power distribution system has a good reliability. To improve the reliability of electric power systems, PT. PLN Area Semaran...

Back to Top