Javascript must be enabled to continue!
Enhance Production by Infinite Conductivity Technique Applied in Tight Formations
View through CrossRef
Abstract
The infinite conductivity theory to enhance production was introduced to the industry around 1971. Exploration from the 1970s to the 1990s focused on high permeability formations. The unconventional reservoirs and tight formations were left behind until new technology could enable hydrocarbons to be produced in economical manner. Operators seek methods to both increase initial production and slow the decline rates. This paper describes the infinite conductivity technique to help to enhance production in unconventional reservoirs and tight formations.
The advanced pillar fracturing technology was evaluated as an infinite conductivity technique using binding agents to help generate stabilized proppant pillars to create voids and conduits inside the induced fractures during fracture stimulation treatments. The pillars remain stable at reservoir pressure and temperature to help to prevent excessive fracture closure during drawdown. The methodology uses specific surface equipment designed to establish pulsing of slurry and clean fluid segments during proppant placement. This methodology is combined with liquid resin technology to help to prevent proppant and fines migration, as well as reduce proppant embedment that would allow blockage of the conduit spaces. Consequently, the new technology reduces the necessary proppant volume pumped into the formation, thereby reducing the potential of proppant screenout.
Mechanical stress on the packed fractures is significantly greater during production when drawdown pressures are maximized and reservoir pressures begin to decline. These two pressures can lead to greater stresses on the proppant after closure. High closure stress also applies pressure to the proppant during production; consequently, the proppant has an increased tendency to crush. Proppant diagenesis is possible and can consequently contribute to reductions in conductivity. However, the application of liquid modified resin creates a film on the proppant surface, resulting in significant reductions in proppant reaction with the formation rock and fluid. This technique reduces diagenesis and helps to control fines generated from crushing that could plug the proppant pack and reduce conductivity. Modified liquid resin also increases pillar strength by creating a film on proppant grains. The application of different shear stresses enhances and stabilizes the strength of the pillar and keeps the newly created conduits open to flow. This paper presents a case history that shows that the production from a well stimulated without modified liquid resin declines significantly more than another well treated with resin-coated proppant. This paper presents a novel infinite conductivity technique that uses a pulsed proppant fracturing process to provide enhanced and sustained production over conventional treatments. The proppant pulsing process helps to create proppant pillars with open flow paths that are highly conductive and can enable almost infinite conductivity.
Title: Enhance Production by Infinite Conductivity Technique Applied in Tight Formations
Description:
Abstract
The infinite conductivity theory to enhance production was introduced to the industry around 1971.
Exploration from the 1970s to the 1990s focused on high permeability formations.
The unconventional reservoirs and tight formations were left behind until new technology could enable hydrocarbons to be produced in economical manner.
Operators seek methods to both increase initial production and slow the decline rates.
This paper describes the infinite conductivity technique to help to enhance production in unconventional reservoirs and tight formations.
The advanced pillar fracturing technology was evaluated as an infinite conductivity technique using binding agents to help generate stabilized proppant pillars to create voids and conduits inside the induced fractures during fracture stimulation treatments.
The pillars remain stable at reservoir pressure and temperature to help to prevent excessive fracture closure during drawdown.
The methodology uses specific surface equipment designed to establish pulsing of slurry and clean fluid segments during proppant placement.
This methodology is combined with liquid resin technology to help to prevent proppant and fines migration, as well as reduce proppant embedment that would allow blockage of the conduit spaces.
Consequently, the new technology reduces the necessary proppant volume pumped into the formation, thereby reducing the potential of proppant screenout.
Mechanical stress on the packed fractures is significantly greater during production when drawdown pressures are maximized and reservoir pressures begin to decline.
These two pressures can lead to greater stresses on the proppant after closure.
High closure stress also applies pressure to the proppant during production; consequently, the proppant has an increased tendency to crush.
Proppant diagenesis is possible and can consequently contribute to reductions in conductivity.
However, the application of liquid modified resin creates a film on the proppant surface, resulting in significant reductions in proppant reaction with the formation rock and fluid.
This technique reduces diagenesis and helps to control fines generated from crushing that could plug the proppant pack and reduce conductivity.
Modified liquid resin also increases pillar strength by creating a film on proppant grains.
The application of different shear stresses enhances and stabilizes the strength of the pillar and keeps the newly created conduits open to flow.
This paper presents a case history that shows that the production from a well stimulated without modified liquid resin declines significantly more than another well treated with resin-coated proppant.
This paper presents a novel infinite conductivity technique that uses a pulsed proppant fracturing process to provide enhanced and sustained production over conventional treatments.
The proppant pulsing process helps to create proppant pillars with open flow paths that are highly conductive and can enable almost infinite conductivity.
Related Results
Experimental Investigation on the Effects of Proppant Migration and Placement on the Conductivity in Rough Fractures
Experimental Investigation on the Effects of Proppant Migration and Placement on the Conductivity in Rough Fractures
ABSTRACT
Proppant conductivity was usually measured under static or designed proppant concentration. The ISO 13503-5 standard provides specific experimental proce...
A Method to Improve Computational Efficiency of Productivity Evaluation with Rectangular Coalbed Methane Reservoir
A Method to Improve Computational Efficiency of Productivity Evaluation with Rectangular Coalbed Methane Reservoir
Computational efficiency is the key factor to be considered in the productivity evaluation of rectangular coalbed methane reservoir. There are three main factors affecting the calc...
Limitation of EOR Applications in Tight Oil Formation
Limitation of EOR Applications in Tight Oil Formation
Abstract
Tight oil reservoirs have become one of the main forces of oil production growth in the USA. Only 3% to 7% of the oil can be recovered under primary depleti...
Scale-dependency Wettability of Tight Sandstone: Insights from an Eocene fluvial sandstone reservoir in the Bohai Bay Basin
Scale-dependency Wettability of Tight Sandstone: Insights from an Eocene fluvial sandstone reservoir in the Bohai Bay Basin
In the development of tight oil reservoirs, wettability determines the distribution and flow behavior of oil and water during reservoir development and enhanced oil recovery. Howev...
Analysis of the Influence of Micro-Pore Structure on Oil Occurrence Using Nano-CT Scanning and Nuclear Magnetic Resonance Technology: An Example from Chang 8 Tight Sandstone Reservoir, Jiyuan, Ordos Basin
Analysis of the Influence of Micro-Pore Structure on Oil Occurrence Using Nano-CT Scanning and Nuclear Magnetic Resonance Technology: An Example from Chang 8 Tight Sandstone Reservoir, Jiyuan, Ordos Basin
The micro-pore structure of a tight sandstone reservoir remarkably impacts the occurrence characteristics of the tight oil. The micro-pore structure of the Jiyuan Chang 8 tight san...
A Semianalytical Solution of a Vertical Fractured Well With Varying Conductivity Under Non-Darcy-Flow Condition
A Semianalytical Solution of a Vertical Fractured Well With Varying Conductivity Under Non-Darcy-Flow Condition
Summary
Fracture distributions (simple or complex fractures), fracture-conductivity heterogeneity (uniform or varying conductivity along the fracture), and flow regi...
Drilling and Production Optimization of Super and Ultra Heavy Oil in Block CH, Liaohe Oilfield
Drilling and Production Optimization of Super and Ultra Heavy Oil in Block CH, Liaohe Oilfield
Abstract
It is estimated that tight oil takes up 46% of the total reserve volume, including conventional tight oil, super-tight oil and ultra-tight oil whose viscosi...
The Fractures Optimization Method with the Threshold Pressure of Multistage Fracturing in Tight Oil Reservoir
The Fractures Optimization Method with the Threshold Pressure of Multistage Fracturing in Tight Oil Reservoir
Abstract
As permeability of tight oil reservoir is generally less than 0.1md, diameters of pore throats are primarily at the micrometer- and nanometer-scale. Differe...

