Javascript must be enabled to continue!
The Achievement of Resource Optimisation on Lean Remote Wellhead Platform Visit with Collaborative 52 Weeks Plan
View through CrossRef
Abstract
To survive in oil and gas industry, Operating Expenditure (OPEX) must be well controlled for profit maximization. One of the most resource-utilizing activities in Zawtika offshore field is remote wellhead platform (WHP) visit which was previously bi-weekly for operations activities, maintenance activities such as preventive maintenance (PM), etc., inspection activities like flowline erosion monitoring and wells annulus pressure monitoring, thereby high Marine Gas Oil (MGO) consumption due to vessel trips/routes and increased in manpower utilization. Currently, Zawtika Offshore field has a main platform called Zawtika Processing and Living Quarter Platform (ZPQ) and 10 remote wellhead platforms (WHPs). When it is considered for future, there will be more remote wellhead platforms (WHPs) which will increase more OPEX for new phases.
To tackle this, this paper describes that Myanmar Asset Zawtika launched a LEAN (Lean Six Sigma) initiative based on safely and cost-effectively reducing the frequency of remote wellhead platforms (WHP) visits, using collaborative 52 week planning to lessen OPEX cost from MGO consumption and manpower requirements as well as maintaining Zawtika Reliability and Asset Integrity (RAI) with the view of achieving resource optimization. This paper also illustrates the effective planning process across multiple functions/disciplines within different sessions/departments and at various locations called 52 weeks plan incorporating with "Integrated Operation Plan (IOP)" guideline established for the first time for Zawtika offshore field to help optimize the resources and activities plan of individual field or asset by ensuring the safety while sustaining the integrity. This paper also outlines the reduction in Greenhouse Gas (GHG) calculated back from MGO reduction which is one of PTTEP strategies for Sustainable Development (SD).
Title: The Achievement of Resource Optimisation on Lean Remote Wellhead Platform Visit with Collaborative 52 Weeks Plan
Description:
Abstract
To survive in oil and gas industry, Operating Expenditure (OPEX) must be well controlled for profit maximization.
One of the most resource-utilizing activities in Zawtika offshore field is remote wellhead platform (WHP) visit which was previously bi-weekly for operations activities, maintenance activities such as preventive maintenance (PM), etc.
, inspection activities like flowline erosion monitoring and wells annulus pressure monitoring, thereby high Marine Gas Oil (MGO) consumption due to vessel trips/routes and increased in manpower utilization.
Currently, Zawtika Offshore field has a main platform called Zawtika Processing and Living Quarter Platform (ZPQ) and 10 remote wellhead platforms (WHPs).
When it is considered for future, there will be more remote wellhead platforms (WHPs) which will increase more OPEX for new phases.
To tackle this, this paper describes that Myanmar Asset Zawtika launched a LEAN (Lean Six Sigma) initiative based on safely and cost-effectively reducing the frequency of remote wellhead platforms (WHP) visits, using collaborative 52 week planning to lessen OPEX cost from MGO consumption and manpower requirements as well as maintaining Zawtika Reliability and Asset Integrity (RAI) with the view of achieving resource optimization.
This paper also illustrates the effective planning process across multiple functions/disciplines within different sessions/departments and at various locations called 52 weeks plan incorporating with "Integrated Operation Plan (IOP)" guideline established for the first time for Zawtika offshore field to help optimize the resources and activities plan of individual field or asset by ensuring the safety while sustaining the integrity.
This paper also outlines the reduction in Greenhouse Gas (GHG) calculated back from MGO reduction which is one of PTTEP strategies for Sustainable Development (SD).
Related Results
[RETRACTED] Ikaria Lean Belly Juice - How To Lose Stomach Fat? v1
[RETRACTED] Ikaria Lean Belly Juice - How To Lose Stomach Fat? v1
[RETRACTED]➢ Product Name — Ikaria Lean Belly Juice ➢ Category — Weight Loss ➢ Side-Effects — NA ➢ Benefits— Fat Burn and Weight Loss ➢ Availability — Online ➢ Rating — ⭐⭐⭐⭐⭐ ➢ Off...
[RETRACTED] Ikaria Lean Belly Juice - How To Lose Stomach Fat? v1
[RETRACTED] Ikaria Lean Belly Juice - How To Lose Stomach Fat? v1
[RETRACTED]➢ Product Name — Ikaria Lean Belly Juice ➢ Category — Weight Loss ➢ Side-Effects — NA ➢ Benefits— Fat Burn and Weight Loss ➢ Availability — Online ➢ Rating — ⭐⭐⭐⭐⭐ ➢ Off...
[RETRACTED] Keanu Reeves CBD Gummies v1
[RETRACTED] Keanu Reeves CBD Gummies v1
[RETRACTED]Keanu Reeves CBD Gummies ==❱❱ Huge Discounts:[HURRY UP ] Absolute Keanu Reeves CBD Gummies (Available)Order Online Only!! ❰❰= https://www.facebook.com/Keanu-Reeves-CBD-G...
Music as a framework to better understand Lean leadership
Music as a framework to better understand Lean leadership
PurposeThe purpose of this paper is to explain why most senior managers have great difficulty comprehending and correctly practising the Lean management system, thereby handicappin...
Key Learning Experience in Managing Prolific High Temperature Wells in Offshore Malaysia
Key Learning Experience in Managing Prolific High Temperature Wells in Offshore Malaysia
Abstract
Well integrity management for High Temperature (HT) wells can be challenging due to stresses and cyclic behaviour during thermal expansion or corrosive stre...
Mitigating Wellhead Fatigue While Reducing HSE Risk, Deck Spread, Deployment Time, and Crew Size
Mitigating Wellhead Fatigue While Reducing HSE Risk, Deck Spread, Deployment Time, and Crew Size
Abstract
Subsea wellhead systems have a design fatigue life that is expected to withstand the damage incurred from stress caused by cyclic loading during its operati...
Development of an Automatic Reentry Positioning System
Development of an Automatic Reentry Positioning System
ABSTRACT
This paper describes the concept, design, analysis and sea trials of the reentry system, and particularly its positioning system. Its development was con...
Book Review: Build Lean: Transforming construction using Lean Thinking by Adrian Terry & Stuart Smith
Book Review: Build Lean: Transforming construction using Lean Thinking by Adrian Terry & Stuart Smith
Presented as a narrative like Goldratt’s The Goal, Build Lean: Transforming Construction Using Lean Thinking2 traces the lean journey of one company led by Steve, a senior officer....

