This paper describes:The technical solution and infra-structureThe work processPlans and visions for the future
This project will contribute towards the Statoil Increased Oil Recovery (IOR) strategy as it will make real-time reservoir monitoring and downhole data available everywhere on a Statoil network infrastructure.
It will be a frontrunner in the development and implementation of downhole fiber optic sensors and infrastructure as a basis for online reservoir management. The goal is to resolve any hurdles for implementing fiber optic monitoring and data transmission from subsea developments where this technology can give Statoil an improved business value.
Focus is on detailed seabead system solutions to create an open, and high speed communication infrastructure which the fiber optics technology opens up. The project shall also develop interfaces towards existing subsea systems with only electrical, low bandwidth communication systems.
Background
On June 20th 2005, Statoil requested technical and commercial proposals relating to the development of:Integrated Fibre Optical Systems - an integrated subsea fiber optics communications systemReliable Downhole Sensors - of which some eight were identified
This was part of the much larger Statoil Integrated Operations initiative aimed at increasing overall recovery rates of subsea and Tail End production assets.
Weatherford subsequently formed agreements with FMC Technologies and Nexans Norway to jointly develop the proposal submitted, with Weatherford as the lead contractor, and on June 29th, 2006, Statoil and Weatherford signed a 3 year Technical Development Cooperation Agreement. The resultant program is a 50/50 jointly funded R&D program with resources (personnel and test facilities etc.) being supplied from all four participating companies to work on each subproject of the overall project. Weatherford concurrently signed back-to-back sub-contractor agreements with FMC Technologies and Nexans Norway. Subsequent to contract award, a three year Technical Cooperation Agreement was set up and funded to address the scope of work.
The scope of the project (figure 1) can be summarized as follows: "Qualification of fiber optic sensing systems for subsea well applications and integrated subsea solutions for transmitting sensor signals to onshore through optical fibers."
Figure 1 - The complete integrated system (available in full paper)
There are two key project areas: Downhole Sensors (DHS) - the following three having been agreed upon from the initial listing of eight: Sand monitoring - identification and quantification Multiphase flow meter - for intelligent well applications Distributed pressure and temperature measurements Integrated Fiber Optic Subsea System (IFOSS) Subsea well sensor interrogation solutions Subsea control system Subsea telecommunication and transmission system Integrated fiber optic system
Solutions are to be developed for both Green and retrofit Brown field applications. The current status of the project is that detailed Project Plans were completed on October 23rd and the project officially kicked-off October 25th. This paper describes in detail the planned project activities and the anticipated system outcome.
Title: Subsea Data Management
Description:
Abstract
This paper describes:The technical solution and infra-structureThe work processPlans and visions for the future
This project will contribute towards the Statoil Increased Oil Recovery (IOR) strategy as it will make real-time reservoir monitoring and downhole data available everywhere on a Statoil network infrastructure.
It will be a frontrunner in the development and implementation of downhole fiber optic sensors and infrastructure as a basis for online reservoir management.
The goal is to resolve any hurdles for implementing fiber optic monitoring and data transmission from subsea developments where this technology can give Statoil an improved business value.
Focus is on detailed seabead system solutions to create an open, and high speed communication infrastructure which the fiber optics technology opens up.
The project shall also develop interfaces towards existing subsea systems with only electrical, low bandwidth communication systems.
Background
On June 20th 2005, Statoil requested technical and commercial proposals relating to the development of:Integrated Fibre Optical Systems - an integrated subsea fiber optics communications systemReliable Downhole Sensors - of which some eight were identified
This was part of the much larger Statoil Integrated Operations initiative aimed at increasing overall recovery rates of subsea and Tail End production assets.
Weatherford subsequently formed agreements with FMC Technologies and Nexans Norway to jointly develop the proposal submitted, with Weatherford as the lead contractor, and on June 29th, 2006, Statoil and Weatherford signed a 3 year Technical Development Cooperation Agreement.
The resultant program is a 50/50 jointly funded R&D program with resources (personnel and test facilities etc.
) being supplied from all four participating companies to work on each subproject of the overall project.
Weatherford concurrently signed back-to-back sub-contractor agreements with FMC Technologies and Nexans Norway.
Subsequent to contract award, a three year Technical Cooperation Agreement was set up and funded to address the scope of work.
The scope of the project (figure 1) can be summarized as follows: "Qualification of fiber optic sensing systems for subsea well applications and integrated subsea solutions for transmitting sensor signals to onshore through optical fibers.
"
Figure 1 - The complete integrated system (available in full paper)
There are two key project areas: Downhole Sensors (DHS) - the following three having been agreed upon from the initial listing of eight: Sand monitoring - identification and quantification Multiphase flow meter - for intelligent well applications Distributed pressure and temperature measurements Integrated Fiber Optic Subsea System (IFOSS) Subsea well sensor interrogation solutions Subsea control system Subsea telecommunication and transmission system Integrated fiber optic system
Solutions are to be developed for both Green and retrofit Brown field applications.
The current status of the project is that detailed Project Plans were completed on October 23rd and the project officially kicked-off October 25th.
This paper describes in detail the planned project activities and the anticipated system outcome.
Related Results
Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract
As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract
This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
High Voltage Subsea Pump – A Low Cost Subsea Boosting Enabler
High Voltage Subsea Pump – A Low Cost Subsea Boosting Enabler
In a cost constrained scenario, technology driven solutions aiming at CAPEX reductions are crucial to make Subsea Processing (SSP) projects economically attractive. Subsea Processi...
Technology Focus: Subsea Systems (August 2025)
Technology Focus: Subsea Systems (August 2025)
_
From a broader and high-level perspective—considering importance, impact, significance, and criticality—subsea systems and advanced offshore engineering play an...
Subsea Facilities
Subsea Facilities
Abstract
This paper presents the system design and concept solutions selected for the Ormen Lange subsea facilities.
The field is located in a r...
Mensa Project: Subsea Tree System
Mensa Project: Subsea Tree System
Abstract
This paper describes the design, product development and offshore installation of the subsea trees for the Shell Offshore Inc. (SOI) Mensa Project. The M...
Autonomous Subsea Field Development - Value Proposition, Technology Needs and Gaps for Future Advancement
Autonomous Subsea Field Development - Value Proposition, Technology Needs and Gaps for Future Advancement
Abstract
With increasing demand of subsea processing and surveillance goals Best-in-Class Operators are developing advanced subsea instrumentation and controls to ch...
Digitalization Goes Subsea
Digitalization Goes Subsea
This paper discusses the requirements for a "next-generation" subsea control system and provides a description of the proposed setup/architecture. Requirements for "next-generation...