Tubing Conveyed Perforation in a Highly Sour High Pressure Horizontal Well in Sultanate of Oman
View through CrossRef
Abstract
The Yibal Khuff field is located in the North of Sultanate of Oman and is renowned to be part of the second largest and most technically complex project in Petroleum Development Oman's history. The target oil and gas wells are Highly Sour with High Pressures and Temperatures. This paper describes successful Tubing-Conveyed Perforation (TCP) in horizontal wells using Coiled Tubing, where over 100 m of additional reservoir was perforated boosting the production of wells existing perforations.
The coiled tubing attended the horizontal live well at highly sour and HPHT downhole conditions with a suspended height above 25 m. The approach was to manage the downhole environment prior to proceeding with the Tubing-Conveyed Perforation by controlling the bottomhole pressure. Once the downhole environment was addressed and controlled, the depth correlation took place using Memory CCL-GR to locate the required target zones. The main operation consisted of 10 repeated perforation runs at a gun length of 12m per run to accumulate a total of120m of perforation interval.
The well provided a combined challenge of highly sour environment, existing open perforations, high surface and high bottomhole pressures. Following a thorough analysis and selection criteria where multiple conveyance methods were considered and evaluated such as Eline Tractors, Tubing Conveyance with Rig/Hoist, E-Coil and Conventional Coil Tubing via Sand Jetting and deployment means, the selected method of intervention was Tubing Conveyed Perforation via Coiled Tubing. A combined approach of utilizing controlled intervention techniques enabled the increased production access to the hydrocarbon reserves. In addition to the inherent safety precautions, the project maintained quality assurance as another main driver resulting in flawless delivery of the project.
This solution provides an effective method of tackling perforating challenges in highly sour environments, where coiled tubing conveyed perforation was executed for the first time at a suspended height in a live horizontal well with open perforations. The bottomhole pressure was 4,600 psi and H2S above 3%. TCP via Coiled Tubing has proved to be a high production gain concept, where replication will be beneficial not only to Petroleum Development Oman but to the industry as a whole.
Title: Tubing Conveyed Perforation in a Highly Sour High Pressure Horizontal Well in Sultanate of Oman
Description:
Abstract
The Yibal Khuff field is located in the North of Sultanate of Oman and is renowned to be part of the second largest and most technically complex project in Petroleum Development Oman's history.
The target oil and gas wells are Highly Sour with High Pressures and Temperatures.
This paper describes successful Tubing-Conveyed Perforation (TCP) in horizontal wells using Coiled Tubing, where over 100 m of additional reservoir was perforated boosting the production of wells existing perforations.
The coiled tubing attended the horizontal live well at highly sour and HPHT downhole conditions with a suspended height above 25 m.
The approach was to manage the downhole environment prior to proceeding with the Tubing-Conveyed Perforation by controlling the bottomhole pressure.
Once the downhole environment was addressed and controlled, the depth correlation took place using Memory CCL-GR to locate the required target zones.
The main operation consisted of 10 repeated perforation runs at a gun length of 12m per run to accumulate a total of120m of perforation interval.
The well provided a combined challenge of highly sour environment, existing open perforations, high surface and high bottomhole pressures.
Following a thorough analysis and selection criteria where multiple conveyance methods were considered and evaluated such as Eline Tractors, Tubing Conveyance with Rig/Hoist, E-Coil and Conventional Coil Tubing via Sand Jetting and deployment means, the selected method of intervention was Tubing Conveyed Perforation via Coiled Tubing.
A combined approach of utilizing controlled intervention techniques enabled the increased production access to the hydrocarbon reserves.
In addition to the inherent safety precautions, the project maintained quality assurance as another main driver resulting in flawless delivery of the project.
This solution provides an effective method of tackling perforating challenges in highly sour environments, where coiled tubing conveyed perforation was executed for the first time at a suspended height in a live horizontal well with open perforations.
The bottomhole pressure was 4,600 psi and H2S above 3%.
TCP via Coiled Tubing has proved to be a high production gain concept, where replication will be beneficial not only to Petroleum Development Oman but to the industry as a whole.
Related Results
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Rigless Well Intervention Using Tubing Patch Technology Helps Restore Inactive Wells
Abstract
This paper provides in-depth analysis of a low-cost solution to economically sustain production and avoid high workover costs. This paper conducts the techn...
Sour Serviceability of Higher-Strength Coiled Tubing: Final Results
Sour Serviceability of Higher-Strength Coiled Tubing: Final Results
Abstract
As earlier as 1999, the need for industry guidelines regarding the use of coiled tubing (CT) in sour wells was recognized2. Small scale standard NACE tests ...
High-Strength Coiled Tubing can be Used Successfully in Sour Environments if Properly Managed
High-Strength Coiled Tubing can be Used Successfully in Sour Environments if Properly Managed
Abstract
High-strength coiled tubing (CT) was subjected to sulfide stress cracking (SSC) testing for the purpose of defining acceptable operating zones in sour envir...
Jointed Tubing Injector Snubbing on Extended Reach Wells
Jointed Tubing Injector Snubbing on Extended Reach Wells
Abstract
OBJECTIVE / SCOPE
An injector has been developed that is able to continuously move conventional jointed tubing in and o...
Effects of Buckled Tubing on Coiled Tubing Passibility
Effects of Buckled Tubing on Coiled Tubing Passibility
Abstract
Many coiled tubing(CT) operations involve passage through the production tubing. However, due to the adverse wellbore trajectory or tubing geometries, espec...
Challenging Well with Sand Production Risk is Economically Developed Using Oriented Perforation
Challenging Well with Sand Production Risk is Economically Developed Using Oriented Perforation
Abstract
The subject field is located south of Ras Shukier area in the Gulf of Suez offshore the northeastern part of Egypt. The field produces from LR Formation whi...
New Age of Coiled Tubing CT Oriented Perforation—World First Application for Intelligent Completion in Hostile High-H2S Well
New Age of Coiled Tubing CT Oriented Perforation—World First Application for Intelligent Completion in Hostile High-H2S Well
Abstract
Well completion and commissioning operations offshore present a variety of technical and operational challenges in the quest to maximize well productivity a...
Intervention in Wells with Buckled Production Tubing
Intervention in Wells with Buckled Production Tubing
Abstract
Sometimes the production tubing in a well can be helically buckled due to problems with the completion design, completion hardware, or installation probl...