Javascript must be enabled to continue!
Simulation of temporary plugging agent transport and optimization of fracturing parameters based on fiber optic monitoring data
View through CrossRef
Temporary plugging and fracturing is an important technology for the efficient development of unconventional reservoirs. Due to the diverse physical properties of unconventional reservoirs and the complex stress environment, the evaluation of temporary plugging effect needs to consider the working conditions in the wells, and it also needs to focus on the transport and placement of temporary plugging agent in the near-well fracture region, so it is impossible to predict the effect of temporary plugging and fracturing effectively. In this paper, a numerical simulation study is carried out to investigate the transport and placement of temporary plugging agent in the near-well area, and a finite element model of “wellbore-near-well fracture” is established based on computational fluid dynamics, and numerical simulation and verification of temporary plugging and fracturing are carried out based on the fiber-optic monitoring data of temporary plugging and fracturing in Well A, as well as the optimization of some construction parameters. The results show that: as the volume concentration of temporary plugging agent increases, the temporary plugging effect is weakened and then strengthened, and the temporary plugging agent will enter into the heel cluster in advance when the concentration is small; at the initial stage, the increase in the quality of temporary plugging agent will cause some clusters to form incomplete plugging, but the quality of the plugging agent will not be changed after the quality is greater than 360kg; the temporary plugging effect is mainly reflected in the heel cluster, and the toe cluster is not obvious. This paper forms a set of temporary plugging and fracturing simulation methods based on the actual fiber-optic monitoring data in the field, which provides a reference for the optimization design of the type, particle size and dosage of temporary plugging agent during the temporary plugging construction process.
Title: Simulation of temporary plugging agent transport and optimization of fracturing parameters based on fiber optic monitoring data
Description:
Temporary plugging and fracturing is an important technology for the efficient development of unconventional reservoirs.
Due to the diverse physical properties of unconventional reservoirs and the complex stress environment, the evaluation of temporary plugging effect needs to consider the working conditions in the wells, and it also needs to focus on the transport and placement of temporary plugging agent in the near-well fracture region, so it is impossible to predict the effect of temporary plugging and fracturing effectively.
In this paper, a numerical simulation study is carried out to investigate the transport and placement of temporary plugging agent in the near-well area, and a finite element model of “wellbore-near-well fracture” is established based on computational fluid dynamics, and numerical simulation and verification of temporary plugging and fracturing are carried out based on the fiber-optic monitoring data of temporary plugging and fracturing in Well A, as well as the optimization of some construction parameters.
The results show that: as the volume concentration of temporary plugging agent increases, the temporary plugging effect is weakened and then strengthened, and the temporary plugging agent will enter into the heel cluster in advance when the concentration is small; at the initial stage, the increase in the quality of temporary plugging agent will cause some clusters to form incomplete plugging, but the quality of the plugging agent will not be changed after the quality is greater than 360kg; the temporary plugging effect is mainly reflected in the heel cluster, and the toe cluster is not obvious.
This paper forms a set of temporary plugging and fracturing simulation methods based on the actual fiber-optic monitoring data in the field, which provides a reference for the optimization design of the type, particle size and dosage of temporary plugging agent during the temporary plugging construction process.
Related Results
Sequential Propagation of Multiple Fractures in Horizontal Wells
Sequential Propagation of Multiple Fractures in Horizontal Wells
ABSTRACT:
Simultaneous fracturing and zipper fracturing of horizontal wells has rapidly evolved to the development of unconventional oil and gas. The fracture int...
Experimental Investigation on the Threshold Transportable Concentration of Temporary Plugging Materials of Different Sizes of Slide Sleeves
Experimental Investigation on the Threshold Transportable Concentration of Temporary Plugging Materials of Different Sizes of Slide Sleeves
ABSTRACT
The uncased horizontal wellbore is widely used in high-strength formation, especially in low porosity and low permeability carbonate reservoirs to enlarg...
Design and Application of Systematic Fracturing in WL Reservoir
Design and Application of Systematic Fracturing in WL Reservoir
Abstract
WL reservoir located in the north of China is an important exploration area of PetroChina. The reservoir depth is about 1300–1500m. The average formation...
Study of Damage Evaluation of Hydraulic Fracturing to Reservoirs
Study of Damage Evaluation of Hydraulic Fracturing to Reservoirs
Abstract
Classic hydraulic fracturing analysis is based on tensile strength of rock, failure criteria of fracture mechanics or Mohr-Coulomb criteria. The existing...
Three-Dimensional Geomechanical Modeling and Well Spacing Optimization Application in Sichuan Shale Gas Block
Three-Dimensional Geomechanical Modeling and Well Spacing Optimization Application in Sichuan Shale Gas Block
ABSTRACT:
At present, unconventional reservoirs require horizontal drilling and large-scale hydraulic fracturing technology to increase artificial fracture networ...
Perspectives of Unconventional Water Sources Implementation in Hydraulic Fracturing
Perspectives of Unconventional Water Sources Implementation in Hydraulic Fracturing
Abstract
Currently, Russia experienced a rapid growth in horizontal wells drilling. The most popular method of completion is hydraulic fracturing. About 99% of hydra...
Green Fracturing Technology of Shale Gas: LPG Waterless Fracturing Technology and its Feasibility in China
Green Fracturing Technology of Shale Gas: LPG Waterless Fracturing Technology and its Feasibility in China
Abstract
As a kind of water saving and green fracturing methodology, the innovative LPG fracturing fluid system that is developed by Gasfrac is known for its low den...
Testing XLE For Cost Savings in the DJ Basin: A Fiber Optic Case Study
Testing XLE For Cost Savings in the DJ Basin: A Fiber Optic Case Study
Abstract
Historically, Great Western Petroleum has been an operator focused on efficiency without much focus on altering completion designs. Based on the successes o...

