Load Sharing in Transversely Post-Tensioned Pre-cast Box Girder Skew Bridges
View through CrossRef
Railway operators often use precast concrete box girders for railway bridges. In many cases, these box girders are placed side by side without a concrete deck on top. Sometimes these box girders are post-tensioned transversely to hold the girders together. The load distribution among the girders is easy to calculate when there is no transverse post-tensioning. Once the transverse post tensioning is introduced, the load sharing among the girders becomes more challenging to quantify. The way such a bridge is modeled will significantly affect the results of the analysis, especially when the bridge is at a skew. The assumptions made regarding the post-tensioning and how it is modeled will have a significant effect on the results due to the skew effect combined with how these girders interact. American Railway Engineering and Maintenance-of-way Association – AREMA – limits the skew angle for precast concrete slab and box girder railway bridges to 15 degrees while it allows skews up to 30 degrees for precast concrete I-girders and T-girders and 60 degrees skew angles for Cast-in-place concrete slabs and girders. AREMA does not specify limits for the skew angle of steel bridge structures. These limitations are established by way of surveying railway operators regarding their inventory of bridges rather than a scientific study analyzing the effects of such skew angles on the different types of bridges. In this paper the effect of transverse post tensioning on load sharing of precast box girder bridges is investigated and discussed for square and skew bridges. The effect of the skew on the behavior of such a bridge is also discussed and investigated through a finite element model.
Title: Load Sharing in Transversely Post-Tensioned Pre-cast Box Girder Skew Bridges
Description:
Railway operators often use precast concrete box girders for railway bridges.
In many cases, these box girders are placed side by side without a concrete deck on top.
Sometimes these box girders are post-tensioned transversely to hold the girders together.
The load distribution among the girders is easy to calculate when there is no transverse post-tensioning.
Once the transverse post tensioning is introduced, the load sharing among the girders becomes more challenging to quantify.
The way such a bridge is modeled will significantly affect the results of the analysis, especially when the bridge is at a skew.
The assumptions made regarding the post-tensioning and how it is modeled will have a significant effect on the results due to the skew effect combined with how these girders interact.
American Railway Engineering and Maintenance-of-way Association – AREMA – limits the skew angle for precast concrete slab and box girder railway bridges to 15 degrees while it allows skews up to 30 degrees for precast concrete I-girders and T-girders and 60 degrees skew angles for Cast-in-place concrete slabs and girders.
AREMA does not specify limits for the skew angle of steel bridge structures.
These limitations are established by way of surveying railway operators regarding their inventory of bridges rather than a scientific study analyzing the effects of such skew angles on the different types of bridges.
In this paper the effect of transverse post tensioning on load sharing of precast box girder bridges is investigated and discussed for square and skew bridges.
The effect of the skew on the behavior of such a bridge is also discussed and investigated through a finite element model.
Related Results
Flexural performance of prestressed concrete I-shaped bridge girders exposed to hydrocarbon fire
Flexural performance of prestressed concrete I-shaped bridge girders exposed to hydrocarbon fire
This study examines the flexural performance of identical I-shaped bridge girders with different prestressing arrangements and methods under fire conditions. A finite element model...
Unveiling the third dimension of glass
Unveiling the third dimension of glass
Glass as a material has always fascinated architects. Its inherent transparency has given us the ability to create diaphanous barriers between the interior and the exterior that al...
Seismic Design Assessment of Bridge Piers Location Effect on the Structural Capacity of Supports under Earthquake Action
Seismic Design Assessment of Bridge Piers Location Effect on the Structural Capacity of Supports under Earthquake Action
The objective of this study was to assess the seismic performance of two types of bridges structures under effect of earthquake by using different locations and numbers of piers. T...
[RETRACTED] Keanu Reeves CBD Gummies v1
[RETRACTED] Keanu Reeves CBD Gummies v1
[RETRACTED]Keanu Reeves CBD Gummies ==❱❱ Huge Discounts:[HURRY UP ] Absolute Keanu Reeves CBD Gummies (Available)Order Online Only!! ❰❰= https://www.facebook.com/Keanu-Reeves-CBD-G...
Numerical Analysis on Sliding-Type Transverse Splicing Connection Applied in Widening Continuous Concrete Box-Girder Bridge
Numerical Analysis on Sliding-Type Transverse Splicing Connection Applied in Widening Continuous Concrete Box-Girder Bridge
When traditional joint structures are used to widen multi-span continuous concrete box girder bridges, excessive lateral deformation often occurs at the girder ends, typically lead...
Analisis Kapasitas Box Girder pada Jembatan
Analisis Kapasitas Box Girder pada Jembatan
Proyek Jalan Tol Jakarta-Cikampek II Selatan Paket 3-Induk, merupakan Tol yang terintegritas dengan Tol Jakarta Outer Ring Road (JORR) dan Tol Purbaleunyi di Sadang Purwakarta. Pen...
RISK ANALYSIS WITH THE HIRARC METHOD ON INSTALLATION STEEL BOX GIDER CONSTRUCTION OF ALOHA FLYOVER SIDOARJO
RISK ANALYSIS WITH THE HIRARC METHOD ON INSTALLATION STEEL BOX GIDER CONSTRUCTION OF ALOHA FLYOVER SIDOARJO
Research on the Aloha flyover construction project aims to determine the risks that occur in the workmanship of installing steel box girder, knowing the level of risk that occurs i...
China's Major Bridges
China's Major Bridges
<p>In response to continuous economic development over the past 30 years, China has mobilized a program of large scale bridge construction. The technology of various types of...