Remediation of A Complex Blockage for Gumusut-Kakap Subsea Flexible Flowline from a System Perspective
View through CrossRef
Abstract
A subsea production flexible flowline in Gumusut-Kakap field was found blocked in March 2021 during a routine production well-flowline switching/alignment operation. Further evaluation showed that the blockage was caused by the formation of hydrate and gel over the 1.3km length of the flexible flowline, as the live crude and water were left stagnant and untreated in the flowline over a prolonged period. This paper covers the remediation strategy and the associated challenges from a System perspective, which successfully unblocked the flowline within a relatively short period of time.
The condition of the blockage in the flexible flowline was simulated using a commercial multiphase dynamic software to ascertain the phase distribution and hence allowed the estimation of the location and length of hydrate, gel, and emulsion in the flowline which has a downward inclination of circa 50 meters height. Heating (from production well), methanol (MeOH) soaking and flowline depressurization were planned and executed. In addition to the technical methodology, the System-wide aspects were also considered for the effective and optimum execution of the remediation activities which include attempting to fulfill the production commitment, abide by the subsea hardware and flexible flowline integrity envelope, and consider the impact of the remediation operation on other operations at the Gumusut-Kakap installation.
The MeOH soaking, flowline depressurization and pressurization successfully remediated the blockage over the period of weeks. Positive results were observed at the start of the remediation when the targeted location for MeOH contact and depressurization were identified via field trial. One of the key challenges is the time factor in which to ascertain the "appropriate" waiting time for the flowline depressurization, as the remediation involved partial shut-in of the prolific production wells.
A holistic System engineering approach is critical to the successful remediation of the blockage, integrating the key technical requirements as well as the soft and non-technical aspects to deliver optimum and net positive value for the asset.
Title: Remediation of A Complex Blockage for Gumusut-Kakap Subsea Flexible Flowline from a System Perspective
Description:
Abstract
A subsea production flexible flowline in Gumusut-Kakap field was found blocked in March 2021 during a routine production well-flowline switching/alignment operation.
Further evaluation showed that the blockage was caused by the formation of hydrate and gel over the 1.
3km length of the flexible flowline, as the live crude and water were left stagnant and untreated in the flowline over a prolonged period.
This paper covers the remediation strategy and the associated challenges from a System perspective, which successfully unblocked the flowline within a relatively short period of time.
The condition of the blockage in the flexible flowline was simulated using a commercial multiphase dynamic software to ascertain the phase distribution and hence allowed the estimation of the location and length of hydrate, gel, and emulsion in the flowline which has a downward inclination of circa 50 meters height.
Heating (from production well), methanol (MeOH) soaking and flowline depressurization were planned and executed.
In addition to the technical methodology, the System-wide aspects were also considered for the effective and optimum execution of the remediation activities which include attempting to fulfill the production commitment, abide by the subsea hardware and flexible flowline integrity envelope, and consider the impact of the remediation operation on other operations at the Gumusut-Kakap installation.
The MeOH soaking, flowline depressurization and pressurization successfully remediated the blockage over the period of weeks.
Positive results were observed at the start of the remediation when the targeted location for MeOH contact and depressurization were identified via field trial.
One of the key challenges is the time factor in which to ascertain the "appropriate" waiting time for the flowline depressurization, as the remediation involved partial shut-in of the prolific production wells.
A holistic System engineering approach is critical to the successful remediation of the blockage, integrating the key technical requirements as well as the soft and non-technical aspects to deliver optimum and net positive value for the asset.
Related Results
Combined Effect of Flowline Walking and Riser Dynamic Loads on HP/HT Flowline Design
Combined Effect of Flowline Walking and Riser Dynamic Loads on HP/HT Flowline Design
Abstract
Some high pressure, high temperature (HPHT) flowlines have experienced a gradual, overall axial displacement over a number of heating/cooling cycles. Thi...
Simple Subsea Trees for Shallow Water: An Economical Alternative
Simple Subsea Trees for Shallow Water: An Economical Alternative
Abstract
Simple, diver assisted subsea completions have been installed and operated successfully in many shallow water oil fields around the world. Although these...
Wax-On, Wax-Off: Understanding and Mitigating Wax Deposition in a Deepwater Subsea Gas/Condensate Flowline
Wax-On, Wax-Off: Understanding and Mitigating Wax Deposition in a Deepwater Subsea Gas/Condensate Flowline
Abstract
The subsea Coulomb field is a two-well gas/condensate development in 7500 fsw, tied back to the NaKika platform in the Gulf of Mexico via a single 27-mil...
Mensa Project: Subsea Tree System
Mensa Project: Subsea Tree System
Abstract
This paper describes the design, product development and offshore installation of the subsea trees for the Shell Offshore Inc. (SOI) Mensa Project. The M...
Mensa Project: Flowlines
Mensa Project: Flowlines
Abstract
This paper describes engineering designs, installation particulars and learning points from development of the Mensa pipeline transportation system. The ...
Subsea High Integrity Pressure Protection Systems for high pressure oil and gas developments
Subsea High Integrity Pressure Protection Systems for high pressure oil and gas developments
Abstract
With oil and gas operators now focusing on smaller assets to develop, every opportunity to reduce costs, with due consideration to safety is being carefu...
Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract
As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Inspection of Subsea Conductors Using an Innovative Drop-Down Camera
Inspection of Subsea Conductors Using an Innovative Drop-Down Camera
Abstract
Subsea conductors are the foundational elements of offshore drilling operations, serving a dual purpose as both the structural framework and the main condui...