Javascript must be enabled to continue!
Proposed Office Facilities Layout in Low Voltage Electric Panel Manufacturer
View through CrossRef
<p>The electrical equipment industry in Indonesia is one of the factors that triggers economic growth. Labor productivity determines the success of project implementation. The non-optimal facility layout is one of the factors that triggers low labor productivity. The non-optimal facility layout affects the flow of information in the company. This study examines the problem of non-optimal office facility layout with TSP, ARC and ARD methods at PT. Duta Wijaya Elektrindo Engineering (PT. DWP). The method stated above can minimize the total distance traveled between office facilities so that work efficiency and workforce productivity may increase. The results of data processing indicate that the recommended office facility layout recommendations that are in accordance with the level of closeness between departments based on PST, ARC and ARD is the first recommendation. With reduced total distance traveled in the first layout of the proposed office facilities, the level of employee productivity and work efficiency will increase. The smallest total distance traveled on the proposed layout of the office facilities is 244.22 meters with a reduction of 36% from the initial conditions.</p>
Universitas Bunda Mulia
Title: Proposed Office Facilities Layout in Low Voltage Electric Panel Manufacturer
Description:
<p>The electrical equipment industry in Indonesia is one of the factors that triggers economic growth.
Labor productivity determines the success of project implementation.
The non-optimal facility layout is one of the factors that triggers low labor productivity.
The non-optimal facility layout affects the flow of information in the company.
This study examines the problem of non-optimal office facility layout with TSP, ARC and ARD methods at PT.
Duta Wijaya Elektrindo Engineering (PT.
DWP).
The method stated above can minimize the total distance traveled between office facilities so that work efficiency and workforce productivity may increase.
The results of data processing indicate that the recommended office facility layout recommendations that are in accordance with the level of closeness between departments based on PST, ARC and ARD is the first recommendation.
With reduced total distance traveled in the first layout of the proposed office facilities, the level of employee productivity and work efficiency will increase.
The smallest total distance traveled on the proposed layout of the office facilities is 244.
22 meters with a reduction of 36% from the initial conditions.
</p>.
Related Results
Potable Water Sources, Household Hygiene, and Sanitation Practices in Ikpoba Okha LGA, Edo State: Implications for Public Health and Sustainable Water Management
Omoregie, Andrew Edosa.1 Omoregie Abieyuwa Peace2 Okoro, Enyinnaya Okoro.3
1 College of Medi
Potable Water Sources, Household Hygiene, and Sanitation Practices in Ikpoba Okha LGA, Edo State: Implications for Public Health and Sustainable Water Management
Omoregie, Andrew Edosa.1 Omoregie Abieyuwa Peace2 Okoro, Enyinnaya Okoro.3
1 College of Medi
BACKGROUND
Access to potable drinking water and sufficient sanitation continues to be an urgent global concern, particularly in developing regions where con...
Analisis Tata Letak Fasilitas Pabrik Pengolahan Kopi Menggunakan Systematic Layout Planning
Analisis Tata Letak Fasilitas Pabrik Pengolahan Kopi Menggunakan Systematic Layout Planning
Abstrak. Penelitian ini bertujuan menganalisis tata letak fasilitas pabrik kopimenggunakan Systematic Layout Planning (SLP). Penelitian dilakukan pada pabrik pengolahan kopi arabik...
Perancangan Tata Letak Fasilitas Metode CRAFT (Computerized Relative Allocation Facility Technique)
Perancangan Tata Letak Fasilitas Metode CRAFT (Computerized Relative Allocation Facility Technique)
Abstract. The layout of production facilities is a crucial factor in supporting the smooth operation of manufacturing processes. CV. XYZ faces issues related to inefficient facilit...
Modelado de un Recuperador Dinámico de Tensión para el Mejoramiento de la Calidad de la Onda de Tensión
Modelado de un Recuperador Dinámico de Tensión para el Mejoramiento de la Calidad de la Onda de Tensión
[1] R. C. Dugan, H. W. Beaty, y S. Santoso, Electrical Power Systems Quality, Third edition. Tata McGraw Hill Education, 2012.[2] J. Arrilaga y N. R. Watson, Powe...
Optimalisasi Tata Letak : Strategi Untuk Meningkatkan Kepuasan Pelanggan
Optimalisasi Tata Letak : Strategi Untuk Meningkatkan Kepuasan Pelanggan
This research conducted aims to explore the important aspects of office layout in a motorcycle dealer company which includes the objectives: (1) Identifying effective office layout...
Tata Ruang Kantor : Kunci Efektivitas Kerja Pegawai Dapensos Bandung, Jawa Barat
Tata Ruang Kantor : Kunci Efektivitas Kerja Pegawai Dapensos Bandung, Jawa Barat
The effectiveness of employee performance in an organization is greatly influenced by various factors, including office layout. This research aims to analyze the influence of offic...
Assessing energy rating premiums in the performance of green office buildings in Australia
Assessing energy rating premiums in the performance of green office buildings in Australia
Purpose– Green office buildings have recently taken on increased significance in institutional property portfolios in Australia and globally. The key issue from an institutional in...
Study on the reliability of new kind of ±1 100 Kv DC voltage divider under the action of impulse voltage
Study on the reliability of new kind of ±1 100 Kv DC voltage divider under the action of impulse voltage
To meet the special insulation demand of the DC transmission system with the highest voltage in the world, a new kind of ±1 100 kV DC voltage divider is designed. The reliability o...

