Javascript must be enabled to continue!
Incomplete Cross-Bonding in the MV Line. Experience from the Operation of MV Single Cable Lines
View through CrossRef
Cable lines are one of the basic components of power systems. Medium and high voltage cables mainly comprise a metallic sheath, which is concentric to the main core conductor. There are several operating schemes of such cable lines, which differ in the place of earthing of sheaths and the possible use of the sheaths and/or conductors crossing. The sheaths cross-bonding is typically done in two places of one cable line section, and it allows to reduce power losses. Nevertheless, the use of incomplete sheaths crossing—only in one place on cable route may have economic justification. The paper presents an incomplete sheaths cross-bonding analysis of an existing medium voltage cable line. The results obtained by the mathematical model are validated by measurements taken on 30 October 2019 on an existing cable line. Measurements recorded on a real object for various systems of crossing sheaths are presented. The influence of incorrect sheaths crossing on the measured quantities was shown. In addition, the risk of excess voltage on the sheaths during short-circuits has been verified using a mathematical model.
Title: Incomplete Cross-Bonding in the MV Line. Experience from the Operation of MV Single Cable Lines
Description:
Cable lines are one of the basic components of power systems.
Medium and high voltage cables mainly comprise a metallic sheath, which is concentric to the main core conductor.
There are several operating schemes of such cable lines, which differ in the place of earthing of sheaths and the possible use of the sheaths and/or conductors crossing.
The sheaths cross-bonding is typically done in two places of one cable line section, and it allows to reduce power losses.
Nevertheless, the use of incomplete sheaths crossing—only in one place on cable route may have economic justification.
The paper presents an incomplete sheaths cross-bonding analysis of an existing medium voltage cable line.
The results obtained by the mathematical model are validated by measurements taken on 30 October 2019 on an existing cable line.
Measurements recorded on a real object for various systems of crossing sheaths are presented.
The influence of incorrect sheaths crossing on the measured quantities was shown.
In addition, the risk of excess voltage on the sheaths during short-circuits has been verified using a mathematical model.
Related Results
At Sea Test: Hawaii Deepwater Cable Program
At Sea Test: Hawaii Deepwater Cable Program
ABSTRACT
In order to investigate and demonstrate the technical feasibility of laying a Submarine power cable in the open ocean, in depths exceeding 6000 feet, ove...
ANALYSIS ON THREE-CORE LEAD-SHEATHED HVAC SUBMARINE CABLE WITH TWISTED MAGNETIC ARMOR BASED ON BONDING TYPES USING COMSOL MULTIPHYSICS
ANALYSIS ON THREE-CORE LEAD-SHEATHED HVAC SUBMARINE CABLE WITH TWISTED MAGNETIC ARMOR BASED ON BONDING TYPES USING COMSOL MULTIPHYSICS
As the appeal and stockpile of energy increases, the quest for natural energy becomes incredibly essential due to the rapid commercial growth of several developing countries worldw...
TOGI Service Lines and Cable Installation: Concept Selection and Field Experience
TOGI Service Lines and Cable Installation: Concept Selection and Field Experience
ABSTRACT
This paper presents the concept for the TOGI service lines and cable bundle used to provide hydraulic and electric power and chemical injection fluid for...
Effect of Pipeline Thermal Expansion on Direct Electric Heating Cable
Effect of Pipeline Thermal Expansion on Direct Electric Heating Cable
Subsea Direct Electrical Heating (DEH) of pipelines has been in operation for more than 10 years and is therefore considered by most Operators as proven technology. Aside from the ...
Deep Learning Training Model Construction and Optimization of Cable Size Features in 3D Point Cloud Data
Deep Learning Training Model Construction and Optimization of Cable Size Features in 3D Point Cloud Data
Cables are widely used in power transmission, and the measurement of key dimensions of cables is an indispensable part of the cable preparation process to help ensure their quality...
Natural vibration and wind-induced response analysis of the non-fully symmetric Geiger cable dome
Natural vibration and wind-induced response analysis of the non-fully symmetric Geiger cable dome
Cable dome is a special flexible structure made of cable strut beam and membrane. Non-fully symmetric Geiger cable dome is a new Geiger cable dome with the characteristics of eight...
Wireline Cable Dynamics and Wellbore Diagnostics in the Deepwater Logging Environment
Wireline Cable Dynamics and Wellbore Diagnostics in the Deepwater Logging Environment
The evolving complexity of deepwater wellbores has created new challenges and risks for wireline evaluation. Geometries and depths challenge the foundational assumptions of traditi...
Surface Activated Bonding -from the Standard SAB to Modified SAB
Surface Activated Bonding -from the Standard SAB to Modified SAB
The surface activated bonding (SAB) was proposedin thelate 1980’s for bonding of metal to metal and to ceramics at room temperature. The standard SAB method is based on surface act...