MEMINIMASI PEMBOROSAN DENGAN LEAN MANUFACTURING PADA PROSES PRODUKSI DI PT. IE
View through CrossRef
PT. IE is engaged in the business of making Lighting and Lampposts. Based on observations and interviews, there are still some wastes that arise in the flow of the production process, among which there are still many wastes of waiting time, transportation, movement and inventory. These wastes cause the product completion time to be longer and the resulting quality decreases. To eliminate or reduce waste, it is necessary to apply Lean Manufacturing. Lean Manufacturing is a systematic approach to eliminating waste and changing processes by identifying and reducing waste with continuous improvement and striving to create a production flow along the value stream by eliminating all forms of waste and increasing the added value of products to customers. From the Pareto diagram, it is found that transportation waste has the highest percentage of 26.21%, waiting time is 21.38%, motion waste is 19.31% and waste inventories are 15.17%. while the results of the Value Stream Mapping Current State Map mapping obtained a production lead time of 7,680 seconds and a total cycle time of 6,660 seconds and a PCE Current State Map value of 53.09%. Identify the root causes of waste using Fishbone diagrams, 5 Why Analysis, 5W+1H, Fault Tree Analysis and FMEA. After corrective actions have been taken, based on the Value Stream Mapping Future mapping there is a decrease in production lead time to 5,220 seconds and a decrease in total cycle time to 4,860 seconds and an increase in PCE Future State Map to 68.10% so that there is an increase of 15.01% which shows The company's production process has become more Lean.PT. IE bergerak dalam bisnis pembuatan Lighting dan Tiang Lampu. Berdasarkan observasi dan wawancara, masih terdapat beberapa pemborosan (waste) yang timbul di aliran proses produksi di antaranya masih banyak terjadi pemborosan-pemborosan waktu tunggu, transportasi, gerakan dan inventori. Pemborosan-pemborosan tersebut menyebabkan waktu penyelesaian produk menjadi lebih lama dan kualitas yang dihasilkan menurun. Untuk menghilangkan atau mengurangi pemborosan diperlukan adanya penerapan Lean Manufacturing.Lean Manufacturing merupakan pendekatan sistematik untuk mengeliminasi pemborosan dan mengubah proses dengan cara mengidentifikasi dan mengurangi pemborosan dengan perbaikan kontinu dan berupaya untuk menciptakan aliran produksi sepanjang value stream dengan menghilangkan segala bentuk pemborosan serta meningkatkan nilai tambah produk kepada pelanggan. Dari diagram Pareto ditemukan waste transportasi memiliki persentase paling tinggi sebesar 26,21%, waktu tunggu 21,38%, waste motion 19,31% dan waste inventories 15,17%. sedangkan hasil pemetaan Value Stream Mapping Current State Map diperoleh production lead time selama 7.680 detik dan total cycle time selama 6.660 detik serta nilai PCE Current State Map sebesar 53,09%. Identifikasi akar permasalahan pemborosan menggunakan diagram Fishbone, 5 Why Analysis, 5W+1H, Fault Tree Analysis dan FMEA. Setelah dilakukan tindakan–tindakan perbaikan, berdasarkan pemetaan Value Stream Mapping Future ada penurunan production lead time menjadi 5.220 detik dan penurunan total cycle time menjadi 4.860 detik serta ada peningkatan PCE Future State Map menjadi 68,10% sehingga ada peningkatan 15,01% yang menunjukan proses produksi perusahaan telah menjadi lebih Lean.
Title: MEMINIMASI PEMBOROSAN DENGAN LEAN MANUFACTURING PADA PROSES PRODUKSI DI PT. IE
Description:
PT.
IE is engaged in the business of making Lighting and Lampposts.
Based on observations and interviews, there are still some wastes that arise in the flow of the production process, among which there are still many wastes of waiting time, transportation, movement and inventory.
These wastes cause the product completion time to be longer and the resulting quality decreases.
To eliminate or reduce waste, it is necessary to apply Lean Manufacturing.
Lean Manufacturing is a systematic approach to eliminating waste and changing processes by identifying and reducing waste with continuous improvement and striving to create a production flow along the value stream by eliminating all forms of waste and increasing the added value of products to customers.
From the Pareto diagram, it is found that transportation waste has the highest percentage of 26.
21%, waiting time is 21.
38%, motion waste is 19.
31% and waste inventories are 15.
17%.
while the results of the Value Stream Mapping Current State Map mapping obtained a production lead time of 7,680 seconds and a total cycle time of 6,660 seconds and a PCE Current State Map value of 53.
09%.
Identify the root causes of waste using Fishbone diagrams, 5 Why Analysis, 5W+1H, Fault Tree Analysis and FMEA.
After corrective actions have been taken, based on the Value Stream Mapping Future mapping there is a decrease in production lead time to 5,220 seconds and a decrease in total cycle time to 4,860 seconds and an increase in PCE Future State Map to 68.
10% so that there is an increase of 15.
01% which shows The company's production process has become more Lean.
PT.
IE bergerak dalam bisnis pembuatan Lighting dan Tiang Lampu.
Berdasarkan observasi dan wawancara, masih terdapat beberapa pemborosan (waste) yang timbul di aliran proses produksi di antaranya masih banyak terjadi pemborosan-pemborosan waktu tunggu, transportasi, gerakan dan inventori.
Pemborosan-pemborosan tersebut menyebabkan waktu penyelesaian produk menjadi lebih lama dan kualitas yang dihasilkan menurun.
Untuk menghilangkan atau mengurangi pemborosan diperlukan adanya penerapan Lean Manufacturing.
Lean Manufacturing merupakan pendekatan sistematik untuk mengeliminasi pemborosan dan mengubah proses dengan cara mengidentifikasi dan mengurangi pemborosan dengan perbaikan kontinu dan berupaya untuk menciptakan aliran produksi sepanjang value stream dengan menghilangkan segala bentuk pemborosan serta meningkatkan nilai tambah produk kepada pelanggan.
Dari diagram Pareto ditemukan waste transportasi memiliki persentase paling tinggi sebesar 26,21%, waktu tunggu 21,38%, waste motion 19,31% dan waste inventories 15,17%.
sedangkan hasil pemetaan Value Stream Mapping Current State Map diperoleh production lead time selama 7.
680 detik dan total cycle time selama 6.
660 detik serta nilai PCE Current State Map sebesar 53,09%.
Identifikasi akar permasalahan pemborosan menggunakan diagram Fishbone, 5 Why Analysis, 5W+1H, Fault Tree Analysis dan FMEA.
Setelah dilakukan tindakan–tindakan perbaikan, berdasarkan pemetaan Value Stream Mapping Future ada penurunan production lead time menjadi 5.
220 detik dan penurunan total cycle time menjadi 4.
860 detik serta ada peningkatan PCE Future State Map menjadi 68,10% sehingga ada peningkatan 15,01% yang menunjukan proses produksi perusahaan telah menjadi lebih Lean.
Related Results
[RETRACTED] Ikaria Lean Belly Juice - How To Lose Stomach Fat? v1
[RETRACTED] Ikaria Lean Belly Juice - How To Lose Stomach Fat? v1
[RETRACTED]➢ Product Name — Ikaria Lean Belly Juice ➢ Category — Weight Loss ➢ Side-Effects — NA ➢ Benefits— Fat Burn and Weight Loss ➢ Availability — Online ➢ Rating — ⭐⭐⭐⭐⭐ ➢ Off...
[RETRACTED] Ikaria Lean Belly Juice - How To Lose Stomach Fat? v1
[RETRACTED] Ikaria Lean Belly Juice - How To Lose Stomach Fat? v1
[RETRACTED]➢ Product Name — Ikaria Lean Belly Juice ➢ Category — Weight Loss ➢ Side-Effects — NA ➢ Benefits— Fat Burn and Weight Loss ➢ Availability — Online ➢ Rating — ⭐⭐⭐⭐⭐ ➢ Off...
Reduksi Pemborosan Menggunakan Pendekatan Lean Manufacturing pada Lantai Produksi Pembuatan Brake Hose
Reduksi Pemborosan Menggunakan Pendekatan Lean Manufacturing pada Lantai Produksi Pembuatan Brake Hose
Abstract. Waste that occurs on the production floor can hinder the production process and reduce company productivity. The purpose of this study was to identify and reduce waste th...
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
Analisis waktu standar produksi merupakan salah satu analisis metoda kuantitatif yang dilakukan untuk mengukur waktu produksi dan bertujuan agar dapat memiliki waktu standar sebaga...
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review Anna Tri Wahyuni1), Masfuri2), Liya Arista3)1,2,3 Fakultas Ilmu Keperawatan Univers...
Pendekatan Lean Manufakturing Dalam Pabrik Kelapa Sawit di Aceh Barat
Pendekatan Lean Manufakturing Dalam Pabrik Kelapa Sawit di Aceh Barat
Lean Manufacturing adalah cara berkelanjutan untuk mencapai keunggulan operasional pada proses produksi dan dapat diterapkan segala sector operasional di pabrik. Lean Manufacturing...
PEMBUATAN ASSESSMENT UNTUK IDENTIFIKASI DELAPAN PEMBOROSAN DI BIDANG INDUSTRI KONSTRUKSI
PEMBUATAN ASSESSMENT UNTUK IDENTIFIKASI DELAPAN PEMBOROSAN DI BIDANG INDUSTRI KONSTRUKSI
Industri konstruksi telah mendapat banyak kritikan karena performanya yang buruk, kondisi di Indonesia sendiri, pemborosan yang terjadi di perusahaan konstruksi adalah sekitar 57...
Reduksi Pemborosan (Waste) dengan Perbaikan Berkelanjutan menggunakan Pendekatan Lean-Kaizen pada Produksi Kain Carded
Reduksi Pemborosan (Waste) dengan Perbaikan Berkelanjutan menggunakan Pendekatan Lean-Kaizen pada Produksi Kain Carded
Abstract. PT Ayoe Indotama Textile (AYOETEX) is a textile company that processes yarn into fabric. Based on the results of observations, there are several activities that are suspe...