Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

RISK ANALYSIS WITH THE HIRARC METHOD ON INSTALLATION STEEL BOX GIDER CONSTRUCTION OF ALOHA FLYOVER SIDOARJO

View through CrossRef
Research on the Aloha flyover construction project aims to determine the risks that occur in the workmanship of installing steel box girder, knowing the level of risk that occurs in the workmanship of installing steel box girder and knowing how to control the risks that occur in the workmanship of installing steel box girder. The method used in this research is the Hazard Identification Risk Assessment and Risk Control (HIRARC) method guided by the Malaysia HIRARC Guidelines (2008). Starting from identifying hazards at each stage of the work activity, a risk assessment is carried out, the results of which can be used as a reference for risk control, to reduce the risk of work accidents. The results of the analysis from the identification of hazards and risks arising in 5 stages of work and a total of 11 potential hazard findings were obtained. (1) Preparation stage for steel box girder erection maneuver; (2) The process of leveling/compacting the erection area soil for preparation of crawler crane footing/foundation; (3) The process of mobilizing steel box girder material from stockyard to erection area; (4) Installing slings + seals that will be used during steel box girder erection; (5) The process of installing steel box girder using crawler crane. The risk assessment results obtained a total of 11 potential hazard findings with details of 5 potential hazards with a percentage of risk value of 45.54% which is at a high level and 6 potential hazards with a percentage of risk value of 54.55% at a moderate level. The total number of risk level values is 132, with an average value of 12, meaning that the installation of steel box girder is at a moderate level. The results of risk control recommendations after obtaining the risk level value and analyzing the risk value, obtained 6 types of risk control in accordance with the risk control hierarchy, namely elimination, substitution, engineering control, warning system, administrative control, and personal protective equipment (PPE).
Title: RISK ANALYSIS WITH THE HIRARC METHOD ON INSTALLATION STEEL BOX GIDER CONSTRUCTION OF ALOHA FLYOVER SIDOARJO
Description:
Research on the Aloha flyover construction project aims to determine the risks that occur in the workmanship of installing steel box girder, knowing the level of risk that occurs in the workmanship of installing steel box girder and knowing how to control the risks that occur in the workmanship of installing steel box girder.
The method used in this research is the Hazard Identification Risk Assessment and Risk Control (HIRARC) method guided by the Malaysia HIRARC Guidelines (2008).
Starting from identifying hazards at each stage of the work activity, a risk assessment is carried out, the results of which can be used as a reference for risk control, to reduce the risk of work accidents.
The results of the analysis from the identification of hazards and risks arising in 5 stages of work and a total of 11 potential hazard findings were obtained.
(1) Preparation stage for steel box girder erection maneuver; (2) The process of leveling/compacting the erection area soil for preparation of crawler crane footing/foundation; (3) The process of mobilizing steel box girder material from stockyard to erection area; (4) Installing slings + seals that will be used during steel box girder erection; (5) The process of installing steel box girder using crawler crane.
The risk assessment results obtained a total of 11 potential hazard findings with details of 5 potential hazards with a percentage of risk value of 45.
54% which is at a high level and 6 potential hazards with a percentage of risk value of 54.
55% at a moderate level.
The total number of risk level values is 132, with an average value of 12, meaning that the installation of steel box girder is at a moderate level.
The results of risk control recommendations after obtaining the risk level value and analyzing the risk value, obtained 6 types of risk control in accordance with the risk control hierarchy, namely elimination, substitution, engineering control, warning system, administrative control, and personal protective equipment (PPE).

Related Results

ALOHA Protocols
ALOHA Protocols
Abstract ALOHA protocols deal with largely uncoordinated packet transmissions by multiple senders, where the senders all learn of success or collision via a common feedba...
Analisis Risiko Kecelakaan Kerja Pada Pemeliharaan Alat Container Crane dan Rubber Tyred Gantries
Analisis Risiko Kecelakaan Kerja Pada Pemeliharaan Alat Container Crane dan Rubber Tyred Gantries
Abstract: Occupational accidents in Indonesia continue to increase every year, requiring policies and actions that can reduce cases of occupational accidents. Risk management is on...
Analisis Penerapan Metode Hazard Identification Risk Assessment and Risk Control (HIRARC) di PT YZ
Analisis Penerapan Metode Hazard Identification Risk Assessment and Risk Control (HIRARC) di PT YZ
This study aims to analyze the implementation of the Hazard Identification Risk Assessment and Risk Control (HIRARC) method at PT. YZ, a manufacturing company engaged in cartons an...
Perancangan Sign System Kawasan Wisata Yussar Fishing and Playground Sidoarjo
Perancangan Sign System Kawasan Wisata Yussar Fishing and Playground Sidoarjo
Yussar Fishing and Playground Sidoarjo adalah wisata edukasi yang terletak di desa Kalidawir Kecamatan Tanggulangin Kabupaten Sidoarjo. Yussar Fishing and Playground Sidoarjo menye...
SS: Spar Technology- Developments in Deepwater spar installation
SS: Spar Technology- Developments in Deepwater spar installation
Abstract During the last seven years Heerema Marine Contractors (HMC) has installed more than half of all Spars in the deep waters of the Gulf of Mexico. The dual...
On the Limitations of Black-Box Constructions in Cryptography
On the Limitations of Black-Box Constructions in Cryptography
Cryptography is the science of secure communication. Originating as an esoteric discipline based on heuristics, it underwent a mayor paradigm shift in the past century. Modern cryp...
Kualitas Pelayanan dan Purchase Intention dengan Moderasi Band Advocate
Kualitas Pelayanan dan Purchase Intention dengan Moderasi Band Advocate
Abstract. This study aims to determine the effect of service quality on purchase intention with brand advocate as a moderating variable. This research is descriptive and verificati...
HIRARC System (Hazard and Risk Management System)
HIRARC System (Hazard and Risk Management System)
Dalam beberapa tahun kebelakangan ini, pengenalpastian bahaya, penilaian risiko dan kawalan risiko (HIRARC) telah menjadi asas kepada amalan perancangan, pengurusan dan operasi per...

Back to Top