Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

ANALISIS BEBAN KERJA FISIK DAN MENTAL PEKERJA PADA PROSES VULKANISIR BAN DENGAN MENGGUNAKAN METODE CARDIOVASCULAR LOAD (CVL) DAN NASA-TLX

View through CrossRef
UD. Pandawa Tire is a UD engaged in the manufacture of tires retreaded. The production process at Pandawa Tires still often does overtime due to the number of new employees 9 people and the average target of making 60 tires every day which causes fatigue and mental and physical workload. The analytical methods used to measure the physical and mental workload of workers are Cardiovascular Load (CVL) and the National Aeronautics and Space Administration Task Load Index (NASA-TLX). The results showed that the greatest physical workload was felt by workers with a CVL percentage of 46.1%, which was between 30% to 60% in the medium category, meaning that improvements are needed but not urgent. While the results of the measurement of mental workload showed that all workers were included in the high category, with the largest NASA-TLX score of 83.33. Correlation Test was Pearson Product Moment conducted to see the relationship between the value of the physical and mental workload received by the worker. The results of the calculation of the correlation test show that there is a relationship between CVL and NASA-TLX, although there is a correlation, but the correlation is significant in influencing each other between the amount of physical workload and mental workload felt by workers. The correlation value of r obtained is 0.672. Which means that there is a strong positive correlation between the physical workload and the mental burden felt by the Pandawa tire workers
Institut Sains and Teknologi AKPRIND Yogyakarta
Title: ANALISIS BEBAN KERJA FISIK DAN MENTAL PEKERJA PADA PROSES VULKANISIR BAN DENGAN MENGGUNAKAN METODE CARDIOVASCULAR LOAD (CVL) DAN NASA-TLX
Description:
UD.
Pandawa Tire is a UD engaged in the manufacture of tires retreaded.
The production process at Pandawa Tires still often does overtime due to the number of new employees 9 people and the average target of making 60 tires every day which causes fatigue and mental and physical workload.
The analytical methods used to measure the physical and mental workload of workers are Cardiovascular Load (CVL) and the National Aeronautics and Space Administration Task Load Index (NASA-TLX).
The results showed that the greatest physical workload was felt by workers with a CVL percentage of 46.
1%, which was between 30% to 60% in the medium category, meaning that improvements are needed but not urgent.
While the results of the measurement of mental workload showed that all workers were included in the high category, with the largest NASA-TLX score of 83.
33.
Correlation Test was Pearson Product Moment conducted to see the relationship between the value of the physical and mental workload received by the worker.
The results of the calculation of the correlation test show that there is a relationship between CVL and NASA-TLX, although there is a correlation, but the correlation is significant in influencing each other between the amount of physical workload and mental workload felt by workers.
The correlation value of r obtained is 0.
672.
Which means that there is a strong positive correlation between the physical workload and the mental burden felt by the Pandawa tire workers.

Related Results

FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature  Review Anna Tri Wahyuni1), Masfuri2),  Liya Arista3)1,2,3 Fakultas Ilmu Keperawatan Univers...
Abstract 2452: Deorphanizing TLX: Implications for treatment of glioblastomas
Abstract 2452: Deorphanizing TLX: Implications for treatment of glioblastomas
Abstract Nuclear receptors (NRs) are important ligand-dependent transcriptional factors. Presently, no natural or synthetic ligand has been identified for a large gr...
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
Analisis waktu standar produksi merupakan salah satu analisis metoda kuantitatif yang dilakukan untuk mengukur waktu produksi dan bertujuan agar dapat memiliki waktu standar sebaga...
KECEMASAN SAAT PANDEMI COVID 19: LITERATUR REVIEW Hardiyati, Efri Widianti, Taty Hernawaty Departemen Keperawatan Jiwa Poltekkes Kemenkes Mamuju Sulbar, Universitas Pad...
ANALISIS BEBAN KERJA FISIK PEKERJA UMKM KERIPIK MENGGUNAKAN METODE CMDQ DAN CVL
ANALISIS BEBAN KERJA FISIK PEKERJA UMKM KERIPIK MENGGUNAKAN METODE CMDQ DAN CVL
Home industry keripik milik bapak Selam merupakan Home industry yang bergerak di bidang kuliner/makanan dan berlokasi di daerah Kecamatan Matesih, Kabupaten Karanganyar. Sebagian b...
Beban Kerja dan Kelelahan Kerja pada Pekerja Tatalaksana di Unisba
Beban Kerja dan Kelelahan Kerja pada Pekerja Tatalaksana di Unisba
Abstract. The workload is something that arises from the interaction between the needs of the work environment that is used as a workplace, and the skills and perceptions of worker...

Back to Top