Abstract
This paper describes the systematic approach towards nullifying the water production from the oilwell by setting an inflatable and pumping water shut off solution beneath. An onshore oil producing well in the United Arab Emirates was producing high water-cut impacting overall oil production and increasing water production and treatment requirements. The objective of the well is to improve oil production and reduce water production. Well data was reviewed systematically including completion limitations, deviation survey, sour conditions along with recently carried out production logging information. The production logs identified that the lowermost zone is producing most of the water and needed to be shut off.
The solution was designed with an inflatable retainer system having 2.125″ outer diameter and customized water shut off solution. The pressure differential capacity of this inflatable packer was evaluated using a software simulation and chemical water shut-off solution was designed within the limitation inflatable packer minimum differential capability. Proper lab testing of the Chemicals was carried out to finalize the setting time. The volume of chemical was finalized based on geological features and shut-off intervals. In summary a Coil tubing Conveyed solution was finalized after screening other possible bull head options.
The solution was implemented at the candidate well after overcoming the operational challenges, completion restrictions and resources limitations. The paper highlights the candidate evaluation, solution screening, lab testing, execution challenges and successful results. In summary the solution reduced more than 700 BWPD of water production that resulted in saving treatment cost, water handling capability limitation and power optimization in producing the well using ESP system. This rig less solution provided an economic alternative for avoiding unwanted water while enhancing oil production capacities that resulted in increasing well life and profitability.
This new approach of setting an inflatable cement retainer and pump the water shut off solution in rig less environment at wells having tubing restrictions provides an alternative solution that avoids the requirement of workover rigs and minimum timeframe to put back well on production.
Title: Rig Less Solution for Permanent Isolation of Unwanted Water Production Zone in an Oil Well to Sustain the Oil Production and Reduce the Water Production and Treatment Cost
Description:
Abstract
This paper describes the systematic approach towards nullifying the water production from the oilwell by setting an inflatable and pumping water shut off solution beneath.
An onshore oil producing well in the United Arab Emirates was producing high water-cut impacting overall oil production and increasing water production and treatment requirements.
The objective of the well is to improve oil production and reduce water production.
Well data was reviewed systematically including completion limitations, deviation survey, sour conditions along with recently carried out production logging information.
The production logs identified that the lowermost zone is producing most of the water and needed to be shut off.
The solution was designed with an inflatable retainer system having 2.
125″ outer diameter and customized water shut off solution.
The pressure differential capacity of this inflatable packer was evaluated using a software simulation and chemical water shut-off solution was designed within the limitation inflatable packer minimum differential capability.
Proper lab testing of the Chemicals was carried out to finalize the setting time.
The volume of chemical was finalized based on geological features and shut-off intervals.
In summary a Coil tubing Conveyed solution was finalized after screening other possible bull head options.
The solution was implemented at the candidate well after overcoming the operational challenges, completion restrictions and resources limitations.
The paper highlights the candidate evaluation, solution screening, lab testing, execution challenges and successful results.
In summary the solution reduced more than 700 BWPD of water production that resulted in saving treatment cost, water handling capability limitation and power optimization in producing the well using ESP system.
This rig less solution provided an economic alternative for avoiding unwanted water while enhancing oil production capacities that resulted in increasing well life and profitability.
This new approach of setting an inflatable cement retainer and pump the water shut off solution in rig less environment at wells having tubing restrictions provides an alternative solution that avoids the requirement of workover rigs and minimum timeframe to put back well on production.
Related Results
Potable Water Sources, Household Hygiene, and Sanitation Practices in Ikpoba Okha LGA, Edo State: Implications for Public Health and Sustainable Water Management
Omoregie, Andrew Edosa.1 Omoregie Abieyuwa Peace2 Okoro, Enyinnaya Okoro.3
1 College of Medi
Potable Water Sources, Household Hygiene, and Sanitation Practices in Ikpoba Okha LGA, Edo State: Implications for Public Health and Sustainable Water Management
Omoregie, Andrew Edosa.1 Omoregie Abieyuwa Peace2 Okoro, Enyinnaya Okoro.3
1 College of Medi
BACKGROUND
Access to potable drinking water and sufficient sanitation continues to be an urgent global concern, particularly in developing regions where con...
Modified Offshore Drilling Operation - Serban Well (Nunukan Block)
Modified Offshore Drilling Operation - Serban Well (Nunukan Block)
Abstract
Serban is an offshore drilling project located in Nunukan Block, Indonesia, approximately 3 km northwest of Bunyu Island, an offshore area with very shal...
Rig Inspection and Safety Relationship
Rig Inspection and Safety Relationship
Abstract
Preventing the occurrence of accidents in drilling and well servicing operations is a constant and major concern for any company or contractor acting in ...
Isolation And Characterization Of Biosurfactant Producing Bacteria From Different Environmental Soil Samples
Isolation And Characterization Of Biosurfactant Producing Bacteria From Different Environmental Soil Samples
Biosurfactants are natural substances produced by several bacterial and fungal organisms that are amphiphilic and are extracellular (a part of the cell membrane). Biosurfactants ca...
Rig Sizing: Revolutionizing Rig Sizing for Optimal Performance and Efficiency
Rig Sizing: Revolutionizing Rig Sizing for Optimal Performance and Efficiency
Abstract
Rig sizing is a critical process that ensures the appropriate rigs are selected for drilling oil or gas wells, balancing safety and cost-effectiveness. Prop...
HSE Rig Ranking Measuring What Matters
HSE Rig Ranking Measuring What Matters
Abstract
Measuring HSE performance is vital when dealing with the implementation and execution of multiple Drilling Contractor HSE programs to ensure expectations ar...
Well Intervention using MSV/DSV
Well Intervention using MSV/DSV
Abstract
Well intervention work through a rigid monobore riser from a dynamically positioned monohull vessel puts new challenges to the industry to ensure a safe ...
Project To Upright The Alexander L. Kielland
Project To Upright The Alexander L. Kielland
Abstract
The Alexander L Kielland is a drilling rig of Pentagone type. It was being used as an accommodation unit when it capsized in the North Sea in 1980 as a r...