Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

ANALISIS PENGARUH MASA OPERASIONAL TERHADAP PENURUNAN KAPASITAS TRANSFORMATOR DISTRIBUSI DI PT PLN (PERSERO)

View through CrossRef
One cause the interruption of transformer is loading that exceeds the capabilities of the transformer. The state of continuous overload will affect the age of the transformer and result in a reduced capacity of the transformer. The declining capacity, loading on the transformer will not be maximized and increase the risk of damage. Actions taken to attempt the decrease disturbances resulting from the transformer loadings are by the transformer test and known how many percent decrease in capacity of the transformer. The data from the test is used to calculate the reduction in the capacity of the transformer. Result of the research on the transformer which is not operated yet relating to the ideal state of a transformer. As for the research on the second transformer indicates how transformer which been operating for several years has decreased the capacity of the transformer. So that the second transformer can not be loaded to the maximum.
Title: ANALISIS PENGARUH MASA OPERASIONAL TERHADAP PENURUNAN KAPASITAS TRANSFORMATOR DISTRIBUSI DI PT PLN (PERSERO)
Description:
One cause the interruption of transformer is loading that exceeds the capabilities of the transformer.
The state of continuous overload will affect the age of the transformer and result in a reduced capacity of the transformer.
The declining capacity, loading on the transformer will not be maximized and increase the risk of damage.
Actions taken to attempt the decrease disturbances resulting from the transformer loadings are by the transformer test and known how many percent decrease in capacity of the transformer.
The data from the test is used to calculate the reduction in the capacity of the transformer.
Result of the research on the transformer which is not operated yet relating to the ideal state of a transformer.
As for the research on the second transformer indicates how transformer which been operating for several years has decreased the capacity of the transformer.
So that the second transformer can not be loaded to the maximum.

Related Results

STUDI PENGARUH PELUAHAN PARSIAL TERHADAP PENUAAN KUALITAS MINYAK TRANSFORMATOR
STUDI PENGARUH PELUAHAN PARSIAL TERHADAP PENUAAN KUALITAS MINYAK TRANSFORMATOR
Transformator merupakan peralatan yang vital dalam sistem tenaga listrik. Apabila terjadi kerusakan pada transformator dapat menyebabkan pen yaluran listrik ke konsumen dapat terga...
Pengaruh Ketidakseimbangan Beban Terhadap Losses dan Pembebanan Transformator Distribusi
Pengaruh Ketidakseimbangan Beban Terhadap Losses dan Pembebanan Transformator Distribusi
Wilayah kerja PT. PLN (Persero) Wilayah Suluttenggo Cabang Gorontalo dapat di katakan memiliki area suplay listrik yang cukup luas. Pada umumnya rumah tangga, industry, perkantoran...
PENGARUH PELATIHAN TERHADAP KINERJA KARYAWAN PT. DAHANA (PERSERO) SUBANG
PENGARUH PELATIHAN TERHADAP KINERJA KARYAWAN PT. DAHANA (PERSERO) SUBANG
Karyawan sebagai aset perusahaan dengan peranannya yang sangat menentukan berhasil tidaknya perusahaan dalam mencapai tujuannya. Dalam memperoleh karyawan yang berkinerja baik peru...
Analisa Kapasitas Penampang Sungai dengan Metode HEC-RAS 4.1.0 (Studi Kasus Sungai Sigeleng Kec. Brebes)
Analisa Kapasitas Penampang Sungai dengan Metode HEC-RAS 4.1.0 (Studi Kasus Sungai Sigeleng Kec. Brebes)
Tujuan penelitian ini adalah untuk mengetahui kapasitas penampang sungai Sigeleng Kec. Brebes. berdasarkan analisis hidrologi dan hidrolika menggunakan program HEC-RAS 4.1.0. Perhi...
Analisis Efektivitas Kerja Karyawan Divisi Yan HC PT. PLN (Persero)
Analisis Efektivitas Kerja Karyawan Divisi Yan HC PT. PLN (Persero)
Purpose – This study aims to determine whether the performance of Yan HC division employees at PT. PLN (Persero) has been effective. Methodology – The method used is observation, d...

Back to Top