ANALYSIS METHOD OF GRADUAL CAST INSITU PROJECT COMPLETION OVERPASS PT. TALENTA BUMI MARABAHAN

View through CrossRef
Overpass project development Marabahan is a CSR (Corporate Social Responsibility) from PT. Talenta Bumi, namely making public care facilities for the security and facilitate road transport and to improve the welfare of society .This project Overpass consists of main bridge prestressed concrete girders with spans of 30 m and bridges using slab pile construction with a total length of 200 m. This study aims to determine the calculation method of the analysis of in situ casts gradually and to determine the method of implementation of the phased-situ cast on Marabahan Overpass project.Analysis of cast insitu method stages in the project completion Overpass PT. Marabahan Earth's talents will be obtained security calculations on the structure of the Overpass. Foundry work first is casting with cast in situ on the crown, after it's done casting method cast in situ stages at the slab to be divided into two stages, namely the first layer 20 cm (half slab) and the second layer 15 cm (top slab) using scaffolding as a scaffold and job formwork with main reinforcement ɸut 22-150 which gradually cast directly on the ground with the popularity chart Fc validation test cylinder '30 MPa and graphs coefficient of concrete strength PBI age 71. For loading on board, the work scaffolding (scaffolding) at the time of cast insitu gradually in the field wearing a scaffold with a heavy load capacity (heavy duty) has a maximum load of 675 kg/bay or 0.675 tons/m2, and using strong wooden scaffolding with wood class III based voltage PKKI 1961 timber permit.Based on the analysis results of calculations using the method of cast insitu gradually, by doing a test trial error with conditional on calculation of security moment of the plan should be greater than the moment of ultimate, then casting the first layer half slab in getting workable with the concrete less than one day the Fc '5 MPa and to stage a second layer using a comparison chart coefficient PBI age compressive strength, obtained Fc' 9.57 MPa to 1.5 days workmanship of the concrete casting. With the trial based on the test results of the concrete age, can accelerate and cut time jobs and can save the cost of the work, such as the cost of the use of formwork and scaffolding usage. suggestednecessary to test the concrete test cylinders for 1 day, 2 days, 3 days, etc,so that getting the maximum test.
Center for Journal Management and Publication, Lambung Mangkurat University
Title: ANALYSIS METHOD OF GRADUAL CAST INSITU PROJECT COMPLETION OVERPASS PT. TALENTA BUMI MARABAHAN
Description:
Overpass project development Marabahan is a CSR (Corporate Social Responsibility) from PT.
Talenta Bumi, namely making public care facilities for the security and facilitate road transport and to improve the welfare of society .
This project Overpass consists of main bridge prestressed concrete girders with spans of 30 m and bridges using slab pile construction with a total length of 200 m.
This study aims to determine the calculation method of the analysis of in situ casts gradually and to determine the method of implementation of the phased-situ cast on Marabahan Overpass project.
Analysis of cast insitu method stages in the project completion Overpass PT.
Marabahan Earth's talents will be obtained security calculations on the structure of the Overpass.
Foundry work first is casting with cast in situ on the crown, after it's done casting method cast in situ stages at the slab to be divided into two stages, namely the first layer 20 cm (half slab) and the second layer 15 cm (top slab) using scaffolding as a scaffold and job formwork with main reinforcement ɸut 22-150 which gradually cast directly on the ground with the popularity chart Fc validation test cylinder '30 MPa and graphs coefficient of concrete strength PBI age 71.
For loading on board, the work scaffolding (scaffolding) at the time of cast insitu gradually in the field wearing a scaffold with a heavy load capacity (heavy duty) has a maximum load of 675 kg/bay or 0.
675 tons/m2, and using strong wooden scaffolding with wood class III based voltage PKKI 1961 timber permit.
Based on the analysis results of calculations using the method of cast insitu gradually, by doing a test trial error with conditional on calculation of security moment of the plan should be greater than the moment of ultimate, then casting the first layer half slab in getting workable with the concrete less than one day the Fc '5 MPa and to stage a second layer using a comparison chart coefficient PBI age compressive strength, obtained Fc' 9.
57 MPa to 1.
5 days workmanship of the concrete casting.
With the trial based on the test results of the concrete age, can accelerate and cut time jobs and can save the cost of the work, such as the cost of the use of formwork and scaffolding usage.
suggestednecessary to test the concrete test cylinders for 1 day, 2 days, 3 days, etc,so that getting the maximum test.

Related Results

THE EFFECT OF CHARITY ACTIVITIES ON STREET ON TRAFFIC FLOW CHARACTERISTICS ON THE TRANS KALIMANTAN ROAD SECTION OF BARITO KUALA REGENCY
THE EFFECT OF CHARITY ACTIVITIES ON STREET ON TRAFFIC FLOW CHARACTERISTICS ON THE TRANS KALIMANTAN ROAD SECTION OF BARITO KUALA REGENCY
The location reviewed in this study is on Jalan Trans Kalimantan KM.12 Barito Kuala Regency precisely in front of the entrance direction of GIBS Junior High School, which is influe...
Unveiling the third dimension of glass
Unveiling the third dimension of glass
Glass as a material has always fascinated architects. Its inherent transparency has given us the ability to create diaphanous barriers between the interior and the exterior that al...
Analisis Strategi Pemasaran Dalam Usaha Meningkatkan Penjualan Anyaman Purun Pada Brand Usaha Anyaba Di Marabahan
Analisis Strategi Pemasaran Dalam Usaha Meningkatkan Penjualan Anyaman Purun Pada Brand Usaha Anyaba Di Marabahan
HUSNUL KHOTIMAH."Analysis of Marketing Strategy in an effort to increase sales of purun woven on the Anyaba business brand in Marabahan". Hairul Advisor, SE.M.M. and Nurul Hasanah,...
PROSES KEGIATAN PEMUATAN BATUBARA PADA PELABUHAN KHUSUS MILIK PT. TALENTA BUMI DI SUNGAI PUTING MARABAHAN BARITO KUALA
PROSES KEGIATAN PEMUATAN BATUBARA PADA PELABUHAN KHUSUS MILIK PT. TALENTA BUMI DI SUNGAI PUTING MARABAHAN BARITO KUALA
Sebagai langkah awal untuk memahami judul penelitian ini, dan untuk menghindari kesalahpahaman, penulis merasa perlu untuk menjelaskan beberapa kata yang menjadi judul penelitian i...
Prediction Project Task Completion Using Supervised Machine Learning Method: A Conceptual Approach
Prediction Project Task Completion Using Supervised Machine Learning Method: A Conceptual Approach
Project schedule forecasting is a core enabler of successful project management. Accurate schedule prediction leads to better resource management and ultimately, more value gained ...
Management of Distal 1/3rd Closed Forearm Fractures in Children above Elbow Plaster Cast versus Below Elbow Plaster Cast
Management of Distal 1/3rd Closed Forearm Fractures in Children above Elbow Plaster Cast versus Below Elbow Plaster Cast
Objective: To determine if below-elbow casts are as effective as above-elbow casts in the treatment of the distal third closed forearm fractures in children. Materials and Me...
Effect of Casting Material on the Cast Pressure After Sequential Cast Splitting
Effect of Casting Material on the Cast Pressure After Sequential Cast Splitting
Background: Circumferential casting is a vital component of nonoperative fracture management. These casts are commonly valved to release pressure and decrease the risk ...
PENGENALAN TINGKAT KERUSAKAN GEMPA BUMI PADA ANAK-ANAK BANJAR MANDALA SARI DENPASAR BALI
PENGENALAN TINGKAT KERUSAKAN GEMPA BUMI PADA ANAK-ANAK BANJAR MANDALA SARI DENPASAR BALI
Gempa bumi merupakan salah satu bencana alam yang bisa datang kapan saja dan dimana saja. Dampak yang diakibatkan diantaranya kematian, kerusakan fasilitas, serta kerugian lainnya....

Back to Top