Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Analisis Perencanaan Produksi Paving Dengan Menggunakan Metode Campbell Dudek Smith Dan Palmer Di CV. Daya Patra Sentosa

View through CrossRef
CV. Daya Patra Sentosa is a company that produces paving. Of the several types of products available, T6 paving, T8 paving, and hexagon paving are the types of products with the most demand. CV. Daya Patra Sentosa has problems in production scheduling, namely there are frequent delays in product delivery because they do not yet have an optimal production scheduling system and still use FCFS rules. The purpose of this study is to provide alternative production scheduling suggestions in order to obtain optimal production processing time and prevent delays in product delivery. These problems are solved by the method of Campbell Dudek Smith and Palmer. These two methods are compared to find out the production process time and get the optimal choice of production time. The calculation results show that the application of the method applied by the company, namely FCFS is 12342.9 minutes, the Campbell Dudek Smith method is 11953.9 minutes, and the Palmer method is 12023 minutes. It can be seen that the Campbell-Dudek-Smith method provides a shorter time of 389 minutes (3.15%) to the company's schedule.
Title: Analisis Perencanaan Produksi Paving Dengan Menggunakan Metode Campbell Dudek Smith Dan Palmer Di CV. Daya Patra Sentosa
Description:
CV.
Daya Patra Sentosa is a company that produces paving.
Of the several types of products available, T6 paving, T8 paving, and hexagon paving are the types of products with the most demand.
CV.
Daya Patra Sentosa has problems in production scheduling, namely there are frequent delays in product delivery because they do not yet have an optimal production scheduling system and still use FCFS rules.
The purpose of this study is to provide alternative production scheduling suggestions in order to obtain optimal production processing time and prevent delays in product delivery.
These problems are solved by the method of Campbell Dudek Smith and Palmer.
These two methods are compared to find out the production process time and get the optimal choice of production time.
The calculation results show that the application of the method applied by the company, namely FCFS is 12342.
9 minutes, the Campbell Dudek Smith method is 11953.
9 minutes, and the Palmer method is 12023 minutes.
It can be seen that the Campbell-Dudek-Smith method provides a shorter time of 389 minutes (3.
15%) to the company's schedule.

Related Results

FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature  Review Anna Tri Wahyuni1), Masfuri2),  Liya Arista3)1,2,3 Fakultas Ilmu Keperawatan Univers...
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
MENENTUKAN WAKTU STANDAR PADA AKTIVITAS KERJA PRODUKSI SABLON MANUAL DI CV. DWIPUTRA IHWA
Analisis waktu standar produksi merupakan salah satu analisis metoda kuantitatif yang dilakukan untuk mengukur waktu produksi dan bertujuan agar dapat memiliki waktu standar sebaga...
Plasma AR Alterations and Timing of Intensified Hormone Treatment for Prostate Cancer
Plasma AR Alterations and Timing of Intensified Hormone Treatment for Prostate Cancer
This randomized clinical trial explores whether hormone intensification at start of androgen deprivation therapy alters selection of androgen receptor (AR) gene alterations within ...
Paving Blocks Made from Plastic Waste: Environmental Solutions & Business Potential
Paving Blocks Made from Plastic Waste: Environmental Solutions & Business Potential
The research in this thesis aims to find out the process of developing plastic waste products into paving blocks, to find out the business prospects of paving blocks from plastic w...
KECEMASAN SAAT PANDEMI COVID 19: LITERATUR REVIEW Hardiyati, Efri Widianti, Taty Hernawaty Departemen Keperawatan Jiwa Poltekkes Kemenkes Mamuju Sulbar, Universitas Pad...
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAFTAR PUSTAKAAditama, M. H. R., & Selfiardy, S. (2022). Kehidupan Mahasiswa Kuliah Sambil Bekerja di Masa Pandemi Covid-19. Kidspedia: Jurnal Pendidikan Anak Usia Dini, 3(...
Pengukuran Produktivits Sapi Perah Menggunakan Test Interval
Pengukuran Produktivits Sapi Perah Menggunakan Test Interval
ABSTRAKMutu genetik ternak tidak tampak dari luar, yang tampak dan dapat diukur adalah performan atau produksinya oleh karena itu catatat produksi diperlukan sebagai media untuk me...

Back to Top