Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Maximize Efficiency of Coiled Tubing-Conveyed Perforation with Advanced Gun Deployment System and Real-Time Correlation in High-H2S/High-Pressure Wells

View through CrossRef
Abstract Well completion and commissioning operations offshore present a variety of technical and operational challenges in the quest to maximize well productivity and optimize the economic value together with focus on safety. This is very relevant to the perforation operations performed in hostile and high-pressure reservoir conditions encountered in a complex development project in the Caspian basin. We provide description of the project and the innovative solution applied, including challenges faced, experience gained, and lessons learned. To overcome challenges, we selected electric-line-enabled (e-line-enabled) coiled tubing (CT) for precise depth control, and the latest advanced gun deployment system for conveyance of long gun strings under pressure. Innovative solutions implemented throughout the project included the perforation-shock-resistant bottomhole assembly (BHA), two independent emergency disconnects, and tuned software to predict and evaluate shock load and dynamic underbalance. Some of the unique technical solutions were designed specifically for this project: high-pressure and H2S-rated connectors; specialized tool deployment stack; 15,000-psi working pressure 5.12-in. ID H2S-rated rounded scallop guns; shock-resistant electrical disconnect; and high-tensile CT logging head disconnect weak points. To date, more than 10 well commissioning operations were successfully completed with this innovative method—e-line-enabled CT perforation under high pressure. This perforation technique proved to effectively minimize operational time, associated risks, improper equipment use, and footprint on location. Such approach allowed safe and efficient perforation in a controlled well environment that resulted in accurate depth control and managed detonation shock load and overbalanced conditions, which avoided any well fluid influx or H2S release. The developed solution required seamless integration of innovative techniques and hardware, including e-line enabled CT, the CT logging head, the gun deployment system for pressurized well conditions, wireline tools and specialized perforation equipment. The design was optimized to perforate the well in three or four runs at overbalanced condition (squeeze mode) in a single rig-up job instead of more than 20 wireline runs. Additionally, the use of CT granted flexibility and increased operational safety to perform pumping operations for well displacement and well control, injection of H2S scavenger, and stimulation, as per Operator's plan, without or with only partial rig-down. This is the first time that the described CT perforation operation using such techniques has been performed in the Caspian region. The experience demonstrates a method to safely and efficiently facilitate perforation jobs under challenging conditions in the future.
Title: Maximize Efficiency of Coiled Tubing-Conveyed Perforation with Advanced Gun Deployment System and Real-Time Correlation in High-H2S/High-Pressure Wells
Description:
Abstract Well completion and commissioning operations offshore present a variety of technical and operational challenges in the quest to maximize well productivity and optimize the economic value together with focus on safety.
This is very relevant to the perforation operations performed in hostile and high-pressure reservoir conditions encountered in a complex development project in the Caspian basin.
We provide description of the project and the innovative solution applied, including challenges faced, experience gained, and lessons learned.
To overcome challenges, we selected electric-line-enabled (e-line-enabled) coiled tubing (CT) for precise depth control, and the latest advanced gun deployment system for conveyance of long gun strings under pressure.
Innovative solutions implemented throughout the project included the perforation-shock-resistant bottomhole assembly (BHA), two independent emergency disconnects, and tuned software to predict and evaluate shock load and dynamic underbalance.
Some of the unique technical solutions were designed specifically for this project: high-pressure and H2S-rated connectors; specialized tool deployment stack; 15,000-psi working pressure 5.
12-in.
ID H2S-rated rounded scallop guns; shock-resistant electrical disconnect; and high-tensile CT logging head disconnect weak points.
To date, more than 10 well commissioning operations were successfully completed with this innovative method—e-line-enabled CT perforation under high pressure.
This perforation technique proved to effectively minimize operational time, associated risks, improper equipment use, and footprint on location.
Such approach allowed safe and efficient perforation in a controlled well environment that resulted in accurate depth control and managed detonation shock load and overbalanced conditions, which avoided any well fluid influx or H2S release.
The developed solution required seamless integration of innovative techniques and hardware, including e-line enabled CT, the CT logging head, the gun deployment system for pressurized well conditions, wireline tools and specialized perforation equipment.
The design was optimized to perforate the well in three or four runs at overbalanced condition (squeeze mode) in a single rig-up job instead of more than 20 wireline runs.
Additionally, the use of CT granted flexibility and increased operational safety to perform pumping operations for well displacement and well control, injection of H2S scavenger, and stimulation, as per Operator's plan, without or with only partial rig-down.
This is the first time that the described CT perforation operation using such techniques has been performed in the Caspian region.
The experience demonstrates a method to safely and efficiently facilitate perforation jobs under challenging conditions in the future.

Related Results

Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Abstract This paper provides in-depth analysis of a low-cost solution to economically sustain production and avoid high workover costs. This paper conducts the techn...
Prebending Coiled Tubing and Its Fatigue Life Prediction
Prebending Coiled Tubing and Its Fatigue Life Prediction
Coiled tubing is widely used in oil drilling and production operations. However, extreme high stress variation of coiled tubing during the processes of pulling out, rolling in the ...
Alternative Chemistries for H2S Scavenging – Total Feedback
Alternative Chemistries for H2S Scavenging – Total Feedback
Abstract Hydrogen sulphide (H2S) is naturally occurring in many oil and gas production streams. H2S scavengers are used as additives to reduce the concentration of H...
New Age of Coiled Tubing CT Oriented Perforation—World First Application for Intelligent Completion in Hostile High-H2S Well
New Age of Coiled Tubing CT Oriented Perforation—World First Application for Intelligent Completion in Hostile High-H2S Well
Abstract Well completion and commissioning operations offshore present a variety of technical and operational challenges in the quest to maximize well productivity a...
Innovative Coiled Tubing Technology to Improve Performance in Horizontal Completions
Innovative Coiled Tubing Technology to Improve Performance in Horizontal Completions
Abstract Recent technological innovations in seismic imaging, directional drilling and hydraulic fracturing and other completion techniques have made development of ...
Jointed Tubing Injector Snubbing on Extended Reach Wells
Jointed Tubing Injector Snubbing on Extended Reach Wells
Abstract OBJECTIVE / SCOPE An injector has been developed that is able to continuously move conventional jointed tubing in and o...
Coiled Tubing Cementing Operation Using MPD Technique in a HP/HT Well
Coiled Tubing Cementing Operation Using MPD Technique in a HP/HT Well
Abstract In the continual search for Oil and Gas, more and more exploration wells are being drilled in High Pressure-High Temperature (HPHT) environments. Pore and F...
Coiled Tubing Working Life Prediction
Coiled Tubing Working Life Prediction
ABSTRACT Failure of coiled tubing, due to the repeated bending and plastic deformation of coiled tubing on and off the reel and gooseneck, is of great concern in coi...

Back to Top