Javascript must be enabled to continue!
Sawmill scheduling: an application-oriented model
View through CrossRef
Sawmills play a key role in the primary sector of the wood industry producing lumber from tree logs through a multi-stage process including inspections, classification, sawing, drying, etc. The sawing step can become a bottleneck due to the high investment costs the necessary equipment present. Thus, their schedule can be of significant economic importance, resulting in several studies over the years. While most of the approaches in the literature consider a simple model of production and focus on the stochastic nature of real-life problems, present work details a more in-depth model to better tackle practical considerations of less automated and smaller sawmills. The proposed Mixed-Integer Linear Programming model addresses volatile labour availability and differences between the two most dominant sawing technologies. The efficiency of the model is tested on randomly generated instances. The proposed approach can provide the optimal solution within reasonable time for short-term instances.
Title: Sawmill scheduling: an application-oriented model
Description:
Sawmills play a key role in the primary sector of the wood industry producing lumber from tree logs through a multi-stage process including inspections, classification, sawing, drying, etc.
The sawing step can become a bottleneck due to the high investment costs the necessary equipment present.
Thus, their schedule can be of significant economic importance, resulting in several studies over the years.
While most of the approaches in the literature consider a simple model of production and focus on the stochastic nature of real-life problems, present work details a more in-depth model to better tackle practical considerations of less automated and smaller sawmills.
The proposed Mixed-Integer Linear Programming model addresses volatile labour availability and differences between the two most dominant sawing technologies.
The efficiency of the model is tested on randomly generated instances.
The proposed approach can provide the optimal solution within reasonable time for short-term instances.
Related Results
From sawdust to safety: Examining knowledge and practices of respiratory protective measures among sawmill workers in South-Eastern Nigeria
From sawdust to safety: Examining knowledge and practices of respiratory protective measures among sawmill workers in South-Eastern Nigeria
The availability of timber products and the increase in demand for construction and export have made it a thriving business in Nigeria. . Chronic respiratory symptoms are common am...
Performance of Different Forest Plantation Sawmill Technologies in Uganda
Performance of Different Forest Plantation Sawmill Technologies in Uganda
Abstract
This study determined timber volume and timber value recovery of different plantation sawmill technologies. Data were collected from four sawmills in three forest ...
DPTM: An Adaptive Scheduler Design Utilizing Timeslot Matching and Release Methods for Concurrent and Multi-task Interleaved Pipelining-oriented CGRA
DPTM: An Adaptive Scheduler Design Utilizing Timeslot Matching and Release Methods for Concurrent and Multi-task Interleaved Pipelining-oriented CGRA
Coarse-grained reconfigurable architectures (CGRAs) are increasingly employed as domain-specific accelerators due to their efficiency and flexibility. However, the existing CGRA ar...
Visual versus Tabular Scheduling Programs
Visual versus Tabular Scheduling Programs
Effective scheduling in construction is crucial for ensuring timely project completion and maintaining budget control. Scheduling programs play an important role in this process by...
Study of occupational health hazards in sawmill workers in central India
Study of occupational health hazards in sawmill workers in central India
Background: Occupational lung diseases are occurring at an increasingly significant level in India and the prevalence is particularly high in sawmill workers. The present study eva...
Workflow Scheduling Based on Mobile Cloud Computing Machine Learning
Workflow Scheduling Based on Mobile Cloud Computing Machine Learning
In recent years, cloud workflow task scheduling has always been an important research topic in the business world. Cloud workflow task scheduling means that the workflow tasks subm...
Advanced Scheduling Schemes in 4G Systems
Advanced Scheduling Schemes in 4G Systems
The deterministic factor for 4G wireless technologies is to successfully deliver high value services such as voice, video, real-time data with well defined Quality of Service (QoS)...
Adaptive Scheduling of Mixing Trucks in Construction Sites with an Improved Deep Q-Network
Adaptive Scheduling of Mixing Trucks in Construction Sites with an Improved Deep Q-Network
The management of concrete mixing station distribution is evolving toward more intelligent and efficient methods. Additionally, in the context of the group operations of commodity ...

