Javascript must be enabled to continue!
Structural design and simulation analysis of large permeable parking lot in sponge city based on SWMM
View through CrossRef
To improve the safety of urban underground parking lot and promote the construction of sponge city, a large parking lot structure of sponge city was designed based on rainstorm water management model (SWMM). A new permeable material paving method was designed for a parking lot in Handan City, and a low impact development (LID) parking lot model was constructed based on the SWMM. The simulation results showed that the runoff reduction effect of the permeable parking lot was significant. There was a delay of 3.36 minutes during the 30 minutes of rainfall period. During the 60 minutes rainfall period, there was a delay of 8.5 minutes. The lowest runoff reduction rate was 44% for a 100-year return period. The highest runoff reduction rate was 100% for 60 minutes rainfall duration and a 1-year return period. The lowest runoff reduction rate was 50% for a 100-year return period. The LID permeable parking lot had better runoff control effect, with a total runoff volume of 233 m3, a reduction rate of 83.5%, a peak flow rate of 0.152 m3/s, and a reduction rate of 73.4%. The LID parking lot model developed based on the SWMM has better drainage and water storage performance, making it more suitable for the construction of large permeable parking lots in sponge cities. The permeable parking lot structure studied effectively reduces the time of runoff effect of parking lot, improves the safety of underground parking lot during rainstorm, and promotes the construction and development of sponge city.
Title: Structural design and simulation analysis of large permeable parking lot in sponge city based on SWMM
Description:
To improve the safety of urban underground parking lot and promote the construction of sponge city, a large parking lot structure of sponge city was designed based on rainstorm water management model (SWMM).
A new permeable material paving method was designed for a parking lot in Handan City, and a low impact development (LID) parking lot model was constructed based on the SWMM.
The simulation results showed that the runoff reduction effect of the permeable parking lot was significant.
There was a delay of 3.
36 minutes during the 30 minutes of rainfall period.
During the 60 minutes rainfall period, there was a delay of 8.
5 minutes.
The lowest runoff reduction rate was 44% for a 100-year return period.
The highest runoff reduction rate was 100% for 60 minutes rainfall duration and a 1-year return period.
The lowest runoff reduction rate was 50% for a 100-year return period.
The LID permeable parking lot had better runoff control effect, with a total runoff volume of 233 m3, a reduction rate of 83.
5%, a peak flow rate of 0.
152 m3/s, and a reduction rate of 73.
4%.
The LID parking lot model developed based on the SWMM has better drainage and water storage performance, making it more suitable for the construction of large permeable parking lots in sponge cities.
The permeable parking lot structure studied effectively reduces the time of runoff effect of parking lot, improves the safety of underground parking lot during rainstorm, and promotes the construction and development of sponge city.
Related Results
Modelling regime shifts of coral reefs to sponge reefs
Modelling regime shifts of coral reefs to sponge reefs
<p>Coral reef ecosystems have been degrading globally for decades due to global climate change and anthropogenic pressure, and corals are expected to continue declining in th...
PERENCANAAN KEBUTUHAN AREAL PARKIR DI PASAR B LAWANG TIGO BALAI KECAMATAN MATUR KAB. AGAM
PERENCANAAN KEBUTUHAN AREAL PARKIR DI PASAR B LAWANG TIGO BALAI KECAMATAN MATUR KAB. AGAM
Parking is defined as an activity to put or store vehicles in a certain place whose duration depends on the completion of the needs of the driver, so a parking space is needed. Thi...
KARAKTERISTIK DAN BESARAN KEBUTUHAN RUANG PARKIR PENGEMBANGAN TOKO SEMERU DI MAKASSAR
KARAKTERISTIK DAN BESARAN KEBUTUHAN RUANG PARKIR PENGEMBANGAN TOKO SEMERU DI MAKASSAR
Abstract
The problem of parking in Makassar City is something that needs attention, because some commercial areas provide parking spaces that are not suitable for the capacity ...
Capacity Analysis of Vehicle Parking Area in "Terminal Petikemas Surabaya"
Capacity Analysis of Vehicle Parking Area in "Terminal Petikemas Surabaya"
Parking is one element of the means that cannot be separated from the overall road transportation system. Parking is a problem that is often found in urban transportation systems b...
Analisis Kebutuhan Parkir pada Gedung Pusat Informasi dan Perpustakaan serta Sekolah Pascasarjana Universitas Negeri Padang
Analisis Kebutuhan Parkir pada Gedung Pusat Informasi dan Perpustakaan serta Sekolah Pascasarjana Universitas Negeri Padang
The availability of adequate parking facilities is an important factor in supporting the smooth operation of activities within higher education institutions, particularly in areas ...
Heterogeneous Parking Market Subject to Parking Rationing
Heterogeneous Parking Market Subject to Parking Rationing
Different types of drivers and parking spaces delineate a heterogeneous parking market for which the literature has yet to provide a model applicable to the real world. The main ob...
Pelaksanaan Pemungutan Retribusi Parkir Di Kota Bajawa
Pelaksanaan Pemungutan Retribusi Parkir Di Kota Bajawa
This research aims to find out how the implementation of parking retribution in Bajawa City and the supporting and inhibiting factors of parking retribution implementation. This re...
Automatic Car Parking Management System
Automatic Car Parking Management System
One of the most important issue in the modern world is issue of car parking. Normally parking space is available in every society but the number of people who are having more than ...

